Gordon Stein, CFO of CleanTech Lithium, explains why CTL acquired the 23 Laguna Verde licenses. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRMM.L Regulatory News (RMM)

  • There is currently no data for RMM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Fiscal 2016 Q4 and Yearend Production Results

21 Sep 2016 07:00

RNS Number : 3693K
Rambler Metals & Mining PLC
21 September 2016
 

21 September 2016

 

Rambler Reports Fiscal 2016 Q4 and Yearend Production Results

12% Increase in Production over Fiscal 2015

 

London, England & Baie Verte, Newfoundland and Labrador, Canada - Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ('Rambler' or the 'Company'), a copper and gold producer operating in Newfoundland and Labrador, Canada, today provides an operational update for its Fiscal 2016 Yearend and fourth quarter ending 31 July 2016 ('F2016' and 'Q4/16').

PRODUCTION

Yearend F2016

F2016

Guidance

Dry Tonnes Milled

241,080

235,000 - 250,000

Copper Recovery (%)

95.6

94 - 96

Gold Recovery (%)

68.7

65 - 70

Silver Recovery (%)

71.8

65 - 75

Copper Head Grade (%)

2.12

2.0 - 2.5

Gold Head Grade (g/t)

1.40

1.0 - 2.0

Silver Head Grade (g/t)

9.97

6.0 - 10.0

 

CONCENTRATE

(Delivered to Warehouse)

Copper (%)

26.9

27 - 29

Gold (g/t)

13.8

6 - 8

Silver (g/t)

98.1

55 - 75

Dry Tonnes Produced

17,048

17,000 - 21,000

Copper Metal (tonnes)

4,580

4,500 - 6,000

Gold (ounces)

7,549

5,500 - 6,500

Silver (ounces)

53,830

42,000 - 57,000

 

Highlights OF YEAREND

· Rambler met or exceeded its 2016 fiscal year production guidance. Targets were achieved for tonnes milled, metal recovery and grades. Gold ounces exceeded guidance by 16 per cent, a record for gold in concentrate production, resulting from adjustments made to the flotation circuit in the first half of the year. During the second half of the year more focus was placed on increasing mill throughput. Once throughput is fully optimized the team will work towards re-establishing the higher gold recoveries.

 

· Copper grades of 2.12 per cent and gold grades of 1.40 grammes per tonne were in line with guidance. Total mill throughput for the year was 241,080 dry metric tonnes, a 12% increase over the 216,000 tonnes milled in fiscal 2015.

· Average recoveries to concentrate for the year were: copper 95.6 per cent, gold 68.7 per cent and silver 71.8 per cent with a concentrate grade of 26.9 per cent, 13.8 grammes per tonne and 98.1 grammes per tonne for copper, gold and silver respectively.

Highlights FOR THE QUARTER

· Production of 4,108 tonnes of copper concentrate, representing a 9 per cent decrease over Q3/16 resulting from lower copper head grade in the quarter.

· Dry tonnes milled of 69,874 tonnes, representing a 23 per cent increase over Q3/16 and 18 per cent over the same quarter last year driven by an increase in Lower Footwall Zone ('LFZ') ore availability;

o 1,126 tonnes of copper (4,580 tonnes for the fiscal year)

o 1,637 ounces of gold (7,549 ounces for the fiscal year)

o 11,899 ounces of silver (53,830 ounces for the fiscal year)

· Head grades of copper averaged 1.83 per cent for the quarter and 2.12 per cent for the year; gold at 1.16 grammes per tonne for the quarter and 1.40 grammes per tonne for the year; silver at 7.97 grammes per tonne for the quarter and 9.97 grammes per tonne for the year.

Norman Williams, President and CEO, commented:

"As anticipated, Fiscal 2016 was a transitional year as we began development plans to expand production with the Lower Footwall Zone "LFZ". A focused move towards LFZ development was initiated during the year once project financing was secured. This is evident through the significant increase in production tonnes during the final quarter of the fiscal year.

"Our fiscal yearend goal was to reach steady state production at 850 mtpd. With this goal achieved we will look forward to continuing to increase production levels throughout fiscal 2017.

"I would like to thank the entire operations team for their outstanding efforts, tremendous dedication and continued focus on safety throughout the year."

 

Details of the Company's financial performance, including capital expenditure and operating costs, will be included in its Yearend financial results to be released on or before 24 October 2016. Following the recently announced change to a calendar year end, the group will communicate calendar 2017 production guidance with its yearend financial results.

 

Table 1 - 2016 Production Guidance with Actual Ore and Concentrate Production for Fiscal 2016

(see Note 1 below) 

PRODUCTION

Q1

2016

Q2

2016

Q3

2016

Q4

2016

Yearend

F2016

F2016

Guidance

Dry Tonnes Milled

58,053

56,458

56,695

69,874

241,080

235,000 - 250,000

Copper Recovery (%)

95.3

96.4

96.3

94.7

95.6

94 - 96

Gold Recovery (%)

70.6

75.3

67.9

62.6

68.7

65 - 70

Silver Recovery (%)

76.4

75.4

70.7

65.8

71.8

60 - 75

Copper Head Grade (%)

2.42

2.07

2.22

1.83

2.12

2.0 - 2.5

Gold Head Grade (g/t)

1.45

1.40

1.62

1.16

1.40

1.0 - 2.0

Silver Head Grade (g/t)

11.77

10.20

10.34

7.97

9.97

6.0 - 8.0

CONCENTRATE

(Delivered to Warehouse)

Copper (%)

26.57

26.49

26.98

27.41

26.89

27 - 29

Gold (g/t)

12.90

16.35

13.98

12.39

13.82

6.0 - 8.0

Silver (g/t)

101.75

110.28

92.05

90.10

98.09

55 - 75

Dry Tonnes Produced

4,788

3,621

4,530

4,108

17,048

17,000 - 21,000

Copper Metal (tonnes)

1,272

960

1,222

1,126

4,580

4,500 - 6,000

Gold (ounces)

1,986

1,889

2,037

1,637

7,549

5,500 - 6,500

Silver (ounces)

15,664

12,860

13,407

11,899

53,830

42,000 - 57,000

 

Table 2 - Quarter over Quarter Results Comparison (see Note 1 below)

PRODUCTION

Q4/15

(May, Jun, Jul)

Q4/16

(May, Jun, Jul)

Q3/16

(Feb, Mar, Apr)

Q4/16

(May, Jun, Jul)

Dry Tonnes Milled

59,373

69,874

18%

56,695

69,874

23%

Copper Recovery (%)

96.6

94.7

-2%

96.3

94.7

-2%

Gold Recovery (%)

68.7

62.6

-9%

67.9

62.6

-8%

Silver Recovery (%)

72.8

65.8

-10%

70.7

65.8

-7%

Copper Head Grade (%)

1.93

1.83

-5%

2.22

1.83

-17%

Gold Head Grade (g/t)

1.22

1.16

-5%

1.62

1.16

-28%

Silver Head Grade (g/t)

8.75

7.97

-9%

10.34

7.97

-23%

 

CONCENTRATE

(Produced and Stored in Warehouse)

Copper (%)

26.66

27.41

3%

26.98

27.41

2%

Gold (g/t)

12.92

12.39

-4%

13.98

12.39

-11%

Silver (g/t)

92.80

90.10

-3%

92.05

90.10

-2%

Dry Tonnes Produced

3,600

4,108

14%

4,530

4,108

-9%

Copper Metal (tonnes)

960

1,126

17%

1,222

1,126

-8%

Gold (ounces)

1,495

1,637

9%

2,037

1,637

-20%

Silver (ounces)

10,742

11,899

11%

13,407

11,899

-11%

 

 

ABOUT RAMBLER METALS AND MINING

 

Rambler is a mining and development company that in November 2012 brought its first mine into commercial production. Rambler has a 100 per cent ownership in the Ming Copper-Gold Mine, a fully operational base and precious metals processing facility and year round bulk storage and shipping facility; all located on the Baie Verte peninsula, Newfoundland and Labrador, Canada.

Rambler's immediate plans are to increase mine and mill production to 1,250 mtpd by the end of Fiscal 2017. This initial expansion has been fully funded through CEII's investment. Rambler will also continue advancing engineering studies on ore pre-concentration (DMS) and shaft rehabilitation with a view to further increase production to 2,000 mtpd at the Ming Mine. In addition, Rambler has initiated a detailed study at the mill with a goal to increase gold recovery and production rate in the copper concentrator.

Along with the Ming Mine, Rambler also owns 100 per cent of the former producing Little Deer/ Whales Back copper mines and has strategic investment in the former producing Hammerdown gold mine.

 

Rambler is dual listed in London under AIM:RMM and in Canada under TSX-V:RAB.

For further information, please contact:

 

Norman Williams, CPA,CA

President and CEO

Rambler Metals & Mining Plc

Tel No: 709-800-1929

Fax No: 709-800-1921

Peter Mercer

Vice President, Corporate Secretary

Rambler Metals & Mining Plc

Tel No: +44 (0) 20 8652-2700

Fax No: +44 (0) 20 8652-2719

 

Nominated Advisor (NOMAD)

 

Investor Relations

David Porter

Cantor Fitzgerald Europe

Tel No: +44 (0) 20 7894 7000

Nicole Marchand Investor Relations

Tel No: 416- 428-3533

Nicole@nm-ir.com

 

Website: www.ramblermines.com 

 

Larry Pilgrim, P.Geo., is the Qualified Person responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by Rambler Metals and Mining Canada Limited. Tonnes referenced are dry metric tonnes unless otherwise indicated.

Note 1: Results reported are accurate and reflective as of the date of release. The Company performs regular auditing and reconciliation reviews on its mining and milling processes as well as stockpile inventories, following which past results may be adjusted to reflect any changes.

 

Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

 

 

 

Caution Regarding Forward Looking Statements:

Certain information included in this press release, including information relating to future financial or operating performance and other statements that express the expectations of management or estimates of future performance constitute "forward-looking statements". Such forward-looking statements include, without limitation, statements regarding copper, gold and silver forecasts, the financial strength of the Company, estimates regarding timing of future development and production and statements concerning possible expansion opportunities for the Company. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief are based on assumptions made in good faith and believed to have a reasonable basis. Such assumptions include, without limitation, the price of and anticipated costs of recovery of, copper concentrate, gold and silver, the presence of and continuity of such minerals at modeled grades and values, the capacities of various machinery and equipment, the availability of personnel, machinery and equipment at estimated prices, mineral recovery rates, and others. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, interpretation and implications of drilling and geophysical results; estimates regarding timing of future capital expenditures and costs towards profitable commercial operations. Other factors that could cause actual results, developments or events to differ materially from those anticipated include, among others, increases/decreases in production; volatility in metals prices and demand; currency fluctuations; cash operating margins; cash operating cost per pound sold; costs per ton of ore; variances in ore grade or recovery rates from those assumed in mining plans; reserves and/or resources; the ability to successfully integrate acquired assets; operational risks inherent in mining or development activities and legislative factors relating to prices, taxes, royalties, land use, title and permits, importing and exporting of minerals and environmental protection. Accordingly, undue reliance should not be placed on forward-looking statements and the forward-looking statements contained in this press release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements contained herein are made as at the date hereof and the Company does not undertake any obligation to update publicly or revise any such forward-looking statements or any forward-looking statements contained in any other documents whether as a result of new information, future events or otherwise, except as required under applicable security law.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEBLFLQKFZBBQ
Date   Source Headline
27th Apr 20237:00 amRNSBlock Listing Six Monthly Return
21st Apr 20237:00 amRNSUpdate – Creditors Voluntary Liquidation
17th Apr 20237:00 amRNSSale and Investment Solicitation Process
12th Apr 20231:53 pmRNSCompany Website Update
11th Apr 20235:45 pmRNSRambler Metals & Mining
11th Apr 20237:00 amRNSCreditors Voluntary Arrangement and Cancellation
6th Apr 20234:27 pmRNSMaterials publicly filed in the CCAA Proceedings
4th Apr 20232:42 pmRNSCompany Website
30th Mar 20238:33 amRNSOperational Update
24th Mar 20232:33 pmRNSGrant and Vesting of Restricted Share Units
17th Mar 20231:54 pmRNSMaterials publicly filed in the CCAA Proceedings
16th Mar 20233:58 pmRNSCCAA Proceedings
14th Mar 20239:12 amRNSMaterials publicly filed in the CCAA Proceedings
8th Mar 20237:00 amRNSMaterials publicly filed in the CCAA Proceedings
7th Mar 20237:00 amRNSCorrection: Materials publicly filed
6th Mar 20236:15 pmRNSMaterials publicly filed in the CCAA Proceedings
28th Feb 20236:15 pmRNSMaterials publicly filed in the CCAA Proceedings
28th Feb 20237:00 amRNSRambler Announces Strategic Process
27th Feb 20237:00 amRNSApplication for Initial Order for CCAA Protection
20th Feb 20237:00 amRNSUpdate on Gold Stream Repurchase Agreement
17th Feb 20237:00 amRNSUpdate on Financing and Operations
10th Feb 20237:00 amRNSUpdate on Gold Streaming Agreement
18th Jan 20237:00 amRNSQ4 2022 Operational Results
5th Dec 20223:49 pmRNSForward Sale on Copper Production
15th Nov 20227:00 amRNSForward Sale on Copper Production
10th Nov 20229:28 amRNSRambler Provides an Operational Update
1st Nov 20227:00 amRNSRambler Provides an Update on Financial Position
27th Oct 20227:30 amRNSSuspension - Rambler Metals & Mining PLC
27th Oct 20227:01 amRNSBlock Listing Six Monthly Return
27th Oct 20227:00 amRNSRambler Provides an Update on Financial Position
21st Oct 20227:00 amRNSQ3 2022 Operational Results
3rd Oct 20229:05 amRNSSecond Price Monitoring Extn
3rd Oct 20229:00 amRNSPrice Monitoring Extension
30th Sep 20222:06 pmRNSSecond Price Monitoring Extn
30th Sep 20222:00 pmRNSPrice Monitoring Extension
28th Sep 20224:41 pmRNSSecond Price Monitoring Extn
28th Sep 20224:35 pmRNSPrice Monitoring Extension
27th Sep 20224:40 pmRNSSecond Price Monitoring Extn
27th Sep 20224:35 pmRNSPrice Monitoring Extension
27th Sep 20222:00 pmRNSPrice Monitoring Extension
26th Sep 20224:32 pmRNSFinancial Results Half Year Ended 30 June 2022
15th Sep 20222:05 pmRNSSecond Price Monitoring Extn
15th Sep 20222:00 pmRNSPrice Monitoring Extension
13th Sep 20224:41 pmRNSSecond Price Monitoring Extn
13th Sep 20224:35 pmRNSPrice Monitoring Extension
9th Sep 20224:40 pmRNSSecond Price Monitoring Extn
9th Sep 20224:35 pmRNSPrice Monitoring Extension
9th Sep 202212:19 pmRNSRambler Provides a Corporate Update
1st Sep 20227:00 amRNSSignificance of Stope In-fill Drilling Program
23rd Aug 20227:00 amRNSRambler Updates 2022 Diamond Drilling Program

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.