SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Operations Update

30 Apr 2021 07:45

RNS Number : 2022X
President Energy PLC
30 April 2021
 

30 April 2021

 

PRESIDENT ENERGY PLC

("President" or the "Company")

 

 Operations update

 

President Energy (AIM: PPC), the energy company with a diverse portfolio of production and exploration assets focused primarily in South America, provides an operational update with regard to certain activities in the Rio Negro Province, Argentina

 

Highlights

· Gas well LB-1002, Las Bases field successfully completed with initial production levels 30% better than anticipated

· New gas well EV-1002 spudded

· New gas well EV-1001 to be completed and projected to be placed on stream within 14 days

 

LB-1002

 

Following the drilling of the gas well LB-1002 in the Las Bases field, the first of the current three well campaign, the well has now been successfully completed with a total perforated interval of 5 metres (16 feet) in the lower Centenario 5 and 6 intervals without any form of stimulation. These intervals were not in the primary target, nor expected to be productive at the time of well planning and is therefore somewhat of a bonus.

 

The well was produced on test with an 8mm choke. Production was stable at some 55,000 m3/d of gas (1.94 MMsft/d or circa 323 boepd) versus pre-drill and post-drill estimates of 40,000 m3/d, a 30% increase. Pressure remained robust through the test with no formation water identified. It is expected that the well will be producing on stream by the end of next week.

 

Remaining to be tested is the main target, a known productive and thicker pay interval higher up the hole, the Centenario 3 section. President will first produce from the current intervals being the Centenario 5 and 6 sections and use the data for further consideration of the Las Bases field.

 

By illustration only, to place the financial benefit of the current production in context, using the prevailing spot gas price of US$4 MMBtu, the income net to President per month after relevant opex on the assumption of the tested production levels continuing would run at US$200k per month.

 

New well EV-1002

 

This well has now spudded. Estimated time to drill, log and case the well is 15 days from now.

 

By way of reminder, this well is designed as a twin well of the formerly producing gas well EV-4 which was drilled in 1989 and which ceased production in 2019 due to a casing collapse.

 

Pre-drill estimates of initial production in the success case are similar to the just drilled well EV-1001 namely 60,000 m3/d (2.1 MMscft/d or 350 boepd).

 

 

New well EV-1001

 

The coiled tubing unit and ancillary test and stimulation equipment to complete this well and place it on production is now mobilising to location from the LB-1002 site. It is projected that subject to successful completion this well, the second in the current drilling campaign, will be placed on stream within 14 days.

 

 

Peter Levine, Chairman, commented

 

"There is understandably significant investor interest in the progress of the much discussed exploration farm-out in Paraguay in respect of which I continue to urge patience reflecting the multi-stage signing authority process required by a rigidly structured state energy company.

 

"However, in that context it is important to keep in mind we are relative to our size a significant and successful operational company. Such continued progress in the field once again demonstrated by this announcement. We do not take each progression in operations on the ground as some side show to be taken for granted and ignored. Each step has challenges to navigate.

 

"Exciting and potentially transformational exploration is great and of value to have in our portfolio but it is this progress and the hard work of our people on the ground that will deliver a substantial improvement in the financial position and prospects of President, 2021 compared with last year"

 

 

Glossary

Bopd means barrels of oil per day

Boepd means barrels of oil and gas equivalent

MMBtu means million standard cubic feet of gas

Mmsft/d means Million standard cubic feet of gas per day

M3/d means million of cubic metres of gas per day

 

 

Contact:

President Energy PLC

Nikita Levine, Investor Relations

 

 

+44 (0) 207 016 7950

 info@presidentpc.com

finnCap (Nominated Advisor and broker)

Christopher Raggett, Tim Harper

 

+44 (0) 207 220 0500

 

 

 

 

Notes to Editors

President Energy is an oil and gas company listed on the AIM market of the London Stock Exchange (PPC.L) primarily focused in Argentina, with a diverse portfolio of operated onshore producing and exploration assets.

 

The Company has operated interests in the Puesto Flores, Estancia Vieja, Puesto Prado and Las Bases Concessions, and Angostura exploration contract, all of which are situated in the Rio Negro Province in the Neuquén Basin of Argentina and in the Puesto Guardian Concession, in the Noroeste Basin in NW Argentina. Alongside this, President Energy has cash generative production assets in Louisiana, USA and further significant exploration and development opportunities through its acreage in Paraguay and Argentina.

 

The Group is also actively pursuing value accretive acquisitions of high-quality production and development assets capable of delivering positive cash flows and shareholder returns. With a strong strategic and institutional base of support, including the international commodity trader and logistics company Trafigura, an in-country management team as well as the Chairman whose interests as the largest shareholder are aligned to those of its shareholders, President Energy gives UK investors access to an energy growth story combined with world class standards of corporate governance, environmental and social responsibility.

This announcement contains inside information for the purposes of article 7 of Regulation 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDDZGFDVGMGMZG
Date   Source Headline
6th Feb 20137:00 amRNSChange of Registered Office
30th Jan 20137:00 amRNSOperational Update
16th Jan 20137:00 amRNSInvestor Presentation
16th Jan 20137:00 amRNSBoard Appointments
14th Jan 20137:00 amRNSDirector Dealing
2nd Jan 20133:45 pmRNSTR-1: Notification of Major Interest in Shares
2nd Jan 20133:40 pmRNSTR-1: Notification of Major Interest in Shares
2nd Jan 20138:36 amRNSDirector Dealing
20th Dec 20123:44 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
17th Dec 20127:00 amRNSCompetent Persons Report for Pirity & Demattei
5th Dec 20125:34 pmRNSTR-1: Notification of Major Interest in Shares
5th Dec 20127:00 amRNSInauguration of Exploration Programme in Paraguay
4th Dec 20129:39 amRNSTR-1: Notification of Major Interest in Shares
4th Dec 20129:34 amRNSTR-1: Notification of Major Interest in Shares
26th Nov 20127:00 amRNSAward of Options
19th Nov 20129:09 amRNSDirector Dealing
19th Nov 20127:00 amRNSAppointment of CEO
13th Nov 201211:40 amRNSConference presentation
13th Nov 20127:00 amRNSOperational Update
12th Nov 20122:28 pmRNSTR-1: Notification of Major Interest in Shares
9th Nov 20123:04 pmRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
7th Nov 20124:37 pmRNSNotification of Major Interest in Shares
6th Nov 20127:02 amRNSTR-1 Notification
6th Nov 20127:01 amRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
6th Nov 20127:00 amRNSTotal Voting Rights and Share Capital
30th Oct 20127:00 amRNSCompletion of Farm-In Agreements
3rd Oct 20129:54 amRNSTR-1: Notification of Major Interest in Shares
3rd Oct 20128:56 amRNSTR-1: Notification of Major Interest in Shares
3rd Oct 20128:53 amRNSTR-1: Notification of Major Interest in Shares
3rd Oct 20128:46 amRNSTR-1: Notification of Major Interest in Shares
1st Oct 20127:00 amRNSResult of Placing and Open Offer
28th Sep 201212:17 pmRNSResult of General Meeting
27th Sep 20124:35 pmRNSPrice Monitoring Extension
27th Sep 20127:00 amRNSInterim Results
18th Sep 20125:56 pmRNSNotification of Major Interest in Shares
18th Sep 20123:06 pmRNSNotification of Major Interest in Shares
17th Sep 20123:59 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
20th Aug 20127:00 amRNSArgentina Licence Awards and Assignment Agreement
3rd Aug 20127:00 amRNSTrading and Operations Update
16th Jul 20127:00 amRNSPending Licence Awards
13th Jun 20121:30 pmRNSResult of AGM
7th Jun 20127:00 amRNSDate of AGM
1st Jun 20127:00 amRNSDirector Dealing
30th May 20127:00 amRNSDirector Dealing
28th May 20127:00 amRNSArgentina Operations Update
11th May 20127:33 amRNSPeter Levine appointed as Executive Chairman
11th May 20127:00 amRNSResults for the year to 31 December 2011
8th May 20127:00 amRNSDrilling Update Well DP 1001 Argentina
18th Apr 20127:00 amRNSRecent Events in Argentina
10th Apr 20127:00 amRNSOperations Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.