Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

Share Price is delayed by 15 minutes
Get Live Data
0.021    0.00 (0.00%)
Bid:
0.02
Ask:
0.022
Spread: 0.002 (10.00%)
Market Cap: £2.01m
RRR Live PriceLast checked at - London Stock Exchange

Intraday Red Rock Resources Share Chart

Kenya update

12 Jun 2013 15:19

RNS Number : 9058G
Red Rock Resources plc
12 June 2013
 



Red Rock Resources plc

("Red Rock" or the "Company")

 

Pit Optimisation Study for the Mikei Gold Project, Migori, SW Kenya

 

Date: 12th June 2013

 

Red Rock Resources plc (AIM:RRR), the mining and exploration company with an iron ore project in Greenland, a producing gold mine in Colombia and interests in steel feed, uranium and rare earths is pleased to announce the results of a Pit Optimisation Study ("The Study") on its Migori Gold Project, in which it has a combined direct and indirect investment of approximately 47%. Based on the technical and economic parameters the Company considers that these results demonstrate economic potential and support project advancement to Scoping Study level. The pit optimisation work has been undertaken by SRK Consulting (UK) Limited ("SRK").

 

Pit Optimisation Results

 

Highlights

 

·; Conceptual results from Pit Optimisation Study completed on the Mikei Gold Project ("MGP") supports on-going development to Scoping Study stage;

 

·; Nyanza ("NZ") prospect followed by the MK prospect show the best potential as starter pits due to lower metal price sensitivity and favourable conversion from Mineral Resources to diluted pit shell metal inventories (NZ ~77%);

 

·; 6.5 Mt diluted mineral inventory at 2.0 g/t Au for 419 koz Au at a stripping ratio of 4.3 (twaste:tore) contained within a 1,300 US$/oz pit shell, representative of the potential open pit mining inventory;

 

·; Identification of potential high grade starter pits at the NZ and MK prospects with a combined diluted mineral inventory of 1.8 Mt at 3.9 g/t Au for 221 koz Au and relatively low optimised pit shell Cash Cost of 476 US$/oz Au;

 

·; 11.4 Mt undiluted mineral inventory at 1.9 g/t Au for 689 koz Au contained within a 1,700 US$/oz pit shell, representative of the Mineral Resources limited by open pit potential; and

 

·; The results of the pit optimisation will be used to guide further Resource development including drilling, metallurgy and a more detailed scoping level study ahead of feasibility.

 

A more detailed discussion of the pit optimisation results and glossary can be found here:

http://www.rns-pdf.londonstockexchange.com/rns/9058G_-2013-6-12.pdf
 

 

SRK Comments on Project Potential

 

SRK concludes that the work completed to date (resource modelling, metallurgical test work and pit optimisations) is sufficient for a scoping study to be undertaken for the MGP. Additional potential exists to integrate a scoping study with the adjacent Macalder Tailings Resource to develop a larger overall project for Red Rock's Kenyan assets.

 

SRK Comments on Exploration Potential

 

The pit optimisation work demonstrates that the pit shell economics are limited for the KKM, KKM-West ("KW") and Gori Maria ("GM") deposits based on the current Mineral Resource, there is however potential for larger optimised pit shells for the MK and NZ deposit if geological grade continuity is realised and lateral and/or depth extensions to the high grade ore shoots.

 

Detailed interpretation work is on-going by site geologists to determine the structural controls on mineralisation and delineate the high grade ore shoot at the NZ prospect. This will guide future resource delineation drilling for improving confidence in grade continuity and investigating potential lateral or depth extensions to the Mikei Resource.

 

Further Work

 

With these results, the company is working on a detailed plan of activities to examine the potential of the MGP to be developed as a small scale open pit project, with particular focus on the NZ deposit. Further work on the MGP will include:

 

·; Drilling to test both the plunge extent of the high grade shoot at NZ, and the continuity and grade distribution within the defined system.

·; Exploration drilling along the Mikei shear zone to target potential lateral and depth extensions to current 1.2Moz JORC resource;

·; Advanced metallurgical test work to assess whether there is a correlation between the high sulphide content and a decrease in leach recoveries;

·; Possible geotechnical (RQD) drilling, further geodetic survey, and plant design and costing, hydrology and environment will be examined;

 

The work completed to date on the MGP (resource modelling, metallurgical test work and pit optimisations) is sufficient for a scoping level study to be undertaken. This would provide a conceptual evaluation of the project economics inclusive of production schedules, derived operating costs and capital cost estimates and a discounted cashflow model. The results of a scoping study, in addition to an economic assessment of the MGP would provide a more detailed project evaluation on which a decision to progress the project to advanced feasibility can be made.

 

Company Chairman Andrew Bell comments:

 

"This work takes the existing Resources, at the tonnages and grades so far reported, and gives us a snapshot of optimised pits at a certain gold price and certain cost assumptions. This shows where we have opportunity, and where we need to do more work. This is an important step forward on the path to feasibility." 

 

For further information contact:

 

Andrew Bell 020 7402 4580 or 07766 474849 Chairman Red Rock Resources plc

Sandra Spencer 020 7402 4580 or 07757 660 798 Investor Relations Red Rock Resources plc

Gerry Beaney / Daniela Amihood 020 7383 5100 NOMAD Grant Thornton Corp Finance

Nick Emerson 01483 413500 Broker Simple Investments Ltd

 

Updates on the Company's activities are regularly posted on its website, www.rrrplc.com.

 

The technical data included in the Pit Optimisation Study for this announcement has been prepared and compiled by Gabor Bacsfalusi, BEng, MAusIMM (CP), Senior Consultant (Mining Engineering) for SRK Consulting (UK) Ltd.

 

Forward Looking Statements

This report contains 'forward-looking information' that is based on the Company's expectations, estimates and projections as of the date on which the statements were made. This forward-looking information might include, among other things, statements with respect to the Company's business strategy, plans, objectives, performance, outlook, growth, shareholder value, projections, targets and expectations, Mineral Reserves and Resources, results of exploration and related expenses, property acquisitions, mine development, mine operations, drilling activity, sampling and other data, grade and recovery levels, future production, capital costs, expenditures for environmental matters, life of mine, completion dates, uranium prices, demand for uranium, and currency exchange rates.

 

Generally, this forward-looking information can be identified by the use of forward-looking terminology such as 'outlook', 'anticipate', 'project', 'target', 'likely', 'believe', 'estimate', 'expect', 'intend', 'may', 'would', 'could', 'should', 'scheduled', 'will', 'plan', 'forecast' and similar expressions. Persons reading this report are cautioned that such statements are only predictions, and that the Company's actual future results or performance may be materially different.

 

Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the Company's actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information. Forward-looking information is developed based on assumptions about such risks, uncertainties and other factors set out herein, including but not limited to the risk factors set out in the Company's Annual Report. This list is not exhaustive of the factors that may affect our forward-looking information. These and other factors should be considered carefully and readers should not place undue reliance on such forward-looking information. The Company disclaims any intent or obligations to update or revise any forward-looking statements whether as a result of new information, estimates or options, future events or results.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFTMJTMBABBMJ
Date   Source Headline
14th Mar 20226:22 pmRNSDirector/PDMR Shareholding
7th Mar 20224:05 pmRNSNotice of AGM
15th Feb 20224:41 pmRNSSecond Price Monitoring Extn
15th Feb 20224:36 pmRNSPrice Monitoring Extension
15th Feb 20222:06 pmRNSSecond Price Monitoring Extn
15th Feb 20222:01 pmRNSPrice Monitoring Extension
15th Feb 202212:52 pmRNSCopper and Cobalt Drilling in DRC
4th Feb 20227:00 amRNSAsset Review and Current Developments
28th Jan 20227:00 amRNSIssue of Equity, Exercise of Options, TVR
25th Jan 20227:00 amRNSOption Exercise, Directors' Dealings and TVR
19th Jan 20227:00 amRNSJudgement for Damages Obtained in DRC
7th Jan 20227:00 amRNSKenya Exploration Update
6th Jan 202211:26 amRNSLicences obtained at Bilbale and Boulon
6th Jan 20227:00 amRNSDRC Update
29th Dec 202112:21 pmRNSFinal Results
15th Dec 20217:00 amRNSDrilling starts in Victoria, Grant of New Licence
8th Dec 20217:00 amRNSKenya Exploration Update
7th Dec 202111:00 amRNSUpdate on Australian Joint Venture Subsidiary
16th Nov 20217:00 amRNSSummary of Gold Exposure
16th Nov 20217:00 amRNSDRC Projects Update
28th Oct 20219:54 amRNSHolding(s) in Company
28th Oct 20219:00 amRNSPrice Monitoring Extension
18th Oct 20219:44 amRNSLicence applications by Cote d'Ivoire subsidiary
11th Oct 20217:00 amRNSDRC Project - interim update
29th Sep 20217:00 amRNSInvestments Update
21st Sep 20214:11 pmRNSUpdate on Power Metal Resources and Australian JV
16th Sep 20213:40 pmRNSRRAL - historic mine workings, Victoria, Australia
16th Sep 202112:11 pmRNSPrice Monitoring Extension
16th Sep 202112:10 pmRNSSecond Price Monitoring Extn
16th Sep 20217:00 amRNSKenya Exploration Update
15th Sep 20214:41 pmRNSSecond Price Monitoring Extn
15th Sep 20214:36 pmRNSPrice Monitoring Extension
10th Sep 20211:45 pmRNSCompany Broker
27th Aug 20219:26 amRNSHolding(s) in Company
13th Aug 202111:05 amRNSSecond Price Monitoring Extn
13th Aug 202111:00 amRNSPrice Monitoring Extension
12th Aug 202110:52 amRNSDirector/PDMR Shareholding
10th Aug 20216:23 pmRNSKenya Exploration Update
9th Aug 202110:55 amRNSDRC Copper-Cobalt project - drilling update
9th Aug 20217:00 amRNSAustralian Gold Joint Venture update
26th Jul 20217:00 amRNSDirectorate Change
30th Jun 20215:47 pmRNSTotal Voting Rights
30th Jun 20219:34 amRNSDrilling contract awarded at Mikei Gold Project
29th Jun 20217:00 amRNSDrill Programme at DRC Copper-Cobalt Project
22nd Jun 20212:40 pmRNSHolding(s) in Company
10th Jun 20214:19 pmRNSHolding(s) in Company
4th Jun 20217:00 amRNSExercise of Warrants and Total Voting Rights
25th May 20217:00 amRNSDrill Programme to start at DRC Prospect
14th May 202111:55 amRNSInvestee update - Juno Minerals
10th May 20217:00 amRNSInvestee Entity Update - Elephant Oil Limited

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.