Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

Share Price is delayed by 15 minutes
Get Live Data
0.0235    0.0005 (2.17%)
Bid:
0.022
Ask:
0.025
Spread: 0.003 (13.636%)
Market Cap: £2.25m
RRR Live PriceLast checked at - London Stock Exchange

Intraday Red Rock Resources Share Chart

Kenya update

12 Jun 2013 15:19

RNS Number : 9058G
Red Rock Resources plc
12 June 2013
Β 

ο»Ώ

Red Rock Resources plc

("Red Rock" or the "Company")

Β 

Pit Optimisation Study for the Mikei Gold Project, Migori, SW Kenya

Β 

Date: 12th June 2013

Β 

Red Rock Resources plc (AIM:RRR), the mining and exploration company with an iron ore project in Greenland, a producing gold mine in Colombia and interests in steel feed, uranium and rare earths is pleased to announce the results of a Pit Optimisation Study ("The Study") on its Migori Gold Project, in which it has a combined direct and indirect investment of approximately 47%. Based on the technical and economic parameters the Company considers that these results demonstrate economic potential and support project advancement to Scoping Study level. The pit optimisation work has been undertaken by SRK Consulting (UK) Limited ("SRK").

Β 

Pit Optimisation Results

Β 

Highlights

Β 

Β·; Conceptual results from Pit Optimisation Study completed on the Mikei Gold Project ("MGP") supports on-going development to Scoping Study stage;

Β 

Β·; Nyanza ("NZ") prospect followed by the MK prospect show the best potential as starter pits due to lower metal price sensitivity and favourable conversion from Mineral Resources to diluted pit shell metal inventories (NZ ~77%);

Β 

Β·; 6.5 Mt diluted mineral inventory at 2.0 g/t Au for 419 koz Au at a stripping ratio of 4.3 (twaste:tore) contained within a 1,300 US$/oz pit shell, representative of the potential open pit mining inventory;

Β 

Β·; Identification of potential high grade starter pits at the NZ and MK prospects with a combined diluted mineral inventory of 1.8 Mt at 3.9 g/t Au for 221 koz Au and relatively low optimised pit shell Cash Cost of 476 US$/oz Au;

Β 

Β·; 11.4 Mt undiluted mineral inventory at 1.9 g/t Au for 689 koz Au contained within a 1,700 US$/oz pit shell, representative of the Mineral Resources limited by open pit potential; and

Β 

Β·; The results of the pit optimisation will be used to guide further Resource development including drilling, metallurgy and a more detailed scoping level study ahead of feasibility.

Β 

A more detailed discussion of the pit optimisation results and glossary can be found here:

http://www.rns-pdf.londonstockexchange.com/rns/9058G_-2013-6-12.pdf
Β 

Β 

SRK Comments on Project Potential

Β 

SRK concludes that the work completed to date (resource modelling, metallurgical test work and pit optimisations) is sufficient for a scoping study to be undertaken for the MGP. Additional potential exists to integrate a scoping study with the adjacent Macalder Tailings Resource to develop a larger overall project for Red Rock's Kenyan assets.

Β 

SRK Comments on Exploration Potential

Β 

The pit optimisation work demonstrates that the pit shell economics are limited for the KKM, KKM-West ("KW") and Gori Maria ("GM") deposits based on the current Mineral Resource, there is however potential for larger optimised pit shells for the MK and NZ deposit if geological grade continuity is realised and lateral and/or depth extensions to the high grade ore shoots.

Β 

Detailed interpretation work is on-going by site geologists to determine the structural controls on mineralisation and delineate the high grade ore shoot at the NZ prospect. This will guide future resource delineation drilling for improving confidence in grade continuity and investigating potential lateral or depth extensions to the Mikei Resource.

Β 

Further Work

Β 

With these results, the company is working on a detailed plan of activities to examine the potential of the MGP to be developed as a small scale open pit project, with particular focus on the NZ deposit. Further work on the MGP will include:

Β 

Β·; Drilling to test both the plunge extent of the high grade shoot at NZ, and the continuity and grade distribution within the defined system.

Β·; Exploration drilling along the Mikei shear zone to target potential lateral and depth extensions to current 1.2Moz JORC resource;

Β·; Advanced metallurgical test work to assess whether there is a correlation between the high sulphide content and a decrease in leach recoveries;

Β·; Possible geotechnical (RQD) drilling, further geodetic survey, and plant design and costing, hydrology and environment will be examined;

Β 

The work completed to date on the MGP (resource modelling, metallurgical test work and pit optimisations) is sufficient for a scoping level study to be undertaken. This would provide a conceptual evaluation of the project economics inclusive of production schedules, derived operating costs and capital cost estimates and a discounted cashflow model. The results of a scoping study, in addition to an economic assessment of the MGP would provide a more detailed project evaluation on which a decision to progress the project to advanced feasibility can be made.

Β 

Company Chairman Andrew Bell comments:

Β 

"This work takes the existing Resources, at the tonnages and grades so far reported, and gives us a snapshot of optimised pits at a certain gold price and certain cost assumptions. This shows where we have opportunity, and where we need to do more work. This is an important step forward on the path to feasibility."Β 

Β 

For further information contact:

Β 

Andrew Bell 020 7402 4580 or 07766 474849 Chairman Red Rock Resources plc

Sandra Spencer 020 7402 4580 or 07757 660 798 Investor Relations Red Rock Resources plc

Gerry Beaney / Daniela Amihood 020 7383 5100 NOMAD Grant Thornton Corp Finance

Nick Emerson 01483 413500 Broker Simple Investments Ltd

Β 

Updates on the Company's activities are regularly posted on its website, www.rrrplc.com.

Β 

The technical data included in the Pit Optimisation Study for this announcement has been prepared and compiled by Gabor Bacsfalusi, BEng, MAusIMM (CP), Senior Consultant (Mining Engineering) for SRK Consulting (UK) Ltd.

Β 

Forward Looking Statements

This report contains 'forward-looking information' that is based on the Company's expectations, estimates and projections as of the date on which the statements were made. This forward-looking information might include, among other things, statements with respect to the Company's business strategy, plans, objectives, performance, outlook, growth, shareholder value, projections, targets and expectations, Mineral Reserves and Resources, results of exploration and related expenses, property acquisitions, mine development, mine operations, drilling activity, sampling and other data, grade and recovery levels, future production, capital costs, expenditures for environmental matters, life of mine, completion dates, uranium prices, demand for uranium, and currency exchange rates.

Β 

Generally, this forward-looking information can be identified by the use of forward-looking terminology such as 'outlook', 'anticipate', 'project', 'target', 'likely', 'believe', 'estimate', 'expect', 'intend', 'may', 'would', 'could', 'should', 'scheduled', 'will', 'plan', 'forecast' and similar expressions. Persons reading this report are cautioned that such statements are only predictions, and that the Company's actual future results or performance may be materially different.

Β 

Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the Company's actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information. Forward-looking information is developed based on assumptions about such risks, uncertainties and other factors set out herein, including but not limited to the risk factors set out in the Company's Annual Report. This list is not exhaustive of the factors that may affect our forward-looking information. These and other factors should be considered carefully and readers should not place undue reliance on such forward-looking information. The Company disclaims any intent or obligations to update or revise any forward-looking statements whether as a result of new information, estimates or options, future events or results.

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
MSCFTMJTMBABBMJ
Date   Source Headline
19th Feb 20256:05 pmRNS-RUpdate on DRC proceedings
4th Feb 202512:24 pmRNSHolding(s) in Company
31st Jan 202511:45 amRNSIssue of Shares and Warrants
29th Jan 20254:17 pmRNSDRC Update, Equity Issue, Convertible extension
24th Jan 20258:00 amRNSFollow up - DRC Arbitration
23rd Jan 20252:13 pmRNSHolding(s) in Company
21st Jan 20252:12 pmRNSHolding(s) in Company
15th Jan 20251:04 pmRNSFollow up - DRC
31st Dec 202410:42 amRNSIssue of Shares and Warrants, Total Voting Rights
13th Dec 20241:52 pmRNSFinal Results
11th Dec 20247:50 amRNSUpdate – Australian Gold Project
22nd Nov 20245:44 pmRNSHolding(s) in Company
18th Nov 20247:45 amRNSUpdate
6th Nov 20247:00 amRNSUpdate of Major Interests - Follow Up
23rd Oct 20247:00 amRNSIssue of Equity
14th Oct 20247:05 amRNS-RUpdate
10th Oct 20243:32 pmRNSResult of Meeting
7th Oct 20247:00 amRNSUpdate of major interests
27th Sep 202410:46 amRNSHolding(s) in Company
26th Sep 20244:37 pmRNSShare Subscription, TVR
23rd Sep 20242:45 pmRNSNotice of GM
16th Sep 20247:00 amRNSIvory Coast - Update
28th Aug 20245:02 pmRNSHolding(s) in Company
27th Aug 20247:00 amRNSShare Subscription
27th Aug 20247:00 amRNSReplacement: Extension of Convertible Notes
23rd Aug 20248:40 amRNSExtension of Convertible Notes, Issue of Shares
16th Aug 20244:28 pmRNSIssue of Equity, Total Voting Rights
16th Aug 202412:17 pmRNSUpdate on Australian Assets
30th Jul 202412:48 pmRNSHolding(s) in Company
15th Jul 20242:05 pmRNSHolding(s) in Company
10th Jul 202412:58 pmRNSHolding(s) in Company
4th Jul 20243:08 pmRNSShare Subscription, Total Voting Rights
3rd Jul 20246:26 pmRNSIssue of Equity, Total Voting Rights
26th Jun 20245:25 pmRNSHolding(s) in Company
19th Jun 202410:16 amRNSCompletion of Purchase and Issue of Shares
12th Jun 20243:30 pmRNSVictoria Gold Assets - update on Agreement
10th Jun 20241:48 pmRNSUpdate on Burkina Faso, Australia and DRC
10th Jun 20247:00 amRNSUpdate on Agreement
31st May 20242:32 pmRNSHolding(s) in Company
29th Apr 20248:19 amRNSUpdate
22nd Apr 20247:00 amRNSIssue of Equity, Directors' Dealings and TVR
11th Apr 20247:00 amRNSIssue of Equity
5th Apr 20247:00 amRNSDRC and Gold Assets Update
28th Mar 20247:00 amRNSHalf-year Report
13th Mar 20247:59 amRNSConditional agreement, Australian gold subsidiary
6th Mar 20247:00 amRNSDRC and Gold Assets Update
27th Feb 20247:00 amRNSCo-operation in Next Phase at Bilbale
20th Feb 20243:26 pmRNSHolding(s) in Company
19th Feb 20247:00 amRNSResult of AGM
14th Feb 202412:21 pmRNSDRC and Australia Gold Asset Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.