Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksProspex Eng Regulatory News (PXEN)

Share Price Information for Prospex Eng (PXEN)

Share Price is delayed by 15 minutes
Get Live Data
3.15    0.00 (0.00%)
Bid:
3.10
Ask:
3.20
Spread: 0.10 (3.226%)
Market Cap: £13.66m
PXEN Live PriceLast checked at - London Stock Exchange

Intraday Prospex Eng Share Chart

Spain: Project Helios Update

3 May 2023 07:00

RNS Number : 1842Y
Prospex Energy PLC
03 May 2023
 

Prospex Energy PLC / Index: AIM / Epic: PXEN / Sector: Oil and Gas

 

3 May 2023

 

Prospex Energy PLC

('Prospex' or the 'Company')

 

Spain: Project Helios Update - Photovoltaic Hybridisation Project

to Increase Electricity Production by 60 percent

 

Prospex Energy PLC (AIM: PXEN), the AIM quoted investment company focused on European gas and power projects, is pleased to announce that the development of the photovoltaic hybridisation solar project at the El Romeral power plant, known as "Project Helios", which would increase output from the plant by up to 60%, is progressing well ahead of the final investment decision, which is scheduled for consideration in June 2023. 

 

 

Highlights

· 20 hectares adjacent to the El Romeral power plant has been leased for 25 years

· The project to install an array of solar panels with a maximum power output of 5MW peak, is out to tender with five companies based in Spain with tenders expected to complete in early May 2023

· Final Investment Decision ("FID") for the project is scheduled for consideration in June 2023

· Permitting, procurement and installation expected to take less than 12 months

· Existing grid connection has 8.2MW output allocated to El Romeral which is currently utilising just 2.7 MW

· Further grid capacity is available to accept increased output with the existing infrastructure

 

 

The El Romeral power plant is operated by Tarba Energía S.L. ("Tarba"), which is based near Carmona east of Seville in the province of Andalusia, Spain. The power plant is co-owned through Tarba by Prospex which has a 49.9% working interest and Warrego Energy Limited which has a 50.1% working interest. Warrego Energy is now wholly owned by Hancock Energy (PB) Pty Ltd. in Perth Western Australia. Hancock Energy is an active and supportive joint venture owner in Tarba.

 

The plot of 20 hectares adjacent to the power plant has been leased for an initial period of 2 years with a start date of 1 January 2023. The first two years are at the reduced rate of €800 per hectare per year with a break clause should full permitting or FID not proceed in that timeframe. Thereafter once the project has received full authorisations the lease rate for the next 25 years is at €2,000 per hectare per year adjusted for CPI annually. There is the option to extend the lease in increments of 10 years after this date.

 

The El Romeral power plant produces electricity from natural gas produced from the three contiguous El Romeral production concessions in the region which are wholly owned by Tarba. By developing Project Helios for the production of electricity through photovoltaic solar energy, electricity production through renewable energy would increase output from the plant by up to 60%.

 

The new project is a pioneer in the hybridisation of technologies, using the resources and income from electricity generation from conventional natural gas production to re-invest in renewable energy generation from a photovoltaic plant. The hybridisation will use the existing connection to the electricity grid and is expected to provide sufficient energy to supply more than 20,000 homes.

 

The El Romeral power plant was recently declared a public utility by resolution of the Junta de Andalucía. This declaration comes with no further liabilities and is testament to the good relations that Tarba has built up with the local authorities and the community of Carmona. This recognition has been welcomed by Tarba and consolidates Tarba's long-term commitment to the population of Carmona as a stable supplier of electricity to the region.

 

Mark Routh, Prospex's CEO, commented:

"The existing connection to the national grid network operated by Red Eléctrica de España at El Romeral is a significant asset. Project Helios will allow Tarba to increase its capacity for power export in the near term alongside the capacity increase expected from drilling new gas wells on the existing El Romeral production concessions. A revision to the application to drill new wells on the concessions was submitted in March 2023 and is now proceeding through the Environmental Impact Assessment process as required by the regulatory authorities.

 

"The investment in photovoltaic solar technology at Project Helios is due to increase output at the plant by 60%, this alongside Tarba's natural gas power plant marks an important step not only in the security of energy supply, but also in the ecological transition process. It is now widely acknowledged that natural gas has a crucial role to play in both of these very current issues."

 

* * ENDS * *

 

 

For further information visit www.prospex.energy or contact the following:

 

Mark Routh

Prospex Energy PLC

Tel: +44 (0) 20 7236 1177

Ritchie BalmerRory Murphy

Strand Hanson Limited

Tel: +44 (0) 20 7409 3494

Andrew Monk (Corporate Broking)Andrew Raca/Alex Cabral (Corporate Finance)

VSA Capital Limited

Tel: +44 (0) 20 3005 5000

Colin RowburyJon Belliss

Novum Securities Limited

Tel: +44 (0) 20 7399 9427

Susie GeliherAna Ribeiro

St Brides Partners Limited

 

Tel: +44 (0) 20 7236 1177

 

Notes

Prospex Energy PLC is an AIM quoted investment company focussed on high impact onshore and shallow offshore European opportunities with short timelines to production. The Company's strategy is to acquire undervalued projects with multiple, tangible value trigger points that can be realised within 12 months of acquisition and then applying low-cost re-evaluation techniques to identify and de-risk prospects.  The Company will rapidly scale up gas production in the short term to generate internal revenues that can then be deployed to develop the asset base and increase production further.

 

About El Romeral and Tarba

The El Romeral gas and power project in Spain, with gas production wells supplying gas to an 8.1MW power plant near Carmona in Southern Spain is owned and operated by Tarba. It is currently operating at about 30% of its full capacity because Tarba is waiting on permits to drill further infill wells on the concessions to increase production. Tarba is already categorised as a hybrid energy provider with the successful installation of photovoltaic panels on the roof of the plant in August 2022. Prospex owns a 49.9% working interest in the El Romeral project via Tarba. The remaining 50.1% working interest is owned by Warrego Energy Limited. Tarba sells electricity generated from the plant on the spot market in Spain. The El Romeral licences comprise three contiguous production concessions.

 

The El Romeral Power Plant at Carmona near Seville, Andalucía.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCFZGGKNZNGFZM
Date   Source Headline
20th Jun 20257:00 amRNSAGM Proceedings
9th Jun 20257:00 amRNSViura Field - Planned Reinstatement of Production
30th May 20257:00 amRNSChange of Registered Office
27th May 20257:00 amRNSFinal Results
2nd May 20257:00 amRNSQ1 2025 Activity Report
29th Apr 20254:42 pmRNSViura Field Update
29th Apr 20257:00 amRNSViura Field Update
22nd Apr 20257:00 amRNS-RInvestor Meeting
16th Apr 20257:00 amRNSCompletion of Acquisition of 100% of Tarba
8th Apr 20257:00 amRNSOperational Update & Appointment of Joint Broker
20th Mar 20257:00 amRNSProposed Acquisition of 100% of Tarba Energía
25th Feb 20257:00 amRNSOperational Update
20th Feb 20257:00 amRNSPublic Gazetting of Statutory EIA Consultation
13th Feb 20257:00 amRNS-RParticipation at the Investor Meet Company Event
4th Feb 20257:00 amRNSSpanish Ministry Initiates EIA Consultation
31st Jan 20257:00 amRNSItaly: Selva Malvezzi Production Concession
28th Jan 20257:00 amRNSApproval of 3D Seismic Campaign
16th Dec 20247:00 amRNSViura-1B Well Flow Rates Exceed Expectations
27th Nov 20247:00 amRNSRevenues from Viura-1B are Expected in December
31st Oct 20247:00 amRNSItaly: Selva Malvezzi Production Concession
25th Oct 20247:00 amRNSProduction Resumes at The Viura Gas Field
16th Oct 202411:14 amRNSDirector/PDMR Shareholding
4th Oct 20247:00 amRNSProspex to Expand into Third European Country
3rd Oct 20247:00 amRNSDirector/PDMR Shareholding
2nd Oct 20247:00 amRNSViura-1B Well Successfully Reaches Reservoir
19th Sep 20247:00 amRNSHalf-year Report
27th Aug 20247:00 amRNSCompletion of Viura Gas Field Acquisition
8th Aug 20247:00 amRNSResult of Oversubscribed WRAP Retail Offer
7th Aug 202412:13 pmRNSWRAP Retail Offer Still Open
6th Aug 20244:30 pmRNSResult of Placing and Subscription
5th Aug 20246:10 pmRNSREPLACEMENT: WRAP Retail Offer for up to £500,000
5th Aug 20245:30 pmRNSWRAP Retail Offer for up to £500,000
5th Aug 20245:25 pmRNSProposed Placing and Subscription and Retail Offer
25th Jul 20247:02 amRNS10-year Licence Extension Granted on El Romeral
19th Jun 20247:00 amRNSAnnulment of Italy’s Plan of Areas Update
12th Jun 20241:08 pmRNSResult of AGM
31st May 20247:00 amRNSItaly: Selva Malvezzi Production Concession Report
16th May 20247:00 amRNSInvestor Presentation
14th May 20247:00 amRNSFinal Results
3rd May 20247:00 amRNSItaly: Selva Malvezzi Q1 2024 Activity Report
15th Apr 20247:00 amRNSUpdated Corporate Presentation
27th Mar 20247:00 amRNSFinal Settlement of Convertible Loan Note Debts
16th Feb 20249:02 amRNSHolding(s) in Company
31st Jan 202412:30 pmRNSItaly: Selva Field Development
19th Jan 20247:00 amRNSItaly: Selva Field Development
22nd Dec 20237:00 amRNSConversion of Loan Notes and TVR
18th Dec 20237:00 amRNSYear End Review and Business Development Update
1st Nov 20237:00 amRNSItaly: Selva Field Development - Q3 2023 Update
27th Sep 20237:00 amRNSConversion of Loan Notes and TVR
26th Sep 20237:00 amRNSConversion of Loan Note Debt and TVR

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.