SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRosebank Regulatory News (ROSE)

Share Price Information for Rosebank (ROSE)

Share Price is delayed by 15 minutes
Get Live Data
350.00    12.00 (3.55%)
Bid:
350.00
Ask:
352.00
Spread: 2.00 (0.571%)
Market Cap: £3.46b
ROSE Live PriceLast checked at - London Stock Exchange

Intraday Rosebank Share Chart

Uranium Exploration Update

19 Sep 2007 07:02

Vane Minerals PLC19 September 2007 September 19, 2007 VANE Minerals Plc (AIM: VML) Uranium Exploration Update VANE Minerals Plc ("VANE" or the "Company") announces an update on its on-goingnorthern Arizona breccia pipe exploration activities conducted by VANE Minerals(US) LLC, its wholly-owned uranium subsidiary. HIGHLIGHTS - Mineralized pipe discovered at Miller Southwest with 200ft of continuous mineralization - All pipes contain uranium mineralization - All targets drilled warrant additional drilling - Additional pipe targets acquired taking total targets to 38 Drill holes have been completed on three of the four known pipes that VANE holds- Miller, Big Red, and Red Dike. In addition, a hole has been completed on thenewly identified Miller Southwest target and has confirmed that the target is amineralized breccia pipe. Matthew Idiens, Director of Corporate Development commented "These initialresults are encouraging and show the targets all warrant additional drilling;new down-hole geophysics techniques on these drilled holes should assist inpositioning the next drill holes. Having tested 5 targets and with 4 of themshowing such encouraging results we believe the total pipe package, which nowstands at 38 targets, offers substantial potential". Miller Southwest The first hole completed on the project, hole 691-3 was completed to 1520 feetand discovered a new breccia pipe. The hole encountered 200 feet of continuousmineralization from 1230-1430 feet in the targeted ore horizon of the Hermit andSupai Formations. Within this interval an intercept averaging 0.10% eU3O8 over16.5 feet was intersected that contained a high of 0.33% eU3O8. Red Dike Two holes have been completed, 698-1 and 698-2, both of which are mineralized,even though both holes did not appear to be in the pipe through the entireHermit-Supai horizon. The gamma log in hole 698-1 reveals above background gammalevels from 495 to 595 feet and 965 to 1095 feet (which is above the favorablehorizon), and also shows anomalous radioactivity in the bottom 300 feet of thehole which appeared to be outside the pipe. In addition, the log showed 5 feetof uranium mineralization at the Coconino-Hermit contact with grade up to 0.05%eU3O8. In hole 698-2, one narrow zone of weak mineralization was encounteredbetween 1325 and 1335 feet. The maximum grade encountered was 0.02% eU3O8. Miller Pipe On the Miller Pipe, a second hole was completed on the inferred northwest partof the pipe. This hole, 691-2, was completed to the depth of 1605 feet andintersected the pipe through the favorable horizon and encountered anomalousuranium mineralization for 1113 feet from 402 to 1515 feet including thefavorable Hermit-Supai section. The results from Big Red Pipe were detailed in the press release of 3 May 2007. Rabbit target A programme of 11 shallow holes was completed on the Rabbit target. All targetsdrilled to date warrant additional exploration. VANE is investigating the useof down-hole geophysics in the completed holes in order to assist in theplanning of further drill holes where the position of the pipe at depth has beendifficult to locate. The following is a summary list of deep holes completed on the northern Arizonapipe project to date: PROJECT HOLE DRILL MINERALIZATION THICKNESS SURVEY NUMBER DEPTH(ft) GRADE (ft-%) (ft @ azimuth) Big Red 696-1 1,144 Top 100' Trace Min Deviation 13' @ 205 degrees Miller 691-1 1,445 565' - 568' Mineralized Deviation 44' @ 040 degrees 691-2 1,605 402' - 1,515' Mineralized Deviation 26' @ 285 degrees Miller SW 691-3 1,520 1,230' - 1,430' Mineralized 1,344' - 1,354' 10.0' - 0.13% Deviation 37' @ 010 degrees Red Dike 698-1 1,525 981' - 984' Mineralized Deviation 45' @ 020 degrees 1,120' - 1,121' 1.0' - 0.05% 1,225'-1,520' Mineralized 698-2 1,525 1,323' - 1,325' Mineralized Deviation 8'@ 150degrees 1,334' - 1,335' Mineralized TOTAL FOOTAGE 8,764NUMBER OF HOLES 6NUMBER OF 4PROJECTS The breccia pipe drilling programme has been successful in that all holesdrilled have been completed and all targets warrant additional exploration. Theprogramme has been designed to test as many targets as possible under thecurrent funding capabilities without exhausting permitted targets or risking theloss of the drill rig through under utilisation.. New Acquisitions VANE has acquired an additional 1560 acres of Arizona State lands where 4 pipetargets have been identified to date. This now takes the total number oftargets under VANE control to 38, 5 of which have now had first phase drilling. Kristopher K. Hefton, Chief Operating Officer VANE Minerals (US) LLC, BScGeology, who meets the criteria of a qualified person under the AIM Rules -Guidance for Mining, Oil and Gas Companies, has reviewed and approved thetechnical information contained within this announcement. Enquiries: VANE Minerals PlcMatthew Idiens+44 (0) 20 7667 6322 Ambrian Partners LimitedRichard Brown+44 (0) 20 7776 6417 Parkgreen CommunicationsLaura Llewelyn / Beth Harris+44 (0) 20 7851 7480 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
10th Apr 201710:15 amRNSMexican IVA recovery update
24th Mar 201712:23 pmRNSGrant of options under incentivisation scheme
22nd Mar 20177:00 amRNSParadox Acreage Update
17th Mar 20177:00 amRNSMexican IVA recovery update
7th Mar 20171:38 pmRNSUpdate on Paradox Basin permitting process
6th Mar 20177:00 amRNSPotential disposal of Mexican milling operations
23rd Jan 20177:00 amRNSOperations update
13th Dec 201612:36 pmRNSResult of General Meeting
25th Nov 20169:15 amRNSNotice of General Meeting
2nd Nov 20165:38 pmRNSTotal Voting Rights
19th Oct 20162:19 pmRNSIssue of Equity to raise £1 million
22nd Sep 20167:00 amRNSHalf-year Report
15th Sep 20167:00 amRNSNotice of Results
4th Jul 20167:00 amRNSRose Gypsum progresses in Tendering Round in Cuba
30th Jun 201610:28 amRNSResult of AGM
28th Jun 201610:10 amRNSDirector/PDMR Shareholding
7th Jun 20167:00 amRNSFinal Results
3rd May 20167:00 amRNSFundraising for Cuba opportunities
27th Apr 20167:00 amRNSUpdate on Operations and Assets
13th Apr 20163:35 pmRNSStmnt re Share Price Movement
2nd Mar 20165:46 pmRNSHolding(s) in Company
16th Feb 20165:45 pmRNSHolding(s) in Company
9th Dec 20157:00 amRNSOperational update
16th Nov 20157:00 amRNSUpdate re Farm-in Agreement and Directorate Change
28th Oct 201511:15 amRNSHolding(s) in Company
28th Sep 20157:00 amRNSHalf Yearly Report
26th Aug 20154:00 pmRNSHolding(s) in Company
21st Aug 20157:00 amRNSOil & Gas Update
21st Jul 20153:05 pmRNSHolding(s) in Company
30th Jun 20156:29 pmRNSTotal Voting Rights
30th Jun 201511:20 amRNSResult of AGM
16th Jun 201511:00 amRNSResult of General Meeting
4th Jun 20157:00 amRNSFinal Results
20th May 20157:01 amRNSProposed Issue of Equity and Notice of GM
20th May 20157:00 amRNSPositive Mancos Shale Core Results
14th May 201510:10 amRNSStatement re. Press Comment
28th Apr 20157:00 amRNSMancos shale operations update
22nd Apr 20157:00 amRNSBoard Change
31st Mar 20157:00 amRNSMancos operations update - Uinta Basin, Utah
9th Mar 20157:00 amRNSOperations update
2nd Mar 20157:00 amRNSIncreased Acerage & Operational Update
18th Feb 20155:00 pmRNSHolding(s) in Company
17th Feb 20157:00 amRNSCompletion of Wate Sale
13th Feb 20157:00 amRNSGrant of Options
12th Feb 20157:00 amRNSDirectorate Change
3rd Feb 20157:00 amRNSOil & Gas and Operational Update
13th Jan 20157:00 amRNSOperational update
2nd Jan 20157:00 amRNSSale of interest in Wate Mining Company LLC
31st Dec 20147:00 amRNSUpdate on State 16-42 Paradox Well
31st Dec 20147:00 amRNSSpudding of State 1-34 Mancos Well

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.