The latest Investing Matters Podcast episode with London Stock Exchange Group's Chris Mayo has just been released. Listen here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0525
Bid: 0.05
Ask: 0.055
Change: 0.00 (0.00%)
Spread: 0.005 (10.00%)
Open: 0.0525
High: 0.0525
Low: 0.0525
Prev. Close: 0.0525
RRR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update

29 Apr 2024 08:19

RNS Number : 3843M
Red Rock Resources plc
29 April 2024
 

Red Rock Resources PLC

("Red Rock" or the "Company")

Update

 

29 April 2024

 

Red Rock Resources Plc, (AIM:RRR) ("Red Rock" or "the Company"), is a natural resource development company with interests in gold, base metals, battery metals, and hydrocarbons principally in Africa and Australia.

This release is an update further to the update of April 2024.

There is no update in relation to the DRC as we await the appointment and Parliamentary vote on the Prime Minister's new administration. With the selection of a President of the Parliament on 24th April, this vote is likely to take place after the President's return from a State visit to France.

In relation to the Burkina Faso gold project at Bilbale, a report has been received from the Company's consultant which is reproduced below verbatim.

"BILBALE SITE VISIT - Mar/Apr 2024

The author visited the Bilbale Project Licence area located in the Sud-Ouest Region, with Ali Barro and guided by Dieudonne Dakissaga, country manager and a geologist by training. The visit was carried out over several days in order to evaluate potential high-grade targets as well as the amenability of the area to support scalable operations and quick-start operations.

With a surface of 183.62 km², the Bilbale project area is located in the prolific Boromo greenstone belt. The region is a major gold producing district. The Gaoua gold deposit (4.4 Moz) is located 50 km to the south, and the Poura gold mine (3 Moz) is located 70 km to the north. The Wa gold deposit (>1 Moz) in Ghana is located 50 km to the south and the Konkera gold deposit (3.3 Moz) of Ampella Mining is located 110 Km to the south.

There is an extensive presence of artisanal gold working sites on the permit area. Seasonal surface gold digging are done by entire communities, in addition to high density artisanal mine sites targeting the spectrum from alluvial to hard-rock mining to depths of ~30 m. Several of these artisanal sites are in excess of ten years old , covering significant areas and still being worked. During this visit two brand new artisanal sites got underway!

Rock chip sampling in 2020 included samples reported at 8.1 g/tAu, 6.25 g/tAu, 2.57 g/tAu, 2.56 g/tAu, 1.74 g/t Au, and 1.19 g/tAu. These grades underscores why artisanal digging is ongoing over the project area.

At the Tampoa site however things have moved up a notch where an illegal miner brought in mechanised equipment and a large team of people - this kind of operation is not allowed under local mining law and WILL do significant damage to the legal permit holder! Whilst government will support the owner, it remains the permit holder prerogative to address the situation and put a stop to such operations. I was advised that this operation has been stopped - no mechanised equipment was seen operating during the visit - however significant stockpiles on site was still being washed using holding ponds and a pump-fitted borehole supplying constant large volume water for the operation. Clearly Company has to continuously enforce a real stoppage of this illegal operation! The only way to effect this is by constant presence and my advice is that this site immediately becomes the first quick-start alluvial test site.

Historical geophysical airborne survey by Sarama Mining Burkina (2011) revealed curved faults and shear zones, N-S trending, through the entire permit. It became clear as this visit unfolded that the structural geology of the permit area deserves significantly more attention. A great benefit to the Bilbale Project area is that it contains several rock outcrops, including a significant road-cut that has to date not been investigated. It is my opinion that this outcrop will play a key role in a better understanding of the relationship between local Birimian gold distribution and the structural history of the host rocks.

There has been some limited drilling carried out over the permit area by the current owner and previous holders. It was unfortunately not possible to inspect samples, pulps or rock-chips from these previous campaigns and I had to take a view on paper copies and previously published results only. In preparation for this site visit , I identified and subsequently confirmed 9 targets for further detailed study and surface evaluation for alluvial/elluvial placer potential of 6 targets.

PROPOSED WORK PROGRAM GOING FORWARD:

1. Embark on a detailed geo-structural mapping program of select areas

2. Embark on a quick-start program production testing alluvial and placer deposits employing specialist washing / concentration plants

3. plan and execute a drilling and associated assay program comprised of

a. auger drilling over placers

b. RC drilling testing below placers and other targets

c. Diamond core drilling for resource evaluations over deserving stage 3 targets

4. Permitting process to convert to Mining Licence(s) based on success.

CONCLUSION:

It is the authors' opinion that the Bilbale Permit holds significant potential that requires an aggressive program of value enhancement.

It is further my opinion that this permit can, if subjected to an appropriate exploration program, realize a significant Resource and Reserve in excess of 1 Moz over the next two years.

Dr Willem J. Smuts Pr.Sci.Nat. FSEG

(I am a Competent/Qualified Person under the meaning of the Major Minerals Codes as applied to various Stock Exchanges)"

The Company is currently arranging four time-critical workstreams: (a) transport of the washing and production equipment necessary for operations to Burkina Faso, (b) the passports and other paperwork for some 25 expert external staff who will be required to be in Burkina for the commencement of operations, (c) transport from Asia of hire plant for excavation, and (d) preparation of initial camp accommodation and eating and security facilities on site for an initial daytime workforce expected to exceed a hundred people. The first two of these workstreams have been subject to bureaucratic delays and some additional cost factors but are now under way.

The CEO and other senior personnel will be on site to oversee camp preparations from late next week, with a view to starting operations at scale from early June after arrival of personnel and equipment. This timetable is subject to no further delays at customs or in passport issuance or other official paperwork requirements.

Red Rock CEO Andrew Bell comments: "We are absolutely committed to driving this project to scaleable operation within weeks. Great progress has been made to overcome delays, and we have been working, and will continue to work, day and night, seven days a week, on this critical project implementation phase, with strict cost control."

For further information, please contact:

Andrew Bell 0207 747 9990 Chairman Red Rock Resources Plc

Bob Roberts 0203 8696081 Broker Clear Capital Corporate Broking

 

 

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRAFIFLDSDIAFIS
Date   Source Headline
2nd Jun 20232:48 pmRNSNotice of General Meeting
30th May 20236:17 pmRNSIssue of Equity and Total Voting Rights
30th May 20235:17 pmRNSIssue of Equity and Total Voting Rights
24th May 202312:09 pmRNSIssue of Equity and Total Voting Rights
23rd May 20234:40 pmRNSHolding(s) in Company
16th May 20235:03 pmRNSHolding(s) in Company
12th May 20234:31 pmRNSHolding(s) in Company
12th May 20237:00 amRNSIssue of Equity, PDMR/Director Holdings, TVR
11th May 20237:00 amRNSIssue of Equity and Total Voting Rights
5th May 20233:45 pmRNSVictoria Goldfields - Berringa Drilling Results
4th May 20232:40 pmRNSIssue of Shares and Total Voting Rights
14th Apr 20237:00 amRNSIssue of Equity
4th Apr 20237:00 amRNSPlacing and TVR
3rd Apr 20237:00 amRNSHalf-year Report
31st Mar 20234:27 pmRNSTotal Voting Rights
28th Mar 20237:00 amRNSEIA submitted for Zimbabwe lithium mining project
15th Mar 20232:36 pmRNSIssue of Equity
15th Mar 202312:15 pmRNSVictoria Goldfields, Australia - drilling update
8th Mar 20237:00 amRNSAsset Review and Current Developments
24th Feb 202310:05 amRNSIssue of Equity
16th Feb 202310:00 amRNSVictoria Goldfields - Beringa Update
10th Feb 20235:26 pmRNSResult of AGM
6th Feb 202311:00 amRNSPrice Monitoring Extension
11th Jan 20234:50 pmRNSNotice of AGM
9th Jan 202311:00 amRNSVictoria Goldfields Australia - Update
6th Jan 20237:00 amRNSBurkino Faso Exploration Update - Bilbale Project
29th Dec 202212:14 pmRNSFinal Results
19th Dec 202212:39 pmRNSDevelopment of Lithium Assets
16th Dec 202211:05 amRNSSecond Price Monitoring Extn
16th Dec 202211:00 amRNSPrice Monitoring Extension
15th Dec 20227:00 amRNSFund Raising
13th Dec 20227:00 amRNSDrilling begins at Historic Berringa Gold Mine
8th Dec 20222:16 pmRNSResult of Meeting
23rd Nov 20222:50 pmRNSNotice of GM
22nd Sep 20222:30 pmRNSAcquisition of Berringa Gold Mine Complete
21st Sep 20226:21 pmRNSPlacing, Appointment of Joint Broker and TVR
5th Sep 20227:00 amRNSUpdate on drilling at Bilbale
19th Aug 202210:41 amRNSSecond Tranche of CLNs and Warrants
15th Aug 20224:12 pmRNSResult of Meeting
10th Aug 202211:10 amRNSDirector/PDMR Shareholding
8th Aug 202210:17 amRNSDirector/PDMR Shareholding
5th Aug 20227:00 amRNSAsset Review and Current Developments
1st Aug 20222:00 pmRNSAssessment of Ajax Mine Potential
28th Jul 20227:00 amRNSNotice of GM
25th Jul 20227:00 amRNSIssue of convertible notes and warrants
6th Jul 20222:00 pmRNSVictoria Gold JV - Berringa Mine Acquisition
4th Jul 202212:48 pmRNSTotal Voting Rights
27th Jun 20223:30 pmRNSKimono Cobalt Project, DRC
13th Jun 20222:30 pmRNSDrill Results from Mt Bute, Victoria, Australia
8th Jun 20225:52 pmRNSIssue of Equity and Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.