Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPremier African Minerals Regulatory News (PREM)

Share Price Information for Premier African Minerals (PREM)

Share Price is delayed by 15 minutes
Get Live Data
0.023    0.002 (9.52%)
Bid:
0.022
Ask:
0.024
Spread: 0.002 (9.091%)
Market Cap: £9.04m
PREM Live PriceLast checked at - London Stock Exchange

Intraday Premier African Minerals Share Chart

RHA Drilling Update

3 Oct 2018 07:05

RNS Number : 7666C
Premier African Minerals Limited
03 October 2018
 

Premier African Minerals Limited / Ticker: PREM / Index: AIM / Sector: Mining

For immediate release

 

3 October 2018

 

Premier African Minerals Limited

RHA Drilling Update

 

Premier African Minerals Limited ("Premier" or the "Company") is pleased to provide an update on its drilling programme at the RHA Tungsten Mine ("RHA") in Zimbabwe in which Premier has a 49% interest and is the operator. As announced on 14 September the Company is drilling up to 2,750 metres to expand as well as to increase the Resources at RHA with the view to resume mining activities.

 

Highlights

· 9 diamond drill holes completed for 941 metres.

· Hole RHADD34 intersected 1.86 metres of 2.39 kg/t WO and 44.8 kg/t over 0.29m

· Drilling programme designed to expand and as well increase the resource confidence and guide future mine planning

· Sample preparation and assay is completed on site using owned XRF and standard reference material. Validations to be conducted by SGS

· Core logging of completed diamond drill holes has identified numerous wolframite and chalcopyrite bearing intercepts.

 

The preliminary analytical results set out in this announcement from underground drilling at RHA have been returned from the Company's own on-site analysis and samples are being submitted to SGS South Africa and the results of this analysis will be released in due course.

 

George Roach, Premier's CEO, commented: "The preliminary internal assay results from RHADD34 indicate multiple mineralised load structures with wolframite at commercial grades and visible copper mineralisation in the form of chalcopyrite co-existent in the same ore bodies as the wolframite. Wolframite concentrates previously produced at RHA have always contained copper, but no attempt was made to separately recover any copper, and whilst the production of any potential by- product is speculative at this time, the visibly pervasive presence needs a fuller investigation, and independent assay.

 This is likely to include floatation tests to understand what recoveries could be expected from these copper co-existent intersections. Whilst it is still too early to take a decision on whether to extend the underground operations at RHA through a new decline shaft or deepening of the current vertical shaft, projected mineralisation at depth is confirmed. Whilst drilling in the open pit has not been completed, the results obtained so far from the western end of the pit do not support a continuation of mining with the current plant configuration.

The results did however indicate that mineralisation is increasing in an easterly direction and it is likely that the pit may be extended at a time in the future if a decline shaft is constructed. Any significant extension to the open pit in an easterly direction will interfere with the existing vertical shaft."

 

Drilling Programme

Premier commenced a diamond drilling programme at RHA in the beginning of September 2018. The drilling programme is designed to expand the underground declared resource base as well as assisting with a determination of the future mining of the open pit. To date 9 holes have been drilled totalling 941 metres. The Company expects to complete the drilling programme by the end of October and will announce further meaningful intersections. Significant preliminary drilling results (subject to confirmation by SGS South Africa) returned to date include:

 

Table 1 - Drilling intercepts

 

Hole ID

From (m)

To (m)

Length (cm)

WO₃ kg/t

RHADD34

58,96

59,24

28

1,47

RHADD34

60,1

61,17

107

0,99

RHADD34

95,85

96,14

29

44,88

RHADD34

118,64

119,02

38

4,13

RHADD34

126,02

127

98

1,12

RHADD34

145,32

145,62

30

9,08

RHADD34

155,26

155,34

8

1,67

RHADD34

167,1

167,39

75

1,54

RHADD34

167,39

167,85

46

0,67

RHADD34

169,21

169,86

65

6,87

RHADD34

173,86

174,2

34

7,24

RHADD34

180,3

181,2

90

0,91

RHADD34

205,58

205,93

35

4,99

RHADD34

211,22

213,08

186

2,39

RHADD34

215,14

215,54

40

4,07

RHADD34

218,09

218,37

28

1,31

RHADD34

223,64

224,19

55

2,02

RHADD34

226,68

226,82

14

0,88

RHADD34

238,84

239,04

20

3,80

 

Notes:

(i) Reported intervals are downhole widths, the true widths may be narrower.

(ii) RHA's on-site laboratory is not certified for analysis and these results should be considered preliminary in nature. Results from a certificated laboratory will be released as and when available

 

QA/QC

Sample preparation is done at site and sample assays and the analytical results set out in this announcement from underground drilling at RHA have been returned from the Company's own on-site analysis out using RHA's own XRF. Every eighth sample analysed is a Certified Standard Reference Material ("CRM", GW-02 by Geostats, Australia) for tungsten. At least 20 per cent. of all samples will be submitted to SGS, South Africa, for verification of mineralisation and grades. The Company would further expect that in the preparation of any future independent reserve / resource statement undertaken in compliance with a recognised standard, the independent authors of such a statement would not use preliminary assay results but would only use assay results reported by an appropriately certificated laboratory.

 

 Qualified Person

Wolfgang Hampel, Senior Geologist with Premier African Minerals Limited, has reviewed and approved this release to the extent that reference is made to RHA. Wolfgang Hampel has 27 years' experience in the African, American, European and Asian exploration and mining industry and holds a Diploma in Economic Geology (Dipl.-Geol.) from the Technical University of Munich. He is a registered European Geologist (EurGeol). n° 1261 with the European Federation of Geologists.

 

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement. The person who arranged for the release of this announcement on behalf of the Company was George Roach, Director.

Enquiries:

Fuad Sillem

Premier African Minerals Limited

Tel: +44 (0)7734 922074

Michael Cornish / Roland Cornish

Beaumont Cornish Limited

(Nominated Adviser)

Tel: +44 (0) 20 7628 3396

Jerry Keen/Edward Mansfield

Shore Capital Stockbrokers Limited

Tel: +44 (0) 20 7408 4090

 

Notes to Editors:

Premier African Minerals Limited (AIM: PREM) is a multi-commodity mining and natural resource development company focused on Southern Africa with its RHA project in Zimbabwe.

 

The Company has a diverse portfolio of projects, which include tungsten, rare earth elements, lithium and tantalum in Zimbabwe, encompassing brownfield projects with near-term production potential to grass-roots exploration. In addition, the Company holds 5,010,333 shares in Circum Minerals Limited ("Circum"), the owners of the Danakil Potash Project in Ethiopia, which has the potential to be a world class asset. Premier also has an interest in Arc Minerals that has a number of mineral assets in Europe and Africa.

 

Forward Looking Statements:

Certain statements in this announcement are or may be deemed to be forward looking statements. Forward looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward looking statements.

 

 

 

ENDS

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDZMMGGGZVGRZZ
Date   Source Headline
10th Jun 20167:00 amRNSFinal Results
17th May 20162:53 pmRNSInterim RHA Update
27th Apr 201610:43 amRNSControlling Interest:Mozambique Limestone Project
25th Apr 20162:03 pmRNSAGM Statement
6th Apr 20167:00 amRNSUpdate on RHA Tungsten Mine
31st Mar 20167:51 amRNSCircum Minerals update
23rd Mar 20164:04 pmRNSNotice of Annual General Meeting
1st Mar 20167:00 amRNSIssue of equity
24th Feb 201610:45 amRNSConversion of last remaining loan notes
23rd Feb 20163:34 pmRNSConversion of loan note and issue of equity
22nd Feb 20162:19 pmRNSRHA Project Update
22nd Feb 20161:37 pmRNSConversion of loan note and issue of equity
18th Feb 20169:57 amRNSConversion of loan note and issue of equity
16th Feb 20167:12 amRNSIssue of Equity
15th Feb 20161:15 pmRNSRHA Direct Finance Update
2nd Feb 20168:10 amRNSConversion of loan
2nd Feb 20167:00 amRNSIssue of equity and Proposed Conversion of loan
27th Jan 20167:00 amRNSOpen Pit Mineral Resource Review
18th Jan 20167:00 amRNSUnderground Implementation Update: RHA Mine
13th Jan 20167:00 amRNSIssue of Equity
21st Dec 201512:35 pmRNSZulu Tantalum and Lithium update
18th Dec 20154:33 pmRNSConversion of loan and issue of equity
11th Dec 201512:59 pmRNSConversion of loan and issue of equity
10th Dec 20157:00 amRNSCircum Minerals Update
10th Dec 20157:00 amRNSIssue of Equity
3rd Dec 201512:41 pmRNSConversion of loan note and issue of equity
24th Nov 20157:00 amRNSCorporate Update
20th Nov 20157:00 amRNSEarly Release of Second Tranche of Darwin Loan
27th Oct 20157:00 amRNSConversion of loan note and RHA Update
9th Oct 201512:13 pmRNSLoan Note Instrument
2nd Oct 20151:53 pmRNSIssue of Equity
30th Sep 201512:07 pmRNSInterim Results
22nd Sep 20157:00 amRNSIssue of Equity
15th Sep 20157:00 amRNSCorporate and RHA Project Update
25th Aug 20157:09 amRNSRHA Project and Corporate Update
7th Aug 20157:00 amRNSCircum Minerals Ltd Update
4th Aug 20159:18 amRNSRHA Project Update
30th Jul 20157:01 amRNSExercise of Share Options and Director's Dealings
14th Jul 20159:20 amRNSAward of new exploration tenements in Benin
10th Jul 201511:45 amRNSExercise of share options and director's dealings
9th Jul 20157:00 amRNSZulu Project update and equity issue
8th Jul 20157:30 amRNSRHA Project Update
24th Jun 20158:00 amRNSExercise of Warrants and Issue of Equity
24th Jun 20157:00 amRNSFinal Results
5th Jun 201512:46 pmRNSFirst Concentrates Produced at RHA
26th May 20157:01 amRNSConstruction Update
11th May 20158:48 amRNSReplacement: Circum Minerals Ltd Update
11th May 20157:00 amRNSCircum Minerals Ltd Update
5th May 20157:01 amRNSProcess Plant Fabrication Complete
1st May 20155:02 pmRNSConversion of loan note and issue of equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.