We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRMM.L Regulatory News (RMM)

  • There is currently no data for RMM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Diamond Drill Update

1 Oct 2018 07:00

RNS Number : 4330C
Rambler Metals & Mining PLC
01 October 2018
 

October 1, 2018

 

Rambler Provides an Update on Diamond Drilling

Exploration at its Ming Copper-Gold Mine

 

 

London, England - Newfoundland and Labrador, Canada - Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ("Rambler" or "the Company"), a copper and gold producer, explorer, and developer today provides an update on its underground exploration program at its Ming Copper-Gold Mine in Eastern Canada.

Exploration Update

· 11,232 meters of delineation and exploration drilling has been completed from January 1 to August 31, 2018, at an average all-in direct drilling cost of CDN$75 per meter;

· Exploration drilling in the Ming North Zone (see Figure 1) has discovered significant mineralization down plunge of the historical mining limits higher in the mine. The current Mineral Resource and Reserve includes material down to the 705 level. The holes announced in this press release extend the high grade massive sulphide zone an additional 300 meters down plunge. This new mineralization is defined over a strike length of approximately 70 meters;

· A total of 2,027 meters of new drilling with composited down-hole widths include assay highlights of:

o R18-722-01 - 19.0 meters of 4.1% copper with 2.8 g/t gold

o R18-722-02 - 7.3 meters of 2.8% copper with 0.73 g/t gold

o R18-722-12 - 25.5 meters of 9.4% copper with 5.1 g/t gold

o R18-722-15 - 17.0 meters of 3.1% copper with 2.3 g/t gold

· Lower footwall zone ('LFZ') diamond drilling has been mostly focused on ore stope delineation to allow for the timely completion of final design of well-controlled stopes ahead of planned production.

 

Norman Williams, President and CEO, commented:

"The latest underground diamond drilling in the Ming North Zone has returned some of the thickest massive sulfide mineralization and highest copper and gold grades encountered on the property to date. With the top of this mineralization only 65 meters from existing development, this area provides a tremendous opportunity for the Company to bring a significant amount of higher grade material into the mine plan and mill feed in 2019. The potential exists to extend the Ming North body even deeper with continued drilling.

"Exploration at the Ming Mine has long been successful in returning consistent grades over impressive widths. The deep drilling surface program completed in December, 2017, returned 1.65% copper over 102.0 meters (see press release November 27, 2017) from the Lower Footwall Zone. With the results reported here, we have now shown that the grade and thickness of both the Lower Footwall and Ming North Massive Sulfide zones improve at depth.

"We look forward to providing further updates on the Ming Mine exploration program, along with a global mineral resource and reserve update, early in 2019."

 

The Ming North Zone

 

The Ming Mine first came into production in 1972. Over a 10 year period it extracted approximately 2.1 million short tons at 3.5 % copper with 0.7 oz/t of gold. The main massive sulfide orebody exploited during the historic mining era was the Ming North Zone. However, it was believed that the zone narrowed above the 660 level to uneconomical mining widths just prior to the mine's closure in 1982. Through updated 3D modeling techniques, and a better understanding of the nature of the mineralization, we now know that the mineralized strike length narrows locally, but this impact is minimized to just a few mining levels where barren mafic intrusions intersect the hanging wall/ footwall contact. The new diamond drilling into the Ming North Zone below the 700 level has proven the continuation of the main mining horizon with all mineralization unbounded and open at depth.

The table below summarizes the drilling highlights for 5 of 19 exploration drill holes outlining the new mineralization in the Ming North Zone.

 

Table 1 - Diamond Drill Hole Down-hole Composited Assay Results using a >1.0% cut-off as a hard boundary, including

(See Note 1 and Appendix I below for further details)

 

Drill Hole

ZONE

From(m)

To(m)

Length(m)

Copper(%)

Gold(g/t)

Silver(g/t)

R18-722-01

MNZ

102.00

121.00

19.00

4.10

2.75

19.12

R18-722-02

MNZ

56.00

63.30

7.30

2.82

0.73

6.12

R18-722-02

MNZ

112.30

119.70

7.40

1.80

2.98

4.43

R18-722-07

MNZ

82.00

88.23

6.23

1.22

1.35

12.84

R18-722-12

MNZ

126.00

151.48

25.48

9.43

5.10

40.26

R18-722-15

MNZ

148.65

165.63

16.98

3.07

2.32

17.59

 

 

Figure 1 - Plan and Section View of the Ming North Zone Underground Diamond Drilling Program

 

http://www.rns-pdf.londonstockexchange.com/rns/4330C_1-2018-9-30.pdf

 

Note 1

 

Results reported are accurate and reflective as of the date of release. The Company performs regular auditing and reconciliation reviews on its processes following which past results may be adjusted to reflect any changes. Core lengths can vary depending on the angle the drill hole intersects the mineralized body. True widths are estimate to range between 50-75% of core lengths.

 

Tim Sanford, P.Eng., is the Qualified Person responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Sanford is an employee of Rambler Metals and Mining Canada Limited. Tonnes referenced are dry metric tonnes unless otherwise indicated.

 

Rambler maintains an ongoing quality assurance and quality control program ('QA/QC') to ensure that exploration data collected adheres to all compliance regulations and CIM best practices. Rambler maintains written field procedures and has had independent audit and verification of its geological database and all data related to drilling, surveying, sampling and assaying.

 

Rambler's QA/QC program includes insertion of blanks, duplicates and standard samples at regular intervals. Analytical control measures for the drilling program involve both internal and external laboratory check samples to ensure that data received and used are accurate and reliable. Rambler has integrated the database management program MX Deposit as an effective and efficient way to manage assay data as well as QA/QC tracking and reporting.

 

All core samples assayed and pertaining to this report were completed by Eastern Analytical Limited located at Springdale, Newfoundland. Eastern Analytical Limited is an ISO 17025 accredited laboratory and bears no relationship to Rambler.

 

Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

ABOUT RAMBLER METALS AND MINING

Rambler is a mining and development company that in November 2012 brought its first mine into commercial production. Rambler has a 100 per cent ownership in the Ming Copper-Gold Mine, a fully operational base and precious metals processing facility and year round bulk storage and shipping facility; all located on the Baie Verte peninsula, Newfoundland and Labrador, Canada.

Following the completion of its Phase II expansion Rambler's focus is to sustain mine and mill production at 1,250 mtpd in 2018. Upon sustaining its Phase II production target, Rambler will continue advancing Phase III engineering studies with a view to further increase production to 2,000 mtpd at the Ming Mine.

Along with the Ming Mine, Rambler also owns 100 per cent of the former producing Little Deer/ Whales Back copper mines and has strategic investment in the former producing Hammerdown gold mine.

Rambler is dual listed in London under AIM:RMM and in Canada under TSX-V:RAB.

For further information, please contact:

 

Norman Williams, CPA,CA

President and CEO

Rambler Metals & Mining Plc

Tel No: 709-800-1929

Fax No: 709-800-1921

Peter Mercer

Vice President, Corporate Secretary

Rambler Metals & Mining Plc

Tel No: +44 (0) 20 8652-2700

Fax No: +44 (0) 20 8652-2719

 

Nominated Advisor (NOMAD)

 

Investor Relations

David Porter, Peter Malovany

Cantor Fitzgerald Europe

Tel No: +44 (0) 20 7894 7000

Nicole Marchand Investor Relations

Tel No: 416- 428-3533

Nicole@nm-ir.com

 

Website: www.ramblermines.com 

Caution Regarding Forward Looking Statements:

Certain information included in this press release, including information relating to future financial or operating performance and other statements that express the expectations of management or estimates of future performance constitute "forward-looking statements". Such forward-looking statements include, without limitation, statements regarding copper, gold and silver forecasts, the financial strength of the Company, estimates regarding timing of future development and production and statements concerning possible expansion opportunities for the Company. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief are based on assumptions made in good faith and believed to have a reasonable basis. Such assumptions include, without limitation, the price of and anticipated costs of recovery of, copper concentrate, gold and silver, the presence of and continuity of such minerals at modeled grades and values, the capacities of various machinery and equipment, the availability of personnel, machinery and equipment at estimated prices, mineral recovery rates, and others. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, interpretation and implications of drilling and geophysical results; estimates regarding timing of future capital expenditures and costs towards profitable commercial operations. Other factors that could cause actual results, developments or events to differ materially from those anticipated include, among others, increases/decreases in production; volatility in metals prices and demand; currency fluctuations; cash operating margins; cash operating cost per pound sold; costs per ton of ore; variances in ore grade or recovery rates from those assumed in mining plans; reserves and/or resources; the ability to successfully integrate acquired assets; operational risks inherent in mining or development activities and legislative factors relating to prices, taxes, royalties, land use, title and permits, importing and exporting of minerals and environmental protection. Accordingly, undue reliance should not be placed on forward-looking statements and the forward-looking statements contained in this press release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements contained herein are made as at the date hereof and the Company does not undertake any obligation to update publicly or revise any such forward-looking statements or any forward-looking statements contained in any other documents whether as a result of new information, future events or otherwise, except as required under applicable security law.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLURARRWWAKOUR
Date   Source Headline
25th Jan 20177:00 amRNSProduction Results and 2017 Guidance
19th Jan 20177:00 amRNSCompletion of DMS Trial Testing
19th Dec 20167:44 amRNSFinancial Results for Period Ending 31 Oct 2016
1st Dec 20163:18 pmRNSResult of AGM
1st Dec 20167:00 amRNSQ1/2017 Stub - Production Results
8th Nov 20169:07 amRNSHolding(s) in Company
7th Nov 20167:43 amRNSNotice of AGM
7th Nov 20167:00 amRNSReceives a Repayable Contribution From the ACOA
24th Oct 20167:00 amRNSFinal Results
17th Oct 20164:47 pmRNSHolding(s) in Company
21st Sep 20167:00 amRNSFiscal 2016 Q4 and Yearend Production Results
22nd Aug 20167:00 amRNSDirector/PDMR Shareholding
18th Aug 201611:17 amRNSNew Stock Option Plan
17th Aug 20167:00 amRNSHolding(s) in Company
27th Jul 20167:00 amRNSDirector/PDMR Shareholding - Correction
26th Jul 20166:28 pmRNSDirector/PDMR Shareholding
20th Jul 20167:00 amRNSChange of Accounting Reference Date
19th Jul 201612:57 pmRNSDirector/PDMR Shareholding
29th Jun 20167:00 amRNSUNAUDITED CONSOLIDATED FINANCIAL INFORMATION
10th Jun 20162:45 pmRNSNotification: Major Interest in Shares- Correction
9th Jun 201611:36 amRNSNotification of Major Interest in Shares
7th Jun 201611:15 amRNSNotification of Major Interests in Shares
3rd Jun 20165:36 pmRNSHoldings in Company
3rd Jun 20168:00 amRNSTransaction Close
27th May 20163:47 pmRNSResult of General Meeting
25th May 20167:00 amRNSThird Quarter FY2016 Production Results
20th May 20163:58 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
16th May 201612:00 pmRNSRambler and Maritime Engage WSP Canada
10th May 20167:00 amRNS13th Shipment of Copper Concentrate Completed
9th May 201612:00 pmRNSRambler & Maritime Sign Engineering Agreement
4th May 20167:00 amRNSMing Mine Project Receives Safety Award
21st Apr 20167:09 amRNSProposed Subscription by CEII Roma
30th Mar 20167:00 amRNSSecond Quarter Unaudited Financial Results
15th Mar 20161:00 pmRNSRambler Signs Non-Binding Letter of Intent
29th Feb 20167:00 amRNSSecond Quarter FY2016 Production Results
2nd Feb 201612:29 pmRNSIssuance of Share
2nd Feb 20167:00 amRNS12th Shipment of High Grade Copper Concentrate
13th Jan 20165:19 pmRNSAcquisition of Thundermin Resources Inc.
22nd Dec 20153:54 pmRNSThundermin Resources Shareholders Approve Merger
14th Dec 20157:00 amRNSFinancial Results For the Quarter Ended October 31
3rd Dec 20152:57 pmRNSResults of Annual General Meeting
2nd Dec 20157:00 amRNSFirst Quarter 2016 Production Results
30th Nov 20154:37 pmRNSNotification of Major Interest in Shares
12th Nov 20152:10 pmRNSRambler & Thundermin Sign Amalgamation Agreement
26th Oct 20157:00 amRNSFinancial Results for year ended July 31, 2015
9th Sep 20152:08 pmRNSFiling of Prefeasibility Technical Report on SEDAR
8th Sep 20157:00 amRNSFiscal 2015 Q4 and Yearend Production Results
3rd Sep 20157:00 amRNSRambler and Thundermin Enter Into a LOI
2nd Sep 20152:15 pmRNSPurchase Agreement with Off-take Partner
19th Aug 20157:00 amRNS11th Shipment of High Grade Copper Concentrate

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.