SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Operational Update

8 Jan 2014 07:00

RNS Number : 1332X
President Energy PLC
08 January 2014
 



8 January 2014

PRESIDENT ENERGY PLC

("President" or "the Company")

OPERATIONAL UPDATE

 

PARAGUAY RIG PROCURED - DRILLING PREPARATIONS ON TRACK

 

President Energy is pleased to provide an operational update on the Company's assets.

 

Highlights

 

Paraguay

 

· Rig procured for 2014 exploration programme

 

· Preparations for drilling campaign on track

 

· Weather permitting, first well scheduled to spud during May 2014

 

· Seismic results continue to support previous expectations, updated audit report now scheduled by end this month

 

Argentina

 

· Argentina frac programme completed with proven success. Realised oil prices increased by 13% over last year to US$ 76/bbl

 

Louisiana

 

· Louisiana production remains strong, with oil prices stable at US$ 109/bbl

 

 

PARAGUAY

 

Rig Procured

 

A letter of intent has now been entered into for a rig to drill the 2014 exploration programme. The contractor is Queiroz Galvão Óleo e Gás, one of the largest drilling contractors and production services providers in Brazil. The Top Drive Rig is capable of drilling down to depths of 5000 metres which is adequate to explore the deeper Paleozoic play identified in President's seismic survey. Mobilisation from Brazil is due to commence during February 2014 and is estimated to take two months, with the first well scheduled to spud, weather permitting, during May 2014.

 

Drilling Preparations

 

Preparations for drilling continue and are on track. Schlumberger experts are now in country supporting President's growing team. Civil works at two well locations are advanced with drilling pads being prepared.

 

Seismic Survey

 

The results of the extensive seismic programme are still being analysed. Due to the increased amount of seismic data acquired, the final results are now expected during the course of January. The information to date supports the management's previously announced views of the two major structural play fairways identified and the gross risked prospective resource potential of in excess of 500 mmboe as a realistic possibility. An updated independent audit by RPS is also expected to be announced by the end of January.

ARGENTINA

 

Summary of Well Stimulations Results at Puesto Guardian (PPC 50% Working Interest):

 

As a result of the frac campaign (excluding PE-8) gross field production has stabilised at 415bopd, an increase of 40%. With the well performance data now observed, management is confident that the frac campaign has proved successful and sufficient production data are now available to commence a reserves update. Whilst technical problems have hindered PE-8, this does not detract from the successful proof of concept of commercial, hydraulic stimulation in Puesto Guardian.

 

PE-7

After four months of production, the well continues to perform strongly and is free flowing without further decline into the facility on a 45/64 inch choke with an average month four rate of 185 gross barrels of fluid per day, with 73% oil. 

 

DP-1001

After seven months of production, the well continues to free flow without further decline into the facility on a 9/16 inch choke with an average month seven rate of 110 gross barrels of fluid per day, with 66% oil.

 

PE-8

After hydraulic stimulation of the carbonate interval, an inflow test was commenced with a W1 of approximately 340 gross barrels of fluid per day and after three days of clean-up reached 15% oil. A workover was carried out to open the A6 interval and install a beam pump. Production re-commenced at 200 gross barrels of fluid per day (10% oil) on 11th November, however the pump performance continued to drop off over three weeks before failing. This is most likely due to seal damage from some low level of sand production. The well is currently shut-in awaiting a pulling operation to change the pump seals.

 

Current realised oil prices have increased to US$76/bbl representing an increase of some 13% from the levels of US$65/bbl achieved a year ago.

 

 

LOUISIANA

 

Production remains strong. While December volumes will be lower due to routine field maintenance at both EWL and ELV, as well as cold weather, average monthly production has been approximately 250 boepd for the past 3 months. Oil prices remain firm at US$109 per barrel. In H1 2014, President and its partners intend to drill two new exploration wells. 

 

Peter Levine, Chairman, President Energy commented:

"The focus for 2014 is most certainly Paraguay and we are on track operationally. The retention of a leading South American drilling company complements the recruitment of Schlumberger as Integrated Project Manager and completes what we consider to be a world class team for our 2014 drilling campaign."

 

 

Miles Biggins, Bsc Joint Honours University College London, with 22 years of experience in the oil and gas sector, is a Petroleum Engineer and member of the Society of Petroleum Engineers who meets the criteria of qualified persons under the AIM guidance note for mining and oil and gas companies, has reviewed and approved the technical information contained in this announcement.

 

Contact:

President Energy PLC

John Hamilton, CEO +44 (0) 207 016 7950

Ben Wilkinson, Finance Director +44 (0) 207 016 7950

 RBC Capital Markets

Jeremy Low, Matthew Coakes, Daniel Conti +44 (0) 207 653 4000

Canaccord Genuity Limited

Tim Redfern, Henry Fitzgerald-O'Connor +44 (0) 207 523 8000 

Bell Pottinger +44 (0) 207 861 3232

Gavin Davis, Henry Lerwill

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUGUWPGUPCPGM
Date   Source Headline
22nd Jan 20207:00 amRNSPosting of Circular and Notice of General Meeting
20th Jan 20207:00 amRNSSubscription for new Ordinary Shares by Trafigura
7th Jan 202011:05 amRNSSecond Price Monitoring Extn
7th Jan 202011:00 amRNSPrice Monitoring Extension
3rd Jan 20201:11 pmRNSHolding(s) in Company
3rd Jan 202012:37 pmRNSHolding(s) in Company
20th Dec 20193:59 pmRNSHolding(s) in Company
17th Dec 20197:00 amRNSStmnt re Share Price Movement
20th Nov 20197:00 amRNSCompletion of Angostura Acquisition
14th Nov 20197:00 amRNSExpiry of Decree 566 - oil prices return to normal
1st Nov 20197:00 amRNSGroup Update
21st Oct 20197:00 amRNSAcquisition and Subscription
30th Sep 20197:00 amRNSUnaudited Interim Results and Group outlook
17th Sep 20197:00 amRNSPublication of half year unaudited accounts
2nd Sep 201911:12 amRNSFurther update on Argentina
28th Aug 20197:00 amRNSFurther Update on Argentina
13th Aug 20191:26 pmRNSCompany Update
6th Aug 20197:00 amRNSH1 Group Management Reporting & Operational Update
25th Jul 20197:00 amRNSNew Offtake Arrangements
16th Jul 20197:00 amRNSArgentina update
27th Jun 20191:22 pmRNSResult of AGM
27th Jun 20197:00 amRNSAGM Statement
31st May 20197:00 amRNSPosting of Annual Report and Notice of AGM
23rd May 20197:00 amRNSFY Results for year ended 31 Dec 2018 & Q1 update
7th May 20197:00 amRNSNotice of 2018 Annual Results and Q1 update
29th Apr 201911:05 amRNSSecond Price Monitoring Extn
29th Apr 201911:00 amRNSPrice Monitoring Extension
25th Mar 20197:00 amRNSAppointment of Joint Broker
25th Mar 20197:00 amRNS2019/20 Work Programme
14th Mar 20194:14 pmRNSHolding(s) in Company
14th Mar 201911:37 amRNSResult of General Meeting
13th Mar 20198:44 amRNSPDMR / Director Shareholding
11th Mar 20194:15 pmRNSResult of Offer for Subscription & Loan Conversion
25th Feb 20197:00 amRNSOffer for Subscription for up to £6.5 million
15th Feb 20197:00 amRNSNew independently certified reserves report
4th Feb 201912:52 pmRNSHolding(s) in Company
31st Jan 20197:00 amRNS2018 unaudited Group Management Report Highlights
10th Jan 20192:39 pmRNSHolding(s) in Company
9th Jan 20197:00 amRNSNet Group year-end production target beaten
20th Dec 20187:00 amRNSNew Concessions Update Rio Negro, Argentina
18th Dec 20187:00 amRNSDrilling success at Puesto Flores, Argentina
7th Dec 20187:00 amRNSUpdate from Rio Negro Province, Argentina
6th Dec 20187:00 amRNSAppointment of Joint Broker
3rd Dec 20187:00 amRNSCompany Presentation
28th Nov 20187:00 amRNSAcquisition: Las Bases & Puesto Prado Concessions
27th Nov 20187:00 amRNSDrilling update
22nd Nov 20187:00 amRNSArgentina Update
13th Nov 20187:26 amRNSArgentina Update
29th Oct 20187:00 amRNSQ3 2018 unaudited Group Management Report
26th Oct 20187:00 amRNSDrilling update at Puesto Flores field, Argentina

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.