The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRockfire Regulatory News (ROCK)

Share Price Information for Rockfire (ROCK)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.185
Bid: 0.18
Ask: 0.19
Change: -0.03 (-13.95%)
Spread: 0.01 (5.556%)
Open: 0.215
High: 0.20
Low: 0.185
Prev. Close: 0.215
ROCK Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

High grade germanium intersected at Molaoi

4 Mar 2024 07:00

RNS Number : 3629F
Rockfire Resources PLC
04 March 2024
 

4 March 2024

Rockfire Resources plc

("Rockfire" or the "Company") High grade germanium intersected at Molaoi

Rockfire Resources plc (LON: ROCK), the base metal, precious metal, and critical mineral exploration company, is pleased to announce that the Company's active drilling program at its 100%-owned Molaoi zinc deposit in Greece has encountered the highest germanium grade drilled by Rockfire so far.

 

Highlights

 

· Holes MO_GTK_0010 and MO_GTK_011 are the final holes drilled as part of our twinning program to replicate historical holes. These 4 twinned (replicate) holes were drilled to gain confidence in the positioning of mineralisation within the resource, which is largely established from historical drilling of 176 diamond drill holes during the 1980's.

 

· Hole MO_GTK_010 intersected 0.67m @ 9.9% Zn, 23.0g/t Ag and 26.0g/t Ge from 76.30m depth. A second, deeper zone at 79.10m depth intersected 1.22m @ 4.6% Zn, 1.4% Pb, 23.0g/t Ag and 22.4g/t Ge. No sampling occurred at these depths in the original drill hole being replicated from the 1980's (AN23).

 

· Hole MO_GTK_011 intersected the highest germanium grade drilled by Rockfire so far at Molaoi. From 155m depth, 0.6m @ 136.5g/t Ge was intersected, along with 34.4% Zn and 95.6g/t Ag. This interval occurs within a broader zone of 2.3m @ 11.6% Zn, 54.94g/t Ag and 50.88g/t Ge.

 

· Hole MO_GTK_011 also intersected a deeper interval starting from 197m depth, which averages 13.44m @ 4.37% Zn, 1.62% Pb, 32.54g/t Ag and 20.85g/t Ge. The original hole (AN018), which was replicated by hole 11 intersected 4.60m @ 7.34% Zn. The variation in grade and width is explained by differences in sampling intervals and sampling lengths.

 

· Diamond drilling is continuing, with the third resource expansion hole in progress.

 

· Observations of the core show visible zinc mineralisation is being intersected in holes drilled deeper than historical drilling. This may result in the resource being expanded at depth once the analyses are completed at the laboratory.

 

· Further, observations in the core also show visible zinc mineralisation is being intersected in holes drilled further to the north of historical drilling. This may result in the resource being expanded towards the north once the analyses are completed at the laboratory.

 

· Rockfire is striving to expand the zinc resource at Molaoi. A JORC Inferred Resource of 250,000 tonnes of zinc equivalent metal has been estimated at Molaoi, and the Company is targeting a zinc equivalent resource of between 400,000 tonnes and 450,000 tonnes.

 

 

Drill Hole

UTM

UTM

Relative

Total

Azimuth

Dip

Number

EAST

NORTH

Level (m)

Depth (m)

(°Degrees)

(°Degrees)

HMO_001

665538.89

4077814.43

180

248.20

250

-60

HMO_002

665199.79

4078360.69

212

250.20

220

-65

HMO_003

665487.00

4078025.90

195

300.00

270

-55

 

Plan view of the zinc resource (light blue colour), showing the location of historical drillholes (black dots), Rockfire geotechnical holes (red dots) and Rockfire resource expansion holes (green dots).

 

 

David Price, Chief Executive Officer of Rockfire, commented:

"Molaoi has an Inferred JORC resource of 250,000 tonnes of zinc equivalent metal. Our overall objective is to increase the resource to between 400,000 and 450,000 tonnes of zinc equivalent metal content, which would provide a 10-year mine life for a modest underground mining operation."

 

"Drilling is continuing at Molaoi. Hole HMO_001 was designed to in-fill a very large drilling gap in the resource. Visual observations of zinc mineralisation in the core suggest that the hole has been successful in filling that gap. Assay results are awaited, so it is premature to predict the grade until the results from the analyses are available. Core from this hole is at the laboratory, awaiting analysis."

 

"Hole HMO_002 was drilled approximately 450m to the northwest of the resource. A faulted offset of the mineralisation was interpreted, and this hole was designed to test that faulting theory. Visual observations of the core suggest that this theory is correct, with visible zinc being recorded in the geological logging of the drill hole. Again, assay results will determine the grade of this intersection. This hole has not been sent to the laboratory yet and is currently being cut and sampled."

 

"Drilling of hole HMO_003 is in progress. This hole is designed to drill deeper, beneath the historical drilling to extend the mineralisation deeper. The hole is currently above the target depth, but it is encouraging that visible zinc is being observed in short intervals well above the anticipated depth to mineralisation."

 

"This is an exciting expansion phase of drilling, and our field team is pleased to observe zinc mineralisation in each of the holes at the predicted depths. This expansion drilling will continue in our effort to achieve the +400,000 tonnes of zinc equivalent resource being targeted. Both depth and strike extensions are being tested in alternate drill holes. We will continue to inform the market as results become available.

 

 

For further information on the Company, please visit www.rockfireresources.com or contact the following: 

 

Rockfire Resources plc:

info@rockfire.co.uk

David Price, Chief Executive Officer

Allenby Capital Limited (Nominated Adviser & Broker):

Tel: +44 (0) 20 3328 5656

John Depasquale / George Payne (Corporate Finance)

Guy McDougall / Matt Butlin (Sales and Corporate Broking)

 

Qualified Person Statement

The technical information in this announcement is based on information compiled by Mr David Price, the Chief Executive Officer of Rockfire Resources plc, who is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM). Mr Price has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which has been undertaken to qualify as a "Qualified Person" in accordance with the AIM Rules Guidance Note for Mining and Oil & Gas Companies. Mr Price consents to the inclusion in the announcement of the matters based on their information in the form and context in which it appears.

Notes to Editors

 

Rockfire Resources plc (LON: ROCK) is a gold, base metal and critical mineral exploration company, with a high-grade zinc/lead/silver/germanium deposit in Greece and a portfolio of gold/copper/silver projects in Queensland Australia.

 

§ The Molaoi deposit in Greece has a JORC Inferred Resource of 2.3 million tonnes @ 11 % ZnEq. for 250,000 tonnes of ZnEq. This resource uses a 4% low-grade cut, with individual elemental grades of 9.4 % Zn, 1.7 % Pb and 47 g/t Ag. This equates to 210,000 tonnes of zinc, 39,000 tonnes of lead and 3.5 million ounces of silver.

 

§ The Plateau deposit in Queensland has a JORC resource of 131,000 ounces of gold and 800,000 ounces of silver, using a 0.5g/t Au cut off. 53,000 of these ounces lie within the top 100m from surface. Plateau is subject to a joint venture with ASX-listed Sunshine Metals Ltd (ASX:SHN).

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLJJMTTMTAMBPI
Date   Source Headline
23rd May 20197:34 amRNSExercise of Option to Acquire Copper Dome
22nd May 201912:33 pmRNSClear targets defined at Copper Dome
22nd May 201911:54 amRNSFinal Results
20th May 20197:00 amRNSCardigan Dam returns broad, coherent gold anomaly
10th May 20198:53 amRNSUpdated Corporate Presentation
7th May 20197:00 amRNSDouble Event surface anomaly continues to expand
1st May 20199:15 amRNSAppointment of Non-executive Director
18th Apr 20197:50 amRNSField Exploration Update
22nd Mar 20199:06 amRNSHigh-grade copper found at Copper Dome
12th Mar 20198:15 amRNSCopper Dome initial surface geochemistry completed
1st Mar 201912:30 pmRNSAppointment of Non-Executive Director
28th Feb 20195:00 pmRNSTotal Voting Rights
28th Feb 20197:00 amRNSAppointment of Joint Broker
27th Feb 20199:34 amRNSExploration initiated at Copper Dome
26th Feb 20193:21 pmRNSHolding(s) in Company
22nd Feb 20199:41 amRNSReplacement: Result of General Meeting
18th Feb 20191:30 pmRNSResult of General Meeting
6th Feb 201910:25 amRNSHolding(s) in Company
5th Feb 201911:00 amRNSSoils add near-surface, high-grade gold targets
28th Jan 20197:42 amRNSCompany Update and Placing
14th Jan 201912:19 pmRNSSampling underway to infill Double Event
7th Jan 201911:39 amRNSUpdate on Papua New Guinea Prospects
24th Dec 201812:05 pmRNSDirectorate Change
24th Dec 201812:00 pmRNSChange of Adviser
18th Dec 20189:53 amRNSOutstanding gold target identified at Kookaburra
27th Nov 201811:00 amRNSUpdated Presentation
26th Nov 201812:37 pmRNSOption to acquire a high-potential copper project
19th Nov 20187:04 amRNSDrilling intersects bonanza gold at Double Event
14th Nov 20189:58 amRNSDouble Event drilling complete - assays expedited
8th Nov 20189:38 amRNSExtension drilling starts at Double Event
7th Nov 201812:29 pmRNSHolding(s) in Company
22nd Oct 20182:05 pmRNSSecond Price Monitoring Extn
22nd Oct 20182:00 pmRNSPrice Monitoring Extension
19th Oct 20187:37 amRNSMarengo drilling results & exploration update
9th Oct 201810:04 amRNSIP data highlights strong target at Copperhead
1st Oct 20187:00 amRNSGrant of New Licence Surrounding Mt Leyshon Mine
27th Sep 20187:00 amRNSInterim Results
19th Sep 20187:05 amRNSDrilling Program Complete - Sulphides Intersected
10th Sep 20187:00 amRNSDrilling underway at Marengo
29th Aug 201811:19 amRNSUpdated Presentation
21st Aug 20189:20 amRNSAdmission of Shares and Issued Share Capital
15th Aug 20189:44 amRNSHolding(s) in Company
13th Aug 20188:24 amRNSMaterial increase to exploration portfolio
9th Aug 20181:08 pmRNSAccelerated Exploration Financing and Joint Broker
1st Aug 201811:00 amRNSPrice Monitoring Extension
31st Jul 20187:00 amRNSMagnetics greatly enhance drill targets at Marengo
18th Jul 20188:26 amRNSThird gold target located at Marengo, Queensland
12th Jul 201810:45 amRNSHolding(s) in Company
2nd Jul 20182:26 pmRNS56,000T copper in Copperhead historical estimate
27th Jun 201811:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.