Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRMM.L Regulatory News (RMM)

  • There is currently no data for RMM

Drilling Stage Update

20 Oct 2005 15:35

Rambler Metals & Mining PLC20 October 2005 20th October 2005 Rambler Moves to Detailed Drilling Stage The Company is pleased to report that it is set to commence the next stage ofits drilling program at the Rambler Project where it is targeting thedevelopment of additional reserves and resources on the former copper and goldproducing property in Baie Verte, Newfoundland. The key targets under evaluationare the Ming Horizon massive sulphide copper and gold mineralization and theMing Footwall Zone stringer copper mineralization. Historic mining on the property resulted in production of more than 2 milliontonnes of copper and gold rich ore over a 10-year period until mining operationsceased in 1984 upon approach of the then existing property boundary. This next phase of the drilling program will consist of focussed directionaldrilling and follows an initial reconnaissance-scale drilling phase. Reconnaissance Drilling The reconnaissance drilling, recommended in the Competent Person's Reportassociated with the Company's AIM quotation, was initiated in April. This phasewas designed to test the potential broader scope of the system and is nownearing completion. The highlight from the reconnaissance program is Hole 8 (see news release dated2005-08-04), which has intersected the direct down-plunge extension ofhistorically recognized mineralized trends 885 feet (270 metres) beyond thedeepest level tested in 2004. In addition to intersecting 247 feet of coppermineralization in 6 separate intervals within the Footwall Zone, this holeidentified higher than expected gold grades from massive sulphide zones on theMing Horizon including 7.3 g/t gold and 1.7 per cent copper over 19.5 feet (5.94metres). Additional results from this part of the program will be released upon receiptof pending assay and geophysical data. "To date we have drilled over 11,000 meters and have completed the regionalportion of the drill program and are looking forward to drilling the moretightly spaced holes that can add reserves and resources to the resource basethe property already has, " stated Chairman Harry Dobson. " A dewatering programis also currently being considered in order to allow us access to historicallyidentified areas of both high grade gold and copper mineralization that can notbe as effectively tested by surface drilling." The more detailed evaluation of the Ming Horizon massive sulphide and the MingFootwall Zone (will be completed using directional drilling techniques andsystems. This system allows for "branch" holes to be guided away from "trunk"holes with a high degree of accuracy. The reconnaissance spaced drill holes,including hole 8, completed during the first part of the drilling program willserve as the trunk holes for detailed testing of both the Footwall Zone and theoverlying Ming Horizon. For the depths being evaluated at the Ming Horizon on the Rambler Project newbranch holes can test the zone on average 50 to 100 metres from the trunk holepierce points. The directional drilling will allow for a much higher level ofcontrol and anticipated total lower cost compared to drilling the same targetsas individual holes from surface using conventional techniques. The Company is also evaluating the merit and feasibility of dewatering thehistoric workings in order to better evaluate certain zones, including the 1807gold zone and the remaining developed massive sulphide ore located near thebottom of previous underground infrastructure. Access to the workings wouldalso enable exploration drifting and underground drilling below historicallyaccessed levels. Guy Wilkes Justine Howarth / Ana RibeiroOcean Equities Parkgreen CommunicationsT: 020 7786 4370 T: 020 7493 3173 Exploration on the Rambler property is being conducted by Altius Resources Inc.under a service agreement with Rambler Metals and Mining plc. All drill holeshave produced 47.6 millimetre diameter (1.875-inch) NQ diamond drill core. Thedrill core is descriptively logged on site, aligned, marked for sampling andthen split in half, longitudinally, using a diamond saw blade. One-half of thecore is preserved in core boxes for future reference. The samples comprising theother half of the core are bagged, sealed and delivered directly to theanalytical laboratory by Altius personnel. Base metal-bearing samples arenominally 1 metre to 1.8 metres (3.28 to 5.90 feet) in length except wherespecific geologic parameters require that a smaller interval be sampled.Samples with suspected precious metal content are nominally one metre or less,depending on the geological circumstances. The sawed samples are delivered directly to Eastern Analytical Ltd. inSpringdale, Newfoundland by Altius personnel where they are dried, crushed andpulped. Samples are crushed to approximately -10 mesh and split using a rifflesplitter to approximately 300 grams. The sample split is pulverized using aring mill to approximately 98% minus 150 mesh. In addition to regular samples,blank samples and quarter-split samples are also submitted for crushing/pulping. The sample pulps are picked up directly at Eastern Analytical by Altiuspersonnel and returned to the project site at which point analytical standardsamples and duplicate samples from previous batches are inserted into the samplestream. All sample rejects are also retrieved from Eastern Analytical by Altiuspersonnel and securely stored by Altius. The sample pulps are shipped by courier to Activation Laboratories Ltd. inAncaster, Ontario for analysis. A typical analysis consists of three,industry-standard components: (1) an aqua regia digestion followed by a 34 element ICP analysis, (2) a gold assay consisting of a one assay ton fire assay with finish by atomic absorption, and (3) an assay of specific base metals by aqua regia digestion followed by atomic absorption spectroscopy for those elements which exceed the limits of ICP accuracy. Check assays for the Rambler project are being conducted by ALS Chemex, usingindustry-standard techniques posted on their website. The drill programme andsampling protocol are being supervised by J.Geoffrey Thurlow, Ph.D., P.Geo., ofVMS Consultants Inc. and a Director of Altius; a Qualified Person as definedunder the Canadian Securities Administrators' National Instrument 43-101. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
31st Jul 20159:40 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARESi
20th Jul 20157:00 amRNSPrefeasibility Study
22nd Jun 20157:00 amRNSFinancial Results for the Third Quarter 2015
4th Jun 20157:00 amRNSExploration Update at Ming Mine Operation
21st May 20157:00 amRNSThird Quarter 2015 Production Results
5th May 20157:02 amRNSRambler Ships More High Grade Copper Concentrate
19th Mar 20157:00 amRNSSecond Quarter & Interim Financial Results
23rd Feb 20157:00 amRNSSecond Quarter 2015 Production Results
9th Feb 20157:00 amRNSProgress Update on the Lower Footwall Zone
30th Jan 20157:00 amRNSRambler Implements Revised Plan at the Ming Mine
29th Dec 20147:00 amRNSHolding(s) in Company
17th Dec 20147:00 amRNSFifth High Grade Copper Concentrate Shipment
9th Dec 20147:00 amRNSFirst Quarter 2015 Unaudited Financial Results
4th Dec 20143:18 pmRNSResult of AGM
2nd Dec 20147:00 amRNSResource and Technical Update and DMS Update
27th Nov 20147:00 amRNSFirst Quarter 2015 Production Results
26th Nov 20144:50 pmRNSUpcoming Events
17th Nov 20147:00 amRNSHammerdown Gold Mine Update
29th Oct 20147:00 amRNSProposed Change to Board of Directors
27th Oct 20147:00 amRNSFinancial Results Year Ended July 31 2014
23rd Sep 20147:00 amRNSFourth Copper Concentrate Shipment Delivered
9th Sep 201412:30 pmRNSRambler Provides Positive Update
21st Aug 20147:00 amRNSFourth Quarter and Year End Production Results
5th Aug 201412:00 pmRNSRambler Continues Its Investment in Marathon Gold
18th Jul 20149:49 amRNSHolding(s) in Company
3rd Jul 20144:30 pmRNSCopper Concentrate Shipment
19th Jun 20141:15 pmRNSQ3 Financial Results - Replacement
19th Jun 20141:11 pmRNSNotification of Major Interest in Shares
19th Jun 20147:00 amRNSFINANCIAL RESULTS FOR QUARTER ENDED 30 APRIL 2014
27th May 20147:00 amRNSMaritime Resources Corp. Private Placement
22nd May 20143:00 pmRNSLittle Deer Drilling Update
22nd May 20147:00 amRNSThird Quarter Operating Results
23rd Apr 20147:00 amRNSRambler Ships More High Grade Copper Concentrate
2nd Apr 201412:00 pmRNSRambler Invests Further in Marathon Gold
26th Mar 20148:03 amRNSHoldings in Company
24th Mar 201411:10 amRNSMarathon Continues to Succeed with Drilling
20th Mar 20147:00 amRNSFinancial Results Q2 and Interims ended 31 Jan2014
3rd Mar 20147:00 amRNSRambler Makes Final Payment to Sprott Facility
19th Feb 20147:05 amRNSBoard Appointment
19th Feb 20147:00 amRNSSecond Quarter 2014 Operating Results
6th Feb 20142:00 pmRNSRambler and Thundermin Commence Drilling
3rd Feb 20147:00 amRNSRambler Reduces Debt Facility
27th Jan 20147:00 amRNSUpdate of Reserve and Resource Estimate
8th Dec 20105:07 pmRNSExercise of Options
12th Nov 200810:53 amRNSGrant of Options
3rd Sep 200812:06 pmRNSHolding(s) in Company
15th Apr 20085:14 pmRNSHolding(s) in Company
21st Jan 20082:24 pmRNSAnnual Report and Accounts
7th Jan 20089:13 amRNSResult of AGM
11th Dec 20077:00 amRNSChange of Adviser

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.