The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPrimorus Inv. Regulatory News (PRIM)

Share Price Information for Primorus Inv. (PRIM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.15
Bid: 3.80
Ask: 4.50
Change: 0.00 (0.00%)
Spread: 0.70 (18.421%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 4.15
PRIM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill Update

18 Jul 2018 14:00

RNS Number : 0568V
Primorus Investments PLC
18 July 2018
 

Primorus Investments plc

("Primorus" or the "Company")

 

Portland Extended Flow Test ("EWT"): Well Clean-Up Phase Complete, Dry Oil Flows to Surface,

Horse Hill-1 Oil Discovery, PEDL137, Weald Basin, UK

 

Highlights:

 

· Initial Portland well "clean-up" phase completed successfully

· Light sweet crude oil (36 API) and associated solution gas flowed sustainably via pump and natural flow to surface over a 4-day period to date. Oil contains no metered water content (i.e. "dry oil")

· Metered daily oil rates to date equal to or exceed 2016 values. Highest observed hourly rate equivalent to an implied daily rate of 352 barrels of oil per day ("bopd"). Corresponding metered solution gas volumes are up to an implied rate of 30,000 cu ft per day.

· Flow has not yet been optimised for maximum sustainable flow rates

· First tanker containing 214 barrels of dry oil exported to BP's Hamble oil terminal

· Initial analysis indicates well productivity unaffected by 2 year shut-in period since 2016

· Following a planned 24-hour shut in (i.e. pressure build-up test) the first of three planned Portland test sequences will commence

 

Primorus (London AIM: PRIM) is pleased to announce that it has been informed by its investee company, Horse Hill Developments Ltd ("HHDL"), the operator of the Horse Hill-1 ("HH-1") Kimmeridge and Portland oil discovery that the initial well "clean-up" phase of the Portland extended well test ("EWT") programme has been completed according to plan. Over the past four days, the well has delivered a sustained dry oil and solution gas flow to surface via pump and natural flow.

 

The Company holds a 3.25% beneficial interest in licence PEDL137 containing the HH-1 oil discovery.

 

Observed metered Portland flow rates to date are broadly equivalent to, or exceed, those recorded during the short duration 2016 test. The highest recorded hourly metered rate to date, equates to an implied daily rate of 352 bopd and was achieved using a 20/64" choke, a notably more restricted setting than the 64/64" choke used in 2016. Corresponding solution gas flows have been measured up to an implied rate of 30,000 cubic feet per day. Note that, to date, flow has not yet been optimised for maximum sustainable production rates, this will follow in the subsequent test sequences.

 

Several periods of sustained natural flow (i.e. flow to surface without pumping) have also been observed over the past few days, with the most productive period producing an implied daily dry oil rate of 228 bopd over a two-hour period.

 

Initial reservoir parameter analysis indicates that the Portland is performing very well compared to the productivity measured in 2016 prior to temporarily shutting in and suspending the well.

 

To date a total of 463 barrels of light sweet 36 API crude have been recovered to surface during the clean-up period, together with all 141 barrels of completion and kill fluids (i.e. saline water) used to suspend the well after the 2016 well test.

 

Forward EWT Plans

 

The well will now be shut in for a planned 24-hour pressure build-up test. Operations will then include further flow parameter optimisation, followed by the first of three planned flow sequences designed to assess whether the Portland oil pool contains a commercially viable volume of oil. The first test sequence will likely include an optimised maximum rate test, prior to choking back the well to provide the steady state flow conditions necessary to determine the Portland oil pool's connected oil volume. Note that in order to collect the required data during these steady state flow periods, rates will likely be below any future optimised production rates.

 

Testing of each of the Kimmeridge Limestone 4 ("KL4") and KL3 oil pools will follow completion of the Portland test sequence.

 

Alastair Clayton, Executive Director of Primorus, commented: "with the clean-up phase now complete, the operator can now get on with the business of determining the actual flow parameters. We are, at this very early stage, also pleased to note the strong oil and gas flows to surface at the well in advance of the shut-in and commencement of the flow testing programme itself."

 

 

Extended Well Test ("EWT") Overview

As the 2016 short flow test campaign established commercially viable initial flow rates for each of the Portland, KL4 and KL3 zones, the 2018 EWT's prime goal is to confirm that the wellbore is connected to a commercially viable oil volume within one or more of the three zones.

 

The long-term reservoir performance data is also expected to provide the necessary data to enable, for the first time, Petroleum Resources Management System compliant Kimmeridge and Portland reserve figures to be estimated at Horse Hill.

 

Each test sequence will include a short, optimised rate test, together with a sequence of "choked back" (i.e. reduced) steady-state flow periods necessary to obtain the data required to determine the connected oil volume within each zone. A series of associated long pressure build up tests are also planned. Oil produced from the EWT will be sold on the "spot" oil market and any revenues will be utilised to offset overall testing costs.

 

Qualified Person's Statement

 

Stephen Sanderson, Executive Chairman and Chief Executive of UK Oil & Gas Investments plc, who has over 35 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

 

The directors of Primorus accept responsibility for this announcement.

 

For further information, please contact:

 

Primorus Investments plc:

+44 (0) 20 7440 0640

Alastair Clayton

Nominated Adviser:

+44 (0) 20 7213 0880

Cairn Financial Advisers LLP

James Caithie / Sandy Jamieson

Broker:

+44 (0) 20 3621 4120

Turner Pope Investments Limited

Andy Thacker

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCFMGMNZRZGRZM
Date   Source Headline
1st May 20147:00 amRNSGold Mines of Wales - Update
4th Mar 20147:00 amRNSWork commences on Horse Hill-1 well
25th Feb 20147:00 amRNSGold Mines of Wales Update
6th Feb 20147:00 amRNSOnshore oil acquisition
24th Jan 201410:00 amRNSCrown Estates grants 12 month extension
9th Jan 20142:14 pmRNSIndonesian Coal Investment
6th Dec 20137:00 amRNSUpdate - Evaluation of Further Investments
29th Nov 20133:02 pmRNSIssue of Equity
22nd Nov 201311:31 amRNSChange of Adviser
14th Nov 20132:14 pmRNSGrant of options
14th Nov 201312:32 pmRNSResult of General Meeting and Total Voting Rights
29th Oct 20132:04 pmRNS£2.25m Placing and Notice of General Meeting
25th Sep 20134:56 pmRNSHolding(s) in Company
23rd Sep 20131:40 pmRNSHolding(s) in Company
19th Sep 20137:00 amRNSHolding(s) in Company
18th Sep 20134:14 pmRNSHolding(s) in Company
20th Aug 201312:23 pmRNSHalf Yearly Report
27th Jun 201312:05 pmRNSResult of AGM
5th Jun 20134:30 pmRNSAnnual Report, AGM and proposed sub-division
23rd Apr 20135:05 pmRNSHolding(s) in Company
22nd Apr 20137:00 amRNSFurther high grade gold samples
7th Feb 20137:00 amRNSHigh Grade Gold Sample Results from Clogau Mine
5th Feb 201310:53 amRNSRenewal of License
2nd Nov 201210:56 amRNSWithdrawal of resolutions
2nd Nov 20127:00 amRNSOperational update
1st Nov 20123:55 pmRNSDisposal of interest in Hambric
9th Oct 201210:00 amRNSNotice of General Meeting
26th Sep 20127:00 amRNSHalf Yearly Report
19th Sep 201212:00 pmRNSDirectorate Change
26th Jul 20123:47 pmRNSResult of AGM and Director Resignations
28th Jun 201212:17 pmRNSAnnual Report and AGM
31st May 20128:50 amRNSTotal Voting Rights
21st May 201211:40 amRNSHolding(s) in Company
15th May 201211:34 amRNSNew Corporate Website
9th May 201210:41 amRNSResult of General Meeting
26th Apr 201212:20 pmRNSIssue of equity
20th Apr 20129:54 amRNSProposed Change of Name
17th Apr 20127:00 amRNSResource Estimate
10th Apr 20127:00 amRNSGrant of Options
4th Apr 20127:00 amRNSBoard changes
25th Jan 20127:00 amRNSRenewal of License
30th Dec 20117:00 amRNSTotal Voting Rights
16th Dec 201111:57 amRNSDirector Resignation
2nd Dec 20117:00 amRNSAcquisition
23rd Nov 20111:34 pmRNSChange of Registered Office
23rd Nov 201111:30 amRNSResult of Meeting
15th Nov 201112:10 pmRNSRevised placing
8th Nov 20117:00 amRNSProposed adoption of investing policy
4th Nov 20111:40 pmRNSIssue of equity and Board changes
30th Sep 20117:00 amRNSHalf Yearly Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.