The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPredator Oil Regulatory News (PRD)

Share Price Information for Predator Oil (PRD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 9.50
Bid: 9.00
Ask: 10.00
Change: 0.25 (2.70%)
Spread: 1.00 (11.111%)
Open: 9.25
High: 9.50
Low: 9.25
Prev. Close: 9.25
PRD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

MOU-2 Drilling Update

25 Jan 2023 07:00

RNS Number : 7482N
Predator Oil & Gas Holdings PLC
25 January 2023
 

FOR IMMEDIATE RELEASE

25 January 2023

 

Predator Oil & Gas Holdings Plc / Index: LSE / Epic: PRD / Sector: Oil & Gas

LEI 213800L7QXFURBFLDS54

Predator Oil & Gas Holdings Plc

("Predator" or the "Company" and together with its subsidiaries the "Group")

 

Highlights

· MOU-2 well suspended above Moulouya Fan target.

 

· Re-evaluation of drilling mud programme required for unexpected geological formation before re-entry is considered.

 

· Star Valley rig 101 will remain in place on location.

 

· Extended MOU-1 perforating and testing programme to proceed.

 

 

MOU-2 Drilling Update

Predator Oil & Gas Holdings Plc (LSE: PRD), the Jersey based Oil and Gas Company with near-term gas operations focussed on Morocco, announces an update on the drilling of the MOU-2 well in the Guercif Petroleum Agreement onshore Morocco.

The MOU-2 well has been suspended with an option to re-enter after reaching a depth of 1,260 metres Measured Depth.

Wireline logs were acquired from the 95/8" casing point at 677 metres to 1,010 metres Measured Depth. The wireline logging tools were not able to log deeper than this depth due the presence of extremely sticky clays in a geological formation overlying the Moulouya Fan primary objective. Photographs of the logging tools covered in the formation mud have been uploaded to the Company's website at www.predatoroilandgas.com.

Below the logged interval a gross interval of 165 metres was penetrated with up to 100 metres of variable quality sand. A strip log through this interval has been uploaded to www.predatoroilandgas.com. Presence of significant thicknesses of sands demonstrate the potential sand source area feeding the Moulouya Fan below the debris flow.

This geological formation is interpreted to be a slumped basin margin debris-flow which has not been encountered in previous drilling in the area. The clays are particularly under-compacted and sticky due to very rapid deposition within the debris-flow. The interval presented a drilling challenge with very low rates of penetration.

Presence of significant thicknesses of sands in the debris-flow demonstrate the potential sand source area feeding the Moulouya Fan as mapped pre-drill.

Above the depth at which the well was suspended a detached transported block of the Moulouya Fan target may have been penetrated. A gross interval of 28 metres was estimated on the basis of the well site cutting samples and lithological log. 16 metres of potential reservoir was interpreted from drilling breaks. This can only be confirmed by wireline logging.

At 1260 metres Measured Depth a decision to suspend the well was taken as rates of penetration had dropped to below 1 meter/hour.

Forward Plan

The mud programme and its compatibility with the previously not seen sand-rich geological formation represented by the debris-flow will require re-evaluation to achieve a more cost effective rate of penetration.

The debris flow potentially forms a highly effective seal on the underlying Moulouya Fan. The thickness of the Moulouya Fan reservoir interval is expected to increase between MOU-1 and MOU-2 based on the sand content of the debris-flow penetrated in MOU-2 allowed an extrapolation across to MOU-1 to be made.

As a result of this the MOU-1 perforating and testing programme will be more focussed and extensive in the principal zone of interest to determine potential connectivity with the seismically defined area of the Moulouya Fan between MOU-1 and MOU-2 that is interpreted as potentially gas-bearing.

A re-entry and deepening of MOU-2 will be fully evaluated once a solution to optimising the drilling mud programme and mud properties has been completed.

Conclusion

The Moulouya Fan target has not been reached yet in MOU-2 as a consequence of the requirement to re-evaluate the drilling programme through the unexpected geological formation encountered in the well.

Until that re-evaluation is complete and a decision to re-enter MOU-2 has been taken pre-drill objectives remain unchanged as do potential estimates of gas resources.

The MOU-1 testing programme is being progressed and revised to gather as much information as possible on connectivity of potential gas sands over a wide area.

Paul Griffiths, Executive Chairman of Predator Oil & Gas Holdings Plc commented:

"MOU-2 has been an extremely challenging well to drill due to the presence of a particular geological formation not previously encountered.

The prudent and safer option was to suspend the well and leave it in a state to re-enter once a better understanding of the mud programme required to drill this particularly complex interval efficiently and cost-effectively.

Whilst this is not the result we wanted the pre-drill objectives and potential resources remain unchanged.

The Star Valley rig will remain in place over the well head."

 

 

For further information visit www.predatoroilandgas.com

 

Follow the Company on twitter @PredatorOilGas.

 

This announcement contains inside information for the purposes of Article 7 of the Regulation (EU) No 596/2014 on market abuse

For more information please visit the Company's website at www.predatoroilandgas.com

 

 

 

 

Enquiries:

Predator Oil & Gas Holdings Plc

Paul Griffiths Executive Chairman

Lonny Baumgardner Managing Director

Tel: +44 (0) 1534 834 600

Info@predatoroilandgas.com

Novum Securities Limited

David Coffman / Jon Belliss

 

Optiva Securities Limited

Christian Dennis, CEO

Ben Maitland, Corporate Finance

 

Tel: +44 (0) 207 399 9425

 

 

Tel: +44 (0) 203 137 1902

 

Tel. +44 (0) 203 034 2707

 

 

 

Flagstaff Strategic and Investor Communications

Tim Thompson 

Mark Edwards

Fergus Mellon

 

 

Tel: +44 (0) 207 129 1474

predator@flagstaffcomms.com

 

Notes to Editors:

 

 

Predator is operator of the Guercif Petroleum Agreement onshore Morocco which is prospective for Tertiary gas in prospects less than 10 kilometres from the Maghreb gas pipeline. The MOU-1 well has been completed and a follow-up testing programme is being finalised to coordinate with a further drilling programme.

 

Predator is seeking to further develop the remaining oil reserves of Trinidad's mature onshore oil fields through the application of CO2 EOR techniques and by sequestrating anthropogenic carbon dioxide to produce "greener" oil.

 

In addition, Predator also owns and operates exploration and appraisal assets in licensing options offshore Ireland, for which successor authorisations have been applied for, adjoining Vermilion's Corrib gas field in the Slyne Basin on the Atlantic Margin and east of the decommissioned Kinsale gas field in the Celtic Sea.

 

Predator has developed a Floating Storage and Regasification Project ("FSRUP") for the import of LNG and its regassification for Ireland and is also developing gas storage concepts to address security of gas supply and volatility in gas prices during times of peak gas demand.

 

The Company has a highly experienced management team with a proven track record in operations in the oil and gas industry.

 

 

 

 

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLEAPFLALFDEFA
Date   Source Headline
1st May 20247:00 amRNSRatification of Guercif Petroleum Agreement
18th Apr 20247:00 amRNSIssuance and Lapse of Share Options
12th Apr 20247:00 amRNSNotice of AGM and Posting of Circular
10th Apr 20247:00 amRNSFinancial Statements Year Ended 31 December 2023
14th Mar 20247:00 amRNSCorporate Presentation Update
20th Feb 20247:00 amRNSPhase 1 Rigless Testing Update
5th Feb 20247:00 amRNSExtension of 2022 Star Valley Rig 101 Contract
26th Jan 20247:01 amRNSCorporate Update
26th Jan 20247:00 amRNSExpected date commencement rigless testing
12th Jan 20247:00 amRNSOperations Update and 2024 Forward Work Programme
29th Dec 20237:00 amRNSTotal Voting Rights
6th Dec 202311:28 amRNSPDMR Notifications
6th Dec 20237:00 amRNSPDMR Notifications
1st Dec 20231:33 pmRNSIssue of Shares to Executive Directors
30th Nov 20237:00 amRNSUpdate on Guercif testing Morocco and Trinidad
30th Nov 20237:00 amRNSMemorandum of Understanding with Afriquia Gaz S.A.
7th Nov 20237:00 amRNSCompletion T-Rex Resources Cory Moruga acquisition
16th Oct 20234:52 pmRNSPDMR Notifications
16th Oct 20234:34 pmRNSPDMR Notifications
13th Oct 20237:00 amRNSIssuance of Share Options
5th Oct 20237:00 amRNSMorocco Operations Update
19th Sep 202310:45 amRNSReport and Interim Financial Statements
11th Sep 20237:00 amRNSMoroccan Earthquake
31st Aug 20239:42 amRNSTotal Voting Rights
30th Aug 20237:00 amRNSOperations Update
17th Aug 20238:03 amRNSPDMR Notifications
16th Aug 20234:08 pmRNSNotification of Major Holdings
16th Aug 20234:02 pmRNSPDMR Notifications
15th Aug 20237:00 amRNSAdmission of Shares
10th Aug 202312:08 pmRNSPublication of a Prospectus
1st Aug 20237:00 amRNSResult of the Placing
31st Jul 20234:35 pmRNSProposed Placing to raise a minimum of £7million
13th Jul 20237:00 amRNSMOU-4 Update
11th Jul 20237:00 amRNSCompletion of MOU-4 drilling and logging
4th Jul 20237:00 amRNSMOU-4 Commencement of Drilling
3rd Jul 202311:31 amRNSPDMR Notifications
3rd Jul 202311:00 amRNSPDMR Notification
3rd Jul 20238:57 amRNSNotification of Major Holdings
3rd Jul 20238:52 amRNSPDMR Notifications
28th Jun 20237:00 amRNSLoan of Net Proceeds of Directors Share Sales
27th Jun 20237:00 amRNSCompletion of MOU-3 Drilling and Logging
13th Jun 20237:00 amRNSInterim drilling update MOU-3
2nd Jun 20237:00 amRNSMOU-3 Drilling Update
1st Jun 20237:00 amRNSUpdate on acquisition of Cory Moruga
31st May 202311:13 amRNSResult of Annual General Meeting
31st May 20237:00 amRNSTotal Voting Rights
26th May 20237:00 amRNSAdmission of Shares
24th May 202310:08 amRNSNotification of Major Holdings
24th May 202310:05 amRNSNotification of Major Holdings
24th May 202310:01 amRNSPDMR Notifications

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.