Ryan Mee, CEO of Fulcrum Metals, reviews FY23 and progress on the Gold Tailings Hub in Canada. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update Well DP 1001 Argentina

8 May 2012 07:00

RNS Number : 8248C
President Petroleum Company PLC
08 May 2012
 



8 May 2012

PRESIDENT PETROLEUM COMPANY PLC

("President" or "the Company")

 

Drilling Update Well DP 1001 Argentina

Successful Flow Test

First New Argentine well on Commercial Production

 

President is pleased to announce the successful testing and immediate placement on commercial production of Well DP 1001 at the Dos Puntitas field, Puesto Guardian concession, Argentina (President 50% working interest). This is the first new well of President to be commissioned as a producer since its July 2011 purchase of its interest at Puesto Guardian. The oil will be sold through existing arrangements, where President and its partner are receiving approximately US$ 72 per barrel, as compared to the US$ 56 per barrel received in July 2011.

 

These drilling and test results support President's group production target of 1300-1500 bopd around end Q3 2012.

 

As previously announced, Well DP 1001 identified, through cores and electric logs, 3 productive reservoirs with 33 meters of net pay. Respectively, these are the carbonate interval, and the A6 and A5 sands.

 

Carbonate Interval

An extended production test on the carbonate interval has now been completed, achieving a stabilised flow rate of in excess of 300 bopd, without any stimulation or pumping, and a flowing pressure of 30 Kg/cm2. The oil is very light and high quality. 

 

The test has successfully confirmed that the carbonate interval is at original oil saturations and conditions, and contrary to pre drill estimates, is capable of sustaining a significant oil rate without stimulation.

 

The well is now being commissioned as a producer through the Dos Puntitas facility. The well data will continue to be analysed to assess the full potential from this zone, which will be considered as a frac candidate for the upcoming summer campaign.

 

A6 Sands

A production test was carried out on the A6 sand at a swab rate of approx. 100 bopd whilst still cleaning up with approx. 10% completion fluid and mud filtrate. The test has confirmed that the A6 is at original oil saturations. The zone will be fracced in the summer and President believes the A6 will flow at similar rates to the carbonates, at which time it will be commingled with production from the carbonate interval.

 

A5 Sands

The lower A5 interval will not be initially produced commingled due to different pressures but will produced in this well in the future and will also be targeted in a follow up wells. Due to the unavailability of the required isolation production packer, the sands were not included in this test program. However, based upon the quality of the sands, the 12m of oil column above the Dos Puntitas original oil water contact, and the production test rates in offset wells (150bopd in Pozo Escondido), new reserves have been discovered in the A5 with preliminary in-place volumes of some 3-5 million barrels. The A5 sands have similar production potential to those in Pozo Escondido.

 

 

Commenting on today's announcement, Peter Levine, Chairman of President Petroleum Company Holdings BV said:

 

"The test results of DP-1001 are extremely encouraging and we are now looking forward to increased production revenue as a result of this new well.

 

The well results of DP-1001 are significant on a number of grounds. Firstly, it has demonstrated that President's pre-drill guidance for a post-frac well initial of 380 bopd can be exceeded. To obtain these test results from just one of three intervals without stimulation is clearly satisfying however President believes that with further improvements to the drilling and completion techniques as well as with fraccing, considerably more can be realised from both existing and new wells and we look forward to the upcoming fraccing campaign.

 

Secondly, the well has confirmed that the southern part of the Dos Puntitas field is undeveloped. The Dos Puntitas field has a historical recovery factor of approx. 10%, which is low for a reservoir of this type with a good water drive. DP-1001 has confirmed the further development potential of the field, which is also being targeted with the DP-1002 well and new locations that will be firmed up once reservoir models have been updated in the near future.

 

Thirdly, the well has discovered new oil reserves in the A5 sand.

 

Lastly, the results in the carbonate interval in particular provide further affirmation of potential of the carbonate reservoir across the concession, where, as previously announced, President has preliminarily identified approximately 66 million new barrels of oil in place on three fields."

 

 

 

For further information contact:

 

President Petroleum Company

John Hamilton, Director +44 (0) 207 811 0140

Ben Wilkinson, Finance Director +44 (0) 207 811 0140

 

RBC Capital Markets

Jeremy Low, Stephen Foss, Matthew Coakes +44 (0) 207 653 4000

 

Jefferies Hoare Govett

Simon Hardy, Max Jones +44 (0) 207 029 8316

 

Pelham Bell Pottinger +44 (0) 207 861 3232

James Henderson, Mark Antelme

 

 

Dr Jonathan M Cohen, FGS, C Geol, Executive Vice President Exploration, meets the criteria of

qualified persons under the AIM guidance note for mining and oil and gas companies, has reviewed

and approved the technical information contained in this announcement.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGMGGKZNZGZZZ
Date   Source Headline
29th Sep 20222:04 pmRNSResult of General Meeting
27th Sep 202211:05 amRNSSecond Price Monitoring Extn
27th Sep 202211:00 amRNSPrice Monitoring Extension
27th Sep 20227:00 amRNSInterim Results
7th Sep 20227:00 amRNSCircular & Notice of General Meeting
12th Aug 20227:00 amRNSH1 Argentina Financial Results
11th Aug 20227:00 amRNSHSE Update on Puesto Flores Facility
28th Jul 20227:00 amRNSTrading and Corporate Update
25th Jul 20227:00 amRNSGreen House Capital and Argentina Update
22nd Jul 20221:58 pmRNSResult of AGM
30th Jun 20227:00 amRNSPosting of Annual Report and Notice of AGM
28th Jun 20227:00 amRNSFinal Results
16th Jun 20227:00 amRNSCorporate and Commercial Update
13th May 20227:00 amRNSQ1 Argentina Financial Results
20th Apr 20227:00 amRNSOperational and Strategy Update
15th Mar 20227:00 amRNSPositive Production Sales
14th Mar 20227:00 amRNSArgentine Minibond
1st Mar 20227:00 amRNSOperations and Management Update
14th Feb 20227:00 amRNS2021 Key Trading Highlights
7th Feb 20227:00 amRNSOperations Update
26th Jan 20227:00 amRNSArgentina Update
25th Jan 20227:00 amRNSOperational Update
13th Jan 20227:00 amRNSOperations Update
30th Dec 20217:00 amRNSAtome Energy PLC first day of dealings on AIM
24th Dec 20211:15 pmRNSPresident Energy
24th Dec 20217:00 amRNSDividend in specie in Atome Energy PLC
23rd Dec 20217:00 amRNSOperations Update
17th Dec 20217:00 amRNSSuccessful completion of fundraise by Atome Energy
16th Dec 20217:00 amRNSOperations Update
14th Dec 20217:00 amRNSInvestor Presentation - Atome Energy PLC
10th Dec 20212:05 pmRNSAtome Publishes AIM Schedule One
10th Dec 20217:00 amRNSProposed dividend in specie in Atome Energy PLC
9th Dec 20217:00 amRNSOperations Update
8th Dec 20217:00 amRNSPrimaryBid Information for President Shareholders
2nd Dec 202112:00 pmRNSExercise of Options
2nd Dec 20217:00 amRNSOperations Update
25th Nov 20217:00 amRNSCompletion of Paraguay Farm-out
24th Nov 20217:00 amRNSIssuance of Corporate Bond in Argentina
22nd Nov 20218:53 amRNSAMENDED: Operations and Corporate Update
22nd Nov 20217:00 amRNSOperations and Corporate Update
19th Nov 20217:00 amRNSPosting of Letter to Shareholders
18th Nov 202112:28 pmRNSResult of General Meeting
18th Nov 20217:00 amRNSAnnouncement made by Haldor Topsoe
17th Nov 20217:00 amRNSConfirmation of Reduction of Capital
5th Nov 20217:00 amRNSAnnouncement by Atome Energy PLC - MOU Signed
5th Nov 20217:00 amRNSOperations Update
2nd Nov 20217:00 amRNSAtome Posting and Notice Announcement
2nd Nov 20217:00 amRNSAnnouncement by Atome Energy PLC - CEO Appointment
25th Oct 20217:00 amRNSAnnouncement made by Atome Energy PLC
12th Oct 20217:00 amRNSOctober Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.