RHA Tungsten Project implementation study complete

28 Jan 2015 07:00

RNS Number : 3155D
Premier African Minerals Limited
28 January 2015
Β 

ο»Ώ

Premier African Minerals Limited / Ticker: PREM / Index: AIM / Sector: Mining

For immediate release

28 January 2015

Premier African Minerals Limited

("Premier" or the "Company")

Implementation study completed for RHA Tungsten Project

Β 

Premier African Minerals Limited, the AIM-traded, multi-commodity natural resource company with mineral projects located in Southern and Western Africa, provides details of the Implementation Study Report prepared by the Company in regard to the open pit start up strategy for the RHA Tungsten Project ("RHA") in Zimbabwe. Premier is the operator and holds a 49% interest.

Β 

Highlights

Β· Pre-production capital reduced to US$4.15M

Β· Operating cost reduced to US$89.1/mtu

Β· Project schedule maintained, targeting first production in June 2015.

Β· Definitive estimate confirms robust project economics

Β· Process plant fabrication on schedule

George Roach, CEO, commented:

"The Implementation Study confirms our strategy for RHA and supports our conclusions that the open pit is projected to generate sufficient surplus cash to allow both commencement of repayment of loans made to RHA by Premier, and to finance the build of the underground operations. Most encouraging is the projected operating cost of US$89.1 per mtu WO3. Sensitivities included in the Implementation Study at section 15.5 set out just how robust RHA potentially is.

Premier remains in negotiations on the procurement of additional finance and it is important that the projected timeline to production at RHA remains dependent on closing negotiations presently underway. Similarly, whilst Premier has been offered off-take agreements for life of mine, the current discount associated with these offers is high, reflecting the current soft pricing of APT. Under the circumstances that RHA has the potential to be a significant, stable and long-term producer, and in accordance with Zimbabwean Government policy that encourages beneficiation, Premier is investigating the alternative market route of Ferro tungsten production."

Implementation Study

Premier has completed a detailed Implementation Study on the low capital open pit start up strategy previously announced (Press release of 28 October 2014). RHA will target processing of 8,000 tonnes of run of mine ore per month at a diluted grade of 10.24kg/t to produce, on average 92 tons of concentrate at 63% WO3 per month over a 22 month period. The definitive estimate is a culmination of work performed by Peacocke Simpson & Associates (Pvt.) Ltd, Appropriate Process Technologies (APT), CAE Mining Africa (CAE Mining), Senet (Pty) Ltd, Blonton Management Consultants, Ground Water Development Consultants, Constant Chuma Consulting and Bumira Environmental Consultants (Bumira), collectively "the Consultants" and is considered suitable as the control budget estimate for the execution phase (-5% to +15%).

Open Pit Financial Model

The financial model incorporates firm quotations for 80% of the pre-production capital estimate including fabrication and installation of the process plant, earthworks and civil works, road upgrade, mining contract as well as the procurement and construction management contract.

The Implementation Study Report is available for download from the Company's website, www.premierafricanminerals.com.

TheΒ resultsΒ ofΒ the definitive estimate presented in the Implementation Study Report areΒ tabulatedΒ below.

Β 

Β 

Item

Internal Assessment

Β - Open Pit

Life of Mine (Months)

22

Price (US$/mtu) received

214.5

Net Revenue (net of selling costs) (US$ million)

26.02

Operating cost (US$ million)

11.35

Pre-production Capital cost Β (US$ million)

4.146

Project LoM Capital cost (US$ million)

5.758

Contingency (included in capital cost)

0.142

Pre-tax Cash flow (US$ million)

8.92

NPV10 pre-tax (US$ million)

5.4

Payback from first production (months)

10.0

IRR (%), Pre-tax

161

Β 

Execution progress

Premier provides an update on the execution progress:

Early works

Β· Construction camp upgrade - Completed November 2014

Β· U/G Mine dewatering - Completed November 2014

Β· U/G Mine rehabilitation -Completed December 2014

Β· U/G channel sampling - Completed January 2015

Implementation programme

Β· Place order on plant fabrication- Completed December 2015

Β· Adjudicate Mining contract - Completed January 2015

Β· Adjudicate Road upgrade and earthworks and civils contract - Completed January 2015

Β· Adjudicate Procurement and Construction management contract - Completed January 2015

Next steps

Β· Initiate all construction contracts

Β· Initiate operational readiness program

Β· Obtain and finalise all required operational permitting

Β· Submit ESIA report for approval

Qualified Person

Werner Swanepoel, Chief Operating Officer of Premier, has reviewed and approved this release and the attachments thereto that are available for download from the Premier website. Mr Swanepoel has 21 years' experience in the Southern African mining industry and holds a Master's degree in Mining Engineering, an MBA and Mine Manager's Certificates in both Metalliferous and Coal Mining. He is a registered Professional Engineer with the Engineering Council of South Africa.

Forward Looking Statements

Certain statements in this announcement, are, or may be deemed to be, forward looking statements. Forward looking statements are identified by their use of terms and phrases such as ''believe'', ''could'', "should" ''envisage'', ''estimate'', ''intend'', ''may'', ''plan'', ''will'' or the negative of those, variations or comparable expressions, including references to assumptions. These forward looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth, results of operations, performance, future capital and other expenditures (including the amount, nature and sources of funding thereof), competitive advantages, business prospects and opportunities. Such forward looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. A number of factors could cause actual results to differ materially from the results discussed in the forward looking statements including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes, actions by governmental authorities, the availability of capital markets, reliance on key personnel, uninsured and underinsured losses and other factors, many of which are beyond the control of the Company. Although any forward looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions, the Company cannot assure investors that actual results will be consistent with such forward looking statements.

Β 

Enquiries

Pamela Hueston

Β 

Premier African Minerals Limited

Β 

Tel: +44 (0) 755 778 3855

Β 

Michael Cornish / Roland Cornish

Beaumont Cornish Limited

(Nominated Adviser)

Tel: +44 (0) 207 628 3396

Jerry Keen/ Edward Mansfield

Shore Capital Stockbrokers Limited

Tel: +44 (0) 207 408 4090

Tim Blythe/ Halimah Hussain

Blytheweigh

Tel: +44 (0) 207 138 3204

Β 

Β 

Notes

Premier African Minerals Limited (AIM: PREM) is a multi-commodity exploration and development company focused in Southern and Western Africa. The Company has a diverse portfolio of multi-commodity projects which includes tungsten, rare earth elements, gold, lithium and tantalum in Zimbabwe and Togo, which span from brownfield projects with near-term production potential to grass-roots exploration. The Company holds 2m shares in Circum Minerals Limited (Circum), the owners of the Danakil Potash Project. At present those shares are valued at US$2,5m based on the latest price at which Circum has accepted subscriptions.

Β 

Glossary of Technical Terms

"IRR" means Internal rate of return andΒ is the interest rate at which the net present value of all the cash flows (both positive and negative) from a project or investment equal zero.

"mtu" means metric ton unit, i.e. 10Kg of contained WO3 in concentrate.

"NPV10"Β means the present value of estimated future cash flows discounted at an annual discount rate of 10%.

Β "WO3" is tungsten trioxide.

ENDS

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLEAAFXAFASEAF
Date   Source Headline
30th Jul 20195:37 pmRNSShareholder Letter
24th Jul 20193:15 pmRNSHolding(s) in Company
17th Jul 20192:05 pmRNSSecond Price Monitoring Extn
17th Jul 20192:00 pmRNSPrice Monitoring Extension
17th Jul 20197:00 amRNSRHA Update
16th Jul 20196:00 pmRNSNotice of Annual General Meeting
12th Jul 20194:40 pmRNSOtjozondu Presentation
8th Jul 20197:00 amRNSLoan into Otjozondu Manganese Mining in Namibia
1st Jul 20197:00 amRNSFinal Results
27th Jun 20194:47 pmRNSInvestment by NIEEF into RHA
21st Jun 20197:00 amRNSUS$350,000 Loan Note Funding
12th Jun 201910:15 amRNSCircum Minerals Update to Shareholders
29th May 20197:00 amRNSIssue of equity and Director / PDMR shareholding
28th May 20194:18 pmRNSCorporate Update
28th May 20191:35 pmRNSZulu Lithium Drilling Programme Update
15th May 20197:00 amRNSZulu Lithium Drilling Programme Update
7th May 20197:00 amRNSRHA Investment and Management Agreement
17th Apr 20197:00 amRNSUpdate on the Acquisition of Mining Assets
4th Apr 20199:05 amRNSSecond Price Monitoring Extn
4th Apr 20199:00 amRNSPrice Monitoring Extension
27th Mar 20192:05 pmRNSSecond Price Monitoring Extn
27th Mar 20192:00 pmRNSPrice Monitoring Extension
13th Mar 201912:55 pmRNSUpdate on RHA
27th Feb 201911:05 amRNSSecond Price Monitoring Extn
27th Feb 201911:00 amRNSPrice Monitoring Extension
27th Feb 20197:00 amRNSAppointment of Joint Broker and placing
26th Feb 20197:07 amRNSZulu Lithium Drilling Programme
20th Feb 201910:40 amRNSProgress Update on RHA
18th Feb 20194:40 pmRNSSecond Price Monitoring Extn
18th Feb 20194:35 pmRNSPrice Monitoring Extension
14th Feb 20197:10 amRNSKME Transaction and Acquisition of Gold Assets
14th Feb 20197:00 amRNSUpdate on RHA
24th Dec 201810:00 amRNSRHA Update
5th Dec 20181:10 pmRNSUpdate on the Zimbabwe Minerals Projects
28th Nov 20182:05 pmRNSSecond Price Monitoring Extn
28th Nov 20182:00 pmRNSPrice Monitoring Extension
28th Nov 201810:50 amRNSUpdate on RHA Indigenisation Equity Resolution
22nd Nov 201811:40 amRNSUpdate on RHA Indigenisation Equity Resolution
21st Nov 20188:45 amRNSRHA Drilling Update
9th Nov 20182:45 pmRNSConversion of Director's Loan
9th Nov 20187:00 amRNSAmendment of Loan Agreement
7th Nov 20184:40 pmRNSSecond Price Monitoring Extn
7th Nov 20184:35 pmRNSPrice Monitoring Extension
7th Nov 20182:05 pmRNSSecond Price Monitoring Extn
7th Nov 20182:00 pmRNSPrice Monitoring Extension
7th Nov 201811:05 amRNSSecond Price Monitoring Extn
7th Nov 201811:00 amRNSPrice Monitoring Extension
7th Nov 20189:10 amRNSRestructuring of Zimbabwe minerals projects
1st Nov 20184:40 pmRNSSecond Price Monitoring Extn
1st Nov 20184:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.