SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Operational Update

8 Jan 2014 07:00

RNS Number : 1332X
President Energy PLC
08 January 2014
Β 

ο»Ώ

8 January 2014

PRESIDENT ENERGY PLC

("President" or "the Company")

OPERATIONAL UPDATE

Β 

PARAGUAY RIG PROCURED - DRILLING PREPARATIONS ON TRACK

Β 

President Energy is pleased to provide an operational update on the Company's assets.

Β 

Highlights

Β 

Paraguay

Β 

Β· Rig procured for 2014 exploration programme

Β 

Β· Preparations for drilling campaign on track

Β 

Β· Weather permitting, first well scheduled to spud during May 2014

Β 

Β· Seismic results continue to support previous expectations, updated audit report now scheduled by end this month

Β 

Argentina

Β 

Β· Argentina frac programme completed with proven success. Realised oil prices increased by 13% over last year to US$ 76/bbl

Β 

Louisiana

Β 

Β· Louisiana production remains strong, with oil prices stable at US$ 109/bbl

Β 

Β 

PARAGUAY

Β 

Rig Procured

Β 

A letter of intent has now been entered into for a rig to drill the 2014 exploration programme. The contractor is Queiroz GalvΓ£o Γ“leo e GΓ‘s, one of the largest drilling contractors and production services providers in Brazil. The Top Drive Rig is capable of drilling down to depths of 5000 metres which is adequate to explore the deeper Paleozoic play identified in President's seismic survey. Mobilisation from Brazil is due to commence during February 2014 and is estimated to take two months, with the first well scheduled to spud, weather permitting, during May 2014.

Β 

Drilling Preparations

Β 

Preparations for drilling continue and are on track. Schlumberger experts are now in country supporting President's growing team. Civil works at two well locations are advanced with drilling pads being prepared.

Β 

Seismic Survey

Β 

The results of the extensive seismic programme are still being analysed. Due to the increased amount of seismic data acquired, the final results are now expected during the course of January. The information to date supports the management's previously announced views of the two major structural play fairways identified and the gross risked prospective resource potential of in excess of 500 mmboe as a realistic possibility. An updated independent audit by RPS is also expected to be announced by the end of January.

ARGENTINA

Β 

Summary of Well Stimulations Results at Puesto Guardian (PPC 50% Working Interest):

Β 

As a result of the frac campaign (excluding PE-8) gross field production has stabilised at 415bopd, an increase of 40%. With the well performance data now observed, management is confident that the frac campaign has proved successful and sufficient production data are now available to commence a reserves update. Whilst technical problems have hindered PE-8, this does not detract from the successful proof of concept of commercial, hydraulic stimulation in Puesto Guardian.

Β 

PE-7

After four months of production, the well continues to perform strongly and is free flowing without further decline into the facility on a 45/64 inch choke with an average month four rate of 185 gross barrels of fluid per day, with 73% oil.Β 

Β 

DP-1001

After seven months of production, the well continues to free flow without further decline into the facility on a 9/16 inch choke with an average month seven rate of 110 gross barrels of fluid per day, with 66% oil.

Β 

PE-8

After hydraulic stimulation of the carbonate interval, an inflow test was commenced with a W1 of approximately 340 gross barrels of fluid per day and after three days of clean-up reached 15% oil. A workover was carried out to open the A6 interval and install a beam pump. Production re-commenced at 200 gross barrels of fluid per day (10% oil) on 11th November, however the pump performance continued to drop off over three weeks before failing. This is most likely due to seal damage from some low level of sand production. The well is currently shut-in awaiting a pulling operation to change the pump seals.

Β 

Current realised oil prices have increased to US$76/bbl representing an increase of some 13% from the levels of US$65/bbl achieved a year ago.

Β 

Β 

LOUISIANA

Β 

Production remains strong. While December volumes will be lower due to routine field maintenance at both EWL and ELV, as well as cold weather, average monthly production has been approximately 250 boepd for the past 3 months. Oil prices remain firm at US$109 per barrel. In H1 2014, President and its partners intend to drill two new exploration wells.Β 

Β 

Peter Levine, Chairman, President Energy commented:

"The focus for 2014 is most certainly Paraguay and we are on track operationally. The retention of a leading South American drilling company complements the recruitment of Schlumberger as Integrated Project Manager and completes what we consider to be a world class team for our 2014 drilling campaign."

Β 

Β 

Miles Biggins, Bsc Joint Honours University College London, with 22 years of experience in the oil and gas sector, is a Petroleum Engineer and member of the Society of Petroleum Engineers who meets the criteria of qualified persons under the AIM guidance note for mining and oil and gas companies, has reviewed and approved the technical information contained in this announcement.

Β 

Contact:

President Energy PLC

John Hamilton, CEO +44 (0) 207 016 7950

Ben Wilkinson, Finance Director +44 (0) 207 016 7950

Β RBC Capital Markets

Jeremy Low, Matthew Coakes, Daniel Conti +44 (0) 207 653 4000

Canaccord Genuity Limited

Tim Redfern, Henry Fitzgerald-O'Connor +44 (0) 207 523 8000Β 

Bell Pottinger +44 (0) 207 861 3232

Gavin Davis, Henry Lerwill

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
MSCUGUWPGUPCPGM
Date   Source Headline
6th Oct 20217:00 amRNSLoan Conversion
30th Sep 20217:00 amRNSUnaudited Interim Results and Current trading
23rd Sep 202112:00 pmRNSResults of AGM
22nd Sep 20217:00 amRNSDrilling and Workover Update
3rd Sep 20217:00 amRNSParaguay Farm-Out Update
31st Aug 20217:00 amRNSPosting of Annual Report and Notice of AGM
24th Aug 20217:00 amRNSAudited Results for year ended 31 December 2020
4th Aug 20217:00 amRNSOperations Update
28th Jul 20217:00 amRNSCGC Share Subscription
13th Jul 20217:00 amRNSOperations Update
9th Jul 20217:08 amRNSAtome - Company Acquisition
1st Jul 20217:00 amRNSAtome - Corporate Update
10th Jun 20217:00 amRNSExtension to Publication of Accounts
8th Jun 20217:00 amRNSParaguay Farm-Out Agreement Signed
26th May 20217:00 amRNSOperations and Corporate Update
12th May 20217:00 amRNSSecondary Recovery Project
10th May 20217:00 amRNSOperations and Prices Update
7th May 20214:41 pmRNSSecond Price Monitoring Extn
7th May 20214:35 pmRNSPrice Monitoring Extension
30th Apr 20217:45 amRNSOperations Update
28th Apr 20217:00 amRNSOperations Update
27th Apr 20217:00 amRNSCGC Share Subscription
21st Apr 20217:00 amRNSOperations Update
16th Apr 20214:41 pmRNSSecond Price Monitoring Extn
16th Apr 20214:35 pmRNSPrice Monitoring Extension
16th Apr 20217:00 amRNSDrilling Update
14th Apr 202111:05 amRNSSecond Price Monitoring Extn
14th Apr 202111:00 amRNSPrice Monitoring Extension
12th Apr 20217:00 amRNSDrilling Update
7th Apr 20217:00 amRNSTermination of Joint Corporate Broker
31st Mar 20217:00 amRNSDrilling Update
9th Mar 20217:00 amRNSDrilling Update
22nd Feb 202111:06 amRNSSecond Price Monitoring Extn
22nd Feb 202111:00 amRNSPrice Monitoring Extension
22nd Feb 20217:00 amRNSTrading Update and Investor Presentation
19th Feb 20214:41 pmRNSSecond Price Monitoring Extn
19th Feb 20214:36 pmRNSPrice Monitoring Extension
15th Feb 20214:41 pmRNSSecond Price Monitoring Extn
15th Feb 20214:36 pmRNSPrice Monitoring Extension
8th Feb 20217:00 amRNSNotice of Trading Update
8th Feb 20217:00 amRNSGroup Reserves Update
3rd Feb 20217:00 amRNSOperational Update
26th Jan 20217:00 amRNSCGC Share Subscription
20th Jan 20217:00 amRNSH1 2021 Drilling Update
15th Jan 202111:00 amRNSPrice Monitoring Extension
22nd Dec 20207:00 amRNSOperational Update
7th Dec 20207:00 amRNSOperation and Production Update
26th Nov 20207:00 amRNSDrilling Update
20th Nov 20207:00 amRNSGrant of Share Options
16th Nov 20207:00 amRNSDrilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.