If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

Share Price is delayed by 15 minutes
Get Live Data
0.021    0.00 (0.00%)
Bid:
0.02
Ask:
0.022
Spread: 0.002 (10.00%)
Market Cap: £2.01m
RRR Live PriceLast checked at - London Stock Exchange

Intraday Red Rock Resources Share Chart

Update

29 Jul 2010 14:25

RNS Number : 1800Q
Red Rock Resources plc
29 July 2010
 



RED ROCK RESOURCES PLC

Update

Dated: 29 July 2010

 

Red Rock Resources plc ("Red Rock" or the "Company"), the gold mining and exploration company with projects in Kenya and Colombia, and interests in steel feed and uranium, reports on progress at its operations.

 

Migori gold project: A helicopter geophysical VTEM programme (versatile time-domain electromagnetic system), comprising 378 line kilometers flown at 50m height on lines at 100m intervals has been flown by Geotech Airborne Ltd along the strike of the Macalder VMS mine at Migori, Kenya, covering both sides of the W-E trending anticline. Initial results are expected by end-August 2010.

 

A fixed wing magnetic/radiometric survey has been contracted over the whole license area with UTS-Aeroquest and is expected to start on 16 August. It will comprise 3,117 line kilometers flown at 30m height, with 2,295 line kilometers flown at a 200m spacing and 822 infill kilometers flown at a 50m spacing. Initial results are expected by mid-September 2010.

 

Metallurgical results are awaited from Amdel Laboratories on the Macalder tailings, and gold sample results from trenching at Mirema are awaited from SGS Laboratories in Mwanza. Trenching has continued at the Kowere prospect.

 

CSA Global Ltd have been contracted to carry out a preliminary JORC Resource estimate of the Macalder tailings.

 

Red Rock expects to finalise a drill programme of 5,000 metres to 10,000 metres during September 2010.

 

Colombia gold project: the Company continues to work closely with its local partner at the El Limón mine site and in Medellin on implementing the investment programme to increase production at El Limón and bring Machuca (La Aurora) into first production. The programme involves refurbishment of the treatment plant, improvement of ventilation, electric, and mine safety systems, pumping out the shaft at Machuca, recruitment of professional staff and workforce, and other matters. Progress has been good, with no significant bottlenecks reported to date. The Company expects to be able to report on percentage accomplishment and timetable shortly.

 

Exploration continues, investigating at surface areas to the north and east of the known mineralization. In one area a trench was dug and samples taken from a 10cm vein encountered. Samples were also taken from Levels 6 and 7 at El Limón for metallurgical testwork.

 

Jupiter Mines Ltd (ASX:JMS)(23.2% held): Progress continues with the fast-tracking of exploration of the Mt Ida Magnetite Project, the near-surface resource potential of which may be 1.1 bn tons to 1.3 bn tons. An RC (reverse circulation) drill programme of up to 11,000 metres began on 20 July, targeting the magnetic anomalies in the central area of Mt Ida. The drilling will test the interpreted geological model for magnetite and will in conjunction with the geological structural mapping enable the generation of an initial inferred magnetite resource at Mt Ida. A Level 2 Flora and Vegetation Survey has also been completed. Further information is given in the Jupiter Mines quarterly report issued today at: http://www.asx.com.au/asxpdf/20100729/pdf/31rl9jrvdspyzx.pdf

Sample results were received from the 2,046 metres of RC drilling at tenement E45/2641, part of the Oakover Manganese Project, which tested some priority VTEM targets on a wide-spaced grid for shallow VTEM conductors with a target hole depth of 50m. Significant intersections included:

 

- 2m at 35.35% Mn from 17m (100KRC177)

- 4m at 31.21% Mn from 33m including 1m at 49.60% (100KRC057)

- 4m at 26.89% Mn from surface (100KRC022)

- 6m at 25.02% Mn from 12m (100KRC001)

 

43 holes were drilled, of which 26 returned no significant mineralization, and 17 holes gave 19 significant intercepts of over 15% Mn were encountered. These latter are summarized below:

 

Hole

Prospect

From (m)

To (m)

Interval (m)

Mn%

Including

Fe%

LOI%

Al2O3%

P%

SiO2%

10OKRC0001

C12

12

18

6

25.03

1m @ 33.60

22.09

10.67

3.64

0.03

17.24

10OKRC0015

C12

0

10

10

23.95

4m @ 32.00

24.96

13.04

4.24

0.02

10.71

10OKRC015A

C12

8

10

2

22.00

1m @ 22.90

26.05

10.78

2.50

0.02

21.30

10OKRC0016

C12

2

12

10

18.36

1m @ 29.00

20.87

10.01

5.06

0.02

28.20

14

20

6

20.88

4m @ 25.02

20.75

11.37

7.06

0.02

20.03

10OKRC0022

C12

0

4

4

26.89

2m @ 31.85

22.44

12.01

2.33

0.02

14.12

10OKRC0028

C12

3

7

4

19.54

1m @ 25.00

11.68

7.76

2.41

0.01

44.68

10OKRC0029

C12

0

16

16

15.76

2m @ 25.45

25.78

10.60

5.20

0.02

23.23

10OKRC0030

C12

1

5

4

20.46

1m @ 23.50

34.58

12.13

1.66

0.01

7.06

23

25

2

16.50

1m @ 17.45

33.90

11.58

5.94

0.02

10.25

10OKRC0035

C12

0

2

2

19.93

1m @ 21.10

14.90

13.23

7.43

0.02

24.55

10OKRC0036

C12

5

7

2

22.65

1m @ 27.20

17.25

10.22

5.15

0.02

23.78

10OKRC0037

C12

0

5

5

17.16

1m @ 28.30

10.60

12.71

7.70

0.02

33.38

10OKRC0057

C11

33

37

4

31.21

1m @ 49.60

17.53

11.93

5.82

0.02

14.35

10OKRC0062

C11

8

10

2

17.65

1m @ 18.75

23.03

12.98

5.79

0.03

19.98

10OKRC0067

C11

0

4

4

16.80

n/a

20.40

12.05

8.84

0.02

24.50

10OKRC0073

C11

24

25

3

20.07

1m @ 32.90

19.62

9.72

6.04

0.03

24.40

10OKRC0077

C11

17

19

2

35.35

1m @ 39.40

18.25

11.18

1.43

0.01

13.08

10OKRC0079

C11

10

15

5

18.06

1m @ 24.60

26.21

10.74

3.61

0.03

22.66

 

Further information may be obtained at: http://www.asx.com.au/asxpdf/20100723/pdf/31rgjmkwbdg6rq.pdf

 

The Extraordinary General Meeting of Jupiter Mines Ltd shareholders to approve the acquisition of the Tshipi manganese mine in South Africa will be held on 12 August.

 

Resource Star Ltd (ASX:RSL)(26.3% held):An RC rig has been mobilized to site to begin the maiden 1,500 metre drill programme at the Machinga Rare Earth Project in Malawi, where the company's farm-in partners Globe Metals and Mining Ltd are operators. The objective is to test four different zones of heavy rare earth oxide (HREO) and high-grade niobium mineralisation intersected in trenches at the Machinga North target. Further information is given in the announcement issued today by Resource Star at: http://www.asx.com.au/asxpdf/20100729/pdf/31rl5z72qghnv6.pdf

 

New Resolution Geophysics have been contracted to fly 270 line kilometers of helicopter magnetics/radiometrics, at 20-30m height and on a 50m line spacing, over the Ilomba Hill uranium/niobium/rare earth prospect in N Malawi. This is expected to be completed in August.

 

Following the definition of a maiden JORC Inferred Resource of 4.6m lbs U3O8 at 270ppm, a follow-up drill programme is planned for the Autumn to expand the resource base and follow up areas of higher grade. The programme is expected to be finalized by mid-August.

 

In Australia, a third quarter drill programme is being contracted to follow up the uranium anomalies identified from airborne geophysics flown earlier in the year, and subsequent ground investigation, at the Edith River and Hayes Creek licenses in the Pine Creek Geosyncline of the Northern Territory.

 

Andrew Bell, Red Rock Chairman, comments: "Our core gold business continues its progress towards increased production. Our indirectly held interests also report significant progress. In this update we make reference to nearly 4,000 line kilometers of airborne geophysics ordered or under way, and we report on drill programmes completed or in process of perhaps 30,000 metres. Directly or through associates we now have continuous exploration activity on promising deposits and targets. In Malawi a maiden JORC resource at Livingstonia is being followed by maiden drilling at Machinga, and these are significant milestones for us. Elsewhere, we report that we are defining a new JORC Resource in Kenya, and that our associate in Australia is drilling out its prime magnetite property where Red Rock has a 1.5% production royalty, in order to move towards a JORC Resource declaration."

The geological information in this announcement has been reviewed and approved by Andrew Bell, a director of the Company and a Fellow of the Geological Society who is a qualified person as defined in the Note for Mining and Oil and Gas Companies, June 2009, of the London Stock Exchange.  

 

Enquiries:

 

Andrew Bell

 

 

0207 402 4580 or 07766 474849

 

Red Rock Resources plc

Chairman

Sandra Spencer

 

0207 402 4580 or 07757 660 798

 

Red Rock Resources plc

Public and Investor Relations

Peter Trevelyan-Clark/ Ben Jeynes

 

020 7444 0800

Religare Capital Markets

Nominated Adviser

Nick Emerson

 

01483 413500

Simple Investments Ltd

Broker

Updates on the Company's activities are regularly posted on its website, www.rrrplc.com.

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFFVDFIAFII
Date   Source Headline
28th Jan 20117:00 amRNSUpdate
24th Jan 201112:15 pmRNSExercise of Options
19th Jan 20117:50 amRNSAnnouncement re Jupiter Mines Limited
31st Dec 201012:00 pmRNSTotal Voting Rights
30th Dec 20103:11 pmRNSResult of AGM
29th Dec 201010:50 amRNSIssue of Equity
23rd Dec 20107:00 amRNSAnnual Financial Report
21st Dec 201011:00 amRNSUpdate - First Gold Production and other matters
17th Dec 20104:40 pmRNSSecond Price Monitoring Extn
17th Dec 20104:35 pmRNSPrice Monitoring Extension
14th Dec 20105:12 pmRNSIssue of Equity
14th Dec 20104:47 pmRNSSEDA and Loan
14th Dec 201012:22 pmRNSAscot Mining plc
14th Dec 20109:46 amRNSAnnouncement re Jupiter Mines Limited
13th Dec 20105:08 pmRNSAnnouncement re Resource Star Limited
13th Dec 201010:57 amRNSTwo Copper targets to be drilled at Migori
10th Dec 20101:10 pmRNSUpdate
3rd Dec 20103:19 pmRNSNotice of AGM; result of GM
1st Dec 20101:24 pmRNSUpdate on Ascot and Colombia
29th Nov 201012:21 pmRNSAscot Mining plc and Move to SETS
19th Nov 201010:34 amRNSInvestment in Ascot Mining plc - Replacement
19th Nov 20109:59 amRNSInvestment in Ascot Mining plc
17th Nov 20104:07 pmRNSUpdate and Notice of Meeting
9th Nov 20101:46 pmRNSUpdates re Colombia and Jupiter Mines
29th Oct 201011:38 amRNSTotal Voting Rights
19th Oct 201011:20 amRNSUpdate on Colombia
14th Oct 20108:46 amRNSUpdate re Jupiter Mines
11th Oct 20109:45 amRNSIssue of Equity
1st Oct 20104:41 pmRNSDirector/PDMR Shareholding
1st Oct 20103:12 pmRNSUpdate re Kansai Mining
1st Oct 20109:58 amRNSIssue of Equity
1st Oct 20109:56 amRNSDirector/PDMR Shareholding
30th Sep 20102:13 pmRNSUpdate
30th Sep 20101:22 pmRNSTotal Voting Rights
29th Sep 20107:00 amRNSIssue of Equity
28th Sep 20109:34 amRNSExercise of Options
23rd Sep 20103:38 pmRNSGrant of Options
20th Sep 20101:00 pmRNSHolding(s) in Company
17th Sep 20101:06 pmRNSLoan Agreement
14th Sep 201011:03 amRNSIssue of Equity - Replacement
14th Sep 201010:32 amRNSIssue of Equity
9th Sep 201012:41 pmRNSUpdate re Jupiter - Tshipi
31st Aug 20103:00 pmRNSTotal Voting Rights
31st Aug 20107:00 amRNSJupiter Mines Ltd - Mt Ida Magnetite Project
23rd Aug 20107:00 amRNSIssue of Equity
19th Aug 20102:24 pmRNSMigori Indicated Resource
18th Aug 20103:51 pmRNSUpdate
12th Aug 201012:42 pmRNSIssue of Equity
12th Aug 201012:41 pmRNSUpdate re Jupiter Mines
9th Aug 20103:07 pmRNSResource Star Edith River Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.