SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRosebank Regulatory News (ROSE)

Share Price Information for Rosebank (ROSE)

Share Price is delayed by 15 minutes
Get Live Data
350.00    12.00 (3.55%)
Bid:
350.00
Ask:
352.00
Spread: 2.00 (0.571%)
Market Cap: £3.46b
ROSE Live PriceLast checked at - London Stock Exchange

Intraday Rosebank Share Chart

Operations update

9 Mar 2015 07:00

RNS Number : 8477G
Rose Petroleum PLC
09 March 2015
Ā 



Rose Petroleum plc ("Rose" or the "Company")

Operations update

Ā 

Rose Petroleum plc, the AIM-listed (Ticker: ROSE) natural resources company, is pleased to provide an operational update on activities within its US onshore oil and gas division which is made up of a 75% working interest in over 250,000 gross acres in the highly prospective Uinta and Paradox Basins in Utah.

Ā 

Highlights

State 1-34 Mancos Well, Uinta Basin, Utah

Ā· Completion rig now mobilised to verify the commerciality of the potential conventional hydrocarbon discovery identified below the Mancos Shale formation

Ā· Preliminary side wall core analyses have been received from Weatherford confirming expectations regarding lithology and porosity

Ā· Production tests on multiple intervals will follow and, subject to successful testing, the Company plans to hook-up to a production facility to commence production

Ā· The analytical work on the whole cores recovered from the primary Mancos Shale formation is expected to be completed in Q2 2015

o Data will be used to orient the direction of a horizontal lateral well in the Mancos and to optimise fracture stimulation design of the horizontal wellbore

Ā 

Paradox activity update

Ā· Permitting process underway for Rose's 61 square mile 3-D seismic programme to identify a first well location. Shooting is expected to commence in H2 2015, subject to permits.

Ā· Fidelity, which owns the Cane Creek Field south of Rose's Paradox leasehold, has completed a further producing well demonstrating the area's strong potential - this brings the total number of new producing wells drilled by Fidelity since 2012 to 23 wells with 20 additional wells currently permitted to be drilled.

o The Cane Creek Unit #28-3 well was completed in the Paradox Clastics at a sustained rate of 600 BOPD through the month of January 2015

Ā· CCI Paradox Upstream, a division of energy merchant company Castleton Commodities International, has completed two high volume gas producing wells in the wet gas window in the southern end of the field

o Combined the two wells have produced over 4.5 MMCFG/D since November of 2014 and CCI currently has plans to drill a third well in the same vicinity

Ā 

Matthew Idiens, Group CEO, commented:

"The next few months are a key time in the development of the Company as we commence the completion of multiple intervals in the conventional reservoir, targeting production in Q2 2015. Concurrently, we continue with the analysis of the whole core from the Mancos Shale, and the development of this unconventional target remains our key priority given the significant potential that it presents.

Ā 

"While the current oil and gas climate presents challenges to the sector, our projected low breakeven cost of below US$20 per barrel of oil equivalent from the unconventional Mancos Shale, makes our assets commercial and attractive at both current and lower oil prices. This differentiates us from our peers. Additionally, regional activity in the Paradox continues to highlight the upside available within our oil and gas division and we are progressing the 3D seismic permitting process."

Ā 

State 1-34 well, conventional reservoir

The Company is pleased to report that the completion rig has been mobilised on schedule in line with the Group's strategy to generate production from its conventional targets as it awaits the results of the Mancos core analyses. This rig will run production tests on multiple intervals within the conventional target including:

Ā 

Ā· the Chinle Formation (from 2,968 to 2,978')

Ā· the Salt Wash Formation (from 1855 to 1859'; 1794 to 1802'; 1762 to 1776'; and 1692 to 1700')

Ā· the Brushy Basin Formation (from 1494 to 1518'; 1439 to 1447')

Ā· the Dakota Formation (from 1246 to 1257')

Ā 

Subject to successful testing of these formations, the Company anticipates commencing production during Q2 2015.

Ā 

Preliminary side wall core analysis confirms the dominate lithology of the conventional reservoirs to be quartz (80 to 95%) with relatively minor parts of clay (2 to 10%) and carbonaceous material (1 to 10%). The majority of porosity is secondary porosity from the leaching of silica and calcite with lesser volumes of micro porosity and primary porosity. Based on the preliminary results of the side wall cores, Rose remains optimistic about the potential of the conventional reservoirs in the well.

Ā 

The primary purpose of the well, other than production from the conventional targets, is to gather data from the Mancos Shale. Based on the mud logs and open hole logs, the preliminary results for the Mancos are encouraging. Ryder Scott Company calculated mid-case gross Unrisked Recoverable Prospective Resource Estimates for Rose's Mancos assets of 709 million barrels of oil ("MMBO") and 4.26 trillion cubic feet of gas ("TCFG") and risk adjusted recoverable reserves of 212.7 MMBO and 1.28 TCFG. With this level of recoverable reserve potential and the positive initial data from the State 1-34 well, the Mancos Shale is the Company's initial primary focus while the Paradox 3-D is underway.

Ā 

The analytical work on the whole cores is expected to be completed in Q2 2015 and will be used to orient the direction of a horizontal lateral well in the Mancos and to optimise fracture stimulation design of the horizontal wellbore.

Ā 

Paradox activity update

The Company is pleased to note that activity continues even during lower commodity prices in the Paradox Basin in southeastern Utah. Rose continues the permitting process of its 61 square mile 3-D seismic programme which it hopes to begin shooting in H2 2015, subject to permits. Upon completion of the 3-D acquisition and interpretation, Rose will select the location for its first Paradox well with anticipated spud in 2016.

Ā 

Recent notable activity includes:

Ā 

Fidelity

Directly south of Rose's Paradox leasehold, in December of 2014 Fidelity completed the Cane Creek Unit #28-3 well out of the Paradox Clastics at a sustained rate of 600 BOPD through the month of January 2015. This brings the total number of new producing wells drilled by Fidelity since 2012 to 23 wells with 20 additional wells currently permitted to be drilled.

Ā 

CCI Paradox Upstream - Denver, Colorado

In the gas window on the southern end of the Paradox Clastic area, CCI Paradox Upstream, a division of Castleton Commodities International, an energy merchant company (formerly Louis Dreyfus Highbridge Energy) has completed two high volume gas wells. The two wells have combined for over 4.5 MMCFG/D since November of 2014. CCI currently has plans to drill a third well in the same vicinity.

Ā 

CCI owns 150,000 net acres in the area, as well as gas processing facilities, 262 miles of gathering system and 180 oil and gas wells. The assets were acquired from Patara Oil and Gas LLC in early 2013, who in turn acquired the assets from EnCana in 2010.

Ā 

For more information on CCI and its parent company please go to http://www.cci.com/.

Ā 

John Blair (BSc Geology and MSc Geophysics), Director of Oil & Gas for Rose Petroleum plc, who meets the criteria of a qualified person under the AIM Rules - Note for Mining and Oil & Gas Companies, has reviewed and approved the technical information contained within this announcement.

Ā 

**ENDS**

Ā 

For further information please visit www.rosepetroleum.com or contact:

Ā 

Matthew Idiens (Group CEO)

Rose Petroleum plc

Tel: +44 (0) 20 7236 1177

John Blair (CEO)

Rose Petroleum (US) LLC

Tel: +1 (303) 390 3866

Jeremy Porter

Allenby Capital

Tel: +44 (0) 20 3328 5656

Alex Price

Allenby Capital

Tel: +44 (0) 20 3328 5656

Elisabeth Cowell

St Brides Partners Ltd

Tel: +44 (0) 20 7236 1177

Lottie Brocklehurst

St Brides Partners Ltd

Tel: +44 (0) 20 7236 1177

Ā 

About Rose Petroleum

Rose Petroleum plc (AIM Ticker: ROSE) is focusing on developing its oil & gas portfolio, while seeking to create value from its existing mining, milling and porphyry copper exploration portfolio.

Ā 

In March 2014, Rose signed a farm-in agreement under which its newly formed subsidiary, Rose Petroleum (Utah) LLC, can earn 75% of certain oil, gas and hydrocarbon leases covering approximately 230,000 acres in Grand and Emery Counties, Utah, USA, within the Paradox and Uinta basins.

Ā 

In May 2014, Rose published the results of its reserve report prepared by Ryder Scott Company on the Mancos and Paradox Oil & Gas Projects. Un-risked Prospective (Recoverable) Hydrocarbon Resources on a Mean Case basis for the collective total Mancos Shale and Paradox Formation combined was 1,825.07 MMBO (million barrels of oil) and 6,447.87 BCFG (billion cubic feet of gas).

Ā 

In June 2014, the Company successfully raised £6.5m by way of an oversubscribed conditional placing and subscription to develop the Mancos and Paradox assets in Eastern Utah, and the completion of a further £3.5 million fundraise was announced on 5 December 2014.

Ā 

In October 2014, Rose acquired 100% of the assets of a privately owned SEP - Cisco Dome, LLC and various other associated entities for US$1.5 million in cash. The acquired assets included 11,000.02 gross / 8,250.02 net acres of highly prospective Mancos acreage, a gas compression station and gas processing plant as well as 17 producing wells and 35 shut-in wells.

Ā 

In December 2014, Rose spudded its first well in the Uinta Basin taking core samples from both the Mancos Shale and also a conventional target. Completion of the conventional target is planned for early Q2 2015, whilst the whole core taken within the Mancos is analysed for optimisation of the well stimulation programme for a horizontal well in the Mancos Shale.

Ā 

Rose intends to build on these projects to establish a balanced international asset portfolio. For further information please consult the Company's website: www.rosepetroleum.com

Ā 

Ā 

Ā 

Ā 

Ā 

Ā 

This information is provided by RNS
The company news service from the London Stock Exchange
Ā 
END
Ā 
Ā 
DRLFVLLBEXFXBBD
Date   Source Headline
20th Aug 20259:36 amRNSSchedule One Update - Rosebank Industries plc
20th Aug 20257:00 amRNSECI Acquisition Completion & Interim Results 2025
21st Jul 20259:00 amRNSHolding(s) in Company
15th Jul 20258:25 amRNSHolding(s) in Company
7th Jul 20256:24 pmRNSHolding(s) in Company
7th Jul 202511:38 amRNSHolding(s) in Company
7th Jul 202510:50 amRNSHolding(s) in Company
7th Jul 20257:00 amRNSHolding(s) in Company
4th Jul 20252:48 pmRNSHolding(s) in Company
4th Jul 20257:00 amRNSSchedule One - Rosebank Industries plc
3rd Jul 20258:19 amRNSAdmission of New Ordinary Shares
1st Jul 202511:41 amRNSResuls of General Meeting and Open Offer
20th Jun 202511:40 amRNSHolding(s) in Company
19th Jun 202512:17 pmRNSHolding(s) in Company
17th Jun 20256:12 pmRNSDirector/PDMR Shareholding
17th Jun 20255:58 pmRNSHolding(s) in Company
16th Jun 20254:49 pmRNSHolding(s) in Company
13th Jun 20255:25 pmRNSHolding(s) in Company
11th Jun 20257:30 amRNSRestoration - Rosebank Industries Plc
11th Jun 20257:00 amRNSPublication of Admission Document
6th Jun 20253:34 pmRNSResults of the Institutional Capital Raise
6th Jun 20257:00 amRNSAcquisition of ECI and Capital Raise
2nd Jun 20259:00 amRNSSuspension - Rosebank Industries plc
2nd Jun 20259:00 amRNSPossible Acquisition
8th May 202512:11 pmRNSAGM 2025 Results
6th May 20256:10 pmRNSHolding(s) in Company
4th Apr 20254:16 pmRNSAnnual Financial Report
12th Mar 20257:30 amRNSRestoration - Rosebank Industries plc
11th Mar 20255:45 pmRNSWithdrawal from proposed acquisition
19th Feb 20256:18 pmRNSAudited results for seven month period to 31/12/24
19th Feb 202511:58 amRNSPossible Acquisition
19th Feb 202511:49 amRNSSuspension - Rosebank Industries plc
22nd Aug 20244:00 pmRNSNotice of Results
31st Jul 20247:00 amRNSTotal Voting Rights
19th Jul 20241:30 pmRNSHolding(s) in Company
17th Jul 20243:45 pmRNSHolding(s) in Company
16th Jul 20248:30 amRNSHolding(s) in Company
15th Jul 20248:00 amRNSHolding(s) in Company
12th Jul 20244:15 pmRNSHolding(s) in Company
12th Jul 20241:00 pmRNSHolding(s) in Company
11th Jul 20248:03 amRNSAdmission to Trading on Aim/First Day of Dealings
3rd Aug 202012:51 pmRNSChange of Name to Zephyr Energy plc & website
29th Jul 20203:17 pmRNSResult of AGM
30th Jun 20207:00 amRNSFinal Results and notice of AGM
8th Jun 20204:30 pmRNSHolding(s) in Company
29th May 20207:00 amRNSGrant of options
5th May 20204:20 pmRNSHolding(s) in Company
1st May 20207:00 amRNSOperations and Strategy Update
10th Feb 20207:00 amRNSUpdate on restructuring of the Paradox project
10th Feb 20207:00 amRNSUpdate on McCoy Lease Working Interest Acquisition

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.