Adrian Hargrave, CEO of SEEEN, explains how the new funds will accelerate customer growth Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0525
Bid: 0.05
Ask: 0.055
Change: 0.00 (0.00%)
Spread: 0.005 (10.00%)
Open: 0.0525
High: 0.0525
Low: 0.0525
Prev. Close: 0.0525
RRR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Commercial Ferrosilicon Production at Steelmin

23 Jul 2018 07:00

RNS Number : 3528V
Red Rock Resources plc
23 July 2018
 

Red Rock Resources PLC

("Red Rock" or the "Company")

Commercial Ferrosilicon Production at Steelmin

 

23 July 2018

Red Rock Resources Plc, the natural resource development company with interests in gold and steel feed materials, announces, further to the announcement of 21st February 2018, an update on progress in commissioning of the ferrosilicon plant at Jajce, Bosnia owned by a subsidiary of Steelmin Limited ("Steelmin"). Steelmin is 22% owned by Red Rock.

On 5th May 2018 the commissioning process began as Steelmin began to heat and power up Furnace 5 at Jajce. continuing over subsequent weeks to build to full power and to conduct laboratory checks on material being produced.

The plant is now in commercial production, running at rated capacity of 24MW and Steelmin currently forecasts that it will be EBITDA positive for the month of July.

Steelmin's plant will initially consist of the refurbished Furnace V with capacity for production of 29,000t of ferrosilicon p.a. and 5,800t of microsilica, and after a planned refurbishment of a second furnace will have a combined annual capacity of 48,720 tonnes ferrosilicon (FeSi 75) and 9,700 tonnes of microsilica.

 

Andrew Bell, Chairman of Red Rock comments: "Management at Steelmin has delivered an important milestone in achieving stable commercial production from Furnace V. We expect to see progress continuing over coming months."

 

Steelmin - Background

The Steelmin plant and facility is located in central Bosnia, 104 kilometres north west of Sarajevo. The complex, formerly part of Electrobosna, was originally built in the 1970s by Elkem, a major silicon and alloy producer based in Norway, and was one of the largest and best known producers of ferrosilicon and silicon metal in Europe. It was closed down in 1992 due to the Bosnian War, was then privatised and the six furnaces were sold off in two separate parts in 2000. The plant was brought back online until finally being shuttered again in 2004 due to increasing exports pressure from Chinese producers.

Anti-dumping regulations have since been implemented by the European Commission; which significantly reduced both Chinese and Russian exports into Europe, allowing prices to stabilize and rise over time. The second, smaller, facility split off from the original is now being operated by the Italian ferro-alloy producer Metalleghe, and has been successfully producing next to Steelmin's plant for the past 12 years.

 

Steelmin - Assets

Steelmin controls furnaces IV and V from the original Electrobosna complex. Furnace V has a 48MVA installed power Elkem furnace, and is connected to two chimneys on the roof of the production hall. Furnace IV, the smaller of the two, has a 30 MVA Tagliaferri furnace with three chimneys, preventing the emission of gases in ambient air to comply with EU regulatory requirements. Given its larger total capacity Steelmin decided to bring furnace V on initially and then move to recommission furnace IV later in 2018.

In addition to the two furnaces, the facility in Jajce houses a filtration plant, warehouse storage for raw materials, pouring and dispatch hall as well as a plant for process water recirculation.

Refurbishment for the second furnace is expected to begin later in 2018 or in 2019.

Power remains the most significant input cost to ferrosilicon production and this is provided by abundant and economical hydro-power available across the region. Furnace feedstock such as quartz is also sourced from the region.

 

Steelmin Products and Markets

 

Steelmin intends initially to produce ferrosilicon containing 75% silicon and 25% iron, a product primarily used as a deoxidising agent and to add electrical conductivity and corrosion resistance to steel. A by-product of ferrosilicon production will be microsilica, which is a dust used in the manufacture of speciality concretes in the construction industry as well as in advanced refractories and ceramics. Furnace V is expected to produce 29,000t of ferrosilicon per annum as well as 5,800t of microsilica.

Over time Steelmin is expected to produce both ferrosilicon as well as additional silicon alloys that offer higher margins and additional upside. Currently ferrosilicon trades at around €1440 a ton compared with between €1280-1350 a ton at the time of Red Rock's investment in June 2017.

European ferrosilicon production depends critically on access to cheap power (locally generated hydroelectric power in the case of Jajce) since this is up to half the cost of production. Prices are historically driven by steel production levels, the level of Chinese pricing and production allowed into Europe, as well as the associated export and anti-dumping tariffs. Since late 2016 overall Chinese export prices have begun to rise, positively impacting European produce prices. Key input costs such as metallurgical coal are also closely correlated to realized ferrosilicon prices.

 

For further information, please contact:

Andrew Bell 0207 747 9990 Chairman Red Rock Resources Plc

Scott Kaintz 0207 747 9990 Director Red Rock Resources Plc

Roland Cornish/ Rosalind Hill Abrahams 0207 628 3396 NOMAD Beaumont Cornish Limited

Jason Robertson 0207 374 2212 Broker First Equity Limited

 

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

Glossary

 

Ferrosilicon: ferrosilicon produced at Steelmin contains 75% silicon, and is primarily used as a deoxidising agent in steel production, adding electrical conductivity and corrosion-resistance properties to steel

 

Microsilica: a by-product of silicon and ferrosilicon production, used in the construction industry for its added strength and abrasion resistance

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDLLFESDTIIFIT
Date   Source Headline
14th Nov 20131:59 pmRNSIssue of Shares & Purchase of Jupiter Mines Shares
8th Nov 20131:14 pmRNSUpdate
9th Oct 20134:43 pmRNSConvertible Bond Conversion
9th Oct 20134:40 pmRNSUpdate
4th Oct 20133:16 pmRNSDelisting of Jupiter Mines from ASX
20th Sep 20135:08 pmRNSGreenland Update
18th Sep 20135:43 pmRNSIssue of Convertible Note. Cancellation of options
9th Sep 20134:03 pmRNSAppointment of Broker
9th Sep 20137:00 amRNSUpdate
5th Sep 20133:48 pmRNSResource Star Ltd Update
30th Aug 20135:02 pmRNSUpdate
27th Aug 20134:28 pmRNSConvertible Bond Conversion & Options Cancellation
8th Aug 20135:23 pmRNSIssue of Shares and Convertible Note
8th Aug 20135:21 pmRNSHolding(s) in Company and Change of Name of Broker
5th Aug 20134:35 pmRNSUpdate
2nd Aug 20138:54 amRNSResource Star Ltd - Binding Term Sheet Signed
23rd Jul 201312:51 pmRNSUpdate
5th Jul 20139:07 amRNSFurther sale of shares in Jupiter Mines
2nd Jul 201310:22 amRNSBoard Change
12th Jun 20133:19 pmRNSKenya update
13th May 20137:00 amRNSPlacement of Shares
9th May 20132:24 pmRNSUpdate
4th Apr 20134:34 pmRNSIssue of Shares under Share Incentive Plan
4th Apr 201311:36 amRNSIssue of Equity
28th Mar 20137:01 amRNSHalf Yearly Report
11th Mar 20135:50 pmRNSIssue of Equity
18th Feb 20134:35 pmRNSPrice Monitoring Extension
8th Feb 20135:53 pmRNSUpdate on Proposed Sale of Interest in Greenland
1st Feb 20134:35 pmRNSPrice Monitoring Extension
1st Feb 20134:28 pmRNSIssue of Equity
29th Jan 20136:01 pmRNSGrant of Options
11th Jan 20135:55 pmRNSAdmission of Shares - Replacement
8th Jan 201312:55 pmRNSUpdate on Greenland and Jupiter
21st Dec 201211:05 amRNSOperational Update
20th Dec 20125:30 pmRNSPlacement of Shares and Loan Refinancing
19th Dec 20125:49 pmRNSPlacement of Shares
19th Dec 20125:49 pmRNSGreenland Havik JORC Mineral Resource Estimate
17th Dec 20127:00 amRNSIssue of Equity
14th Dec 20122:13 pmRNSKenya update
6th Dec 20125:14 pmRNSGreenland update
29th Nov 20121:51 pmRNSResult of AGM
28th Nov 201212:01 pmRNSProposed Sale of Interest in NAMA Greenland Ltd.
21st Nov 201212:43 pmRNSJupiter Mines update
21st Nov 201211:15 amRNSIssue of Equity
14th Nov 201212:09 pmRNSUpdate
8th Nov 20121:59 pmRNSJupiter Mines - Mt Ida Project Update
29th Oct 20122:18 pmRNSGreenland Update
19th Oct 20127:00 amRNSFinal Results
17th Oct 20126:15 pmRNSSale of Shares in Jupiter Mines
16th Oct 20126:23 pmRNSGreenland Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.