SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Operational Update

29 Sep 2016 07:00

RNS Number : 1722L
President Energy PLC
29 September 2016
 

29 September 2016

PRESIDENT ENERGY PLC

("President Energy" or "the Company")

Operational Update

 

President Energy (AIM: PPC), the oil and gas exploration company provides the following update on its Argentine and Louisiana operations.

 

Well DP 1002 S/T, Dos Puntitas Field, Puesto Guardian Concession, Salta, Argentina.

The well remains on target to reach full production around the end of the first half of October, subject, as stated in the previous RNS of 2 September 2016, to successful operational execution.

Whilst, further to that announcement, certain cementing issues were encountered causing further delay, subsequent drilling has proceeded satisfactorily. President Energy has now successfully intercepted the target Yacoraite producing formation at a measured depth of 3740m and an inclination of 84°, at which point, notwithstanding the heavy oil based drilling mud being used of 11 lbm/gal*, the expected increase in C1-C5** hydrocarbon gas readings were seen through the mud logs. The well was then drilled down to the casing point of 3756m measured depth with the continued presence of these elevated hydrocarbon gases. The hole is now being prepared for running casing down to the Yacoraite whereupon the production horizontal leg will be drilled at or around horizontal and, subject to all being in accordance to plan, the well completed.

Production in Puesto Guardian Concession, Argentina

Daily production for the first 25 days of September is averaging approximately 500 bopd.

Further to the Company's previous RNS on 2 September 2016, a Halliburton Coiled Tubing Unit ("CTU") has been contracted and is ready to be mobilised to the Puesto Guardian fields awaiting a final regulatory permission for road transport, anticipated to be obtained this week. The CTU is due to start work shortly and will be combined with a stimulation programme on four non-producing wells. Management estimates that the CTU work on those wells will yield an increase in total field production in the region of 20%.

 

Production from Louisiana assets

The A55 well, one of the two wells referred to in the Company's previous RNS, has now come on stream. The Company is waiting for the non-operated Triche well, previously producing 60-70 boepd net to President Energy, to come back on stream, after being out of effective working commission for approximately six months due to pipeline issues.

The Company expects the Triche well to come back on-stream in about 14 days, at which point, the Company should see its share of total net production in Louisiana increase to the 200-250 boepd levels projected in the previous RNS.

 

Peter Levine, Chairman, Commented

"In the face of unforeseen issues we are nevertheless pleased with the achievement so far in the well DP 1002 S/T. We are on trajectory and have intercepted the target Yacoraite producing formation on or about geological prognosis with the expected increase in hydrocarbon gases."

"The mission is now to case the well to the producing formation, then drill the horizontal leg and complete successfully.

"Elsewhere, we continue to target incremental gains on production where they can be cost effectively achieved."

*pounds weight per gallon

**C1-C5 hydrocarbon gases are respectively methane, ethane, propane, butane and pentane

This announcement is inside information for the porpoises of article 7 of Regulation 596/2014

 

Miles Biggins, Bsc Joint Honours University College London, with 25 years of experience in the oil and gas sector, is a Petroleum Engineer and member of the Society of Petroleum Engineers who meets the criteria of qualified persons under the AIM guidance note for mining and oil and gas companies, has reviewed and approved the technical information contained in this announcement.

 

 

Contact:

 

President Energy PLC

Peter Levine, Chairman

Miles Biggins, COO

 

 

+44 (0) 207 016 7950

+44 (0) 207 016 7950

 

 

Peel Hunt LLP (Nominated Advisor & Joint Broker)

Richard Crichton, Ross Allister

 

 

+44 (0) 207 418 8900

 

BMO Capital Markets

Neil Haycock, Tom Rider

and Jeremy Low

 

+44 (0) 207 236 1010

 

 

Vigo Communications

Chris McMahon

Patrick d'Ancona

+44 (0)20 7830 9700

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGUCGBUPQUAB
Date   Source Headline
20th Mar 20097:00 amRNSOperations Update
16th Feb 200912:41 pmRNSMichigan road restrictions
30th Jan 20097:00 amRNSTrading Update
22nd Dec 20087:00 amRNSOperational Update
12th Nov 20087:00 amRNSOperations Update
3rd Nov 200812:03 pmRNSHolding(s) in Company
23rd Oct 20085:14 pmRNSResult of EGM
23rd Oct 20087:00 amRNS3D Seismic Contract Signed for Australian Licence
21st Oct 20087:00 amRNSProduction and Reserves Update
25th Sep 20087:00 amRNSShare Consolidation
25th Sep 20087:00 amRNSInterim Results
8th Sep 20087:00 amRNSOperations Update
11th Aug 20083:28 pmRNSNotice of Results
5th Aug 20087:00 amRNSOperations Update
15th Jul 200812:52 pmRNSDirector/PDMR Shareholding
10th Jul 200811:16 amRNSUpdate on Shareholder Registe
4th Jul 20087:00 amRNSProduction Update
1st Jul 20082:50 pmRNSCompletion of Acquisition
23rd Jun 20084:54 pmRNSNotification of Interest
20th Jun 20083:12 pmRNSNotification of Interest
19th Jun 20089:10 amRNSAIM Censure
19th Jun 20089:00 amRNSAIM Disciplinary Notice
16th Jun 20083:42 pmRNSDirector/PDMR Shareholding
13th Jun 20084:17 pmRNSGrant of Options
12th Jun 20083:10 pmRNSHolding(s) in Company
12th Jun 20087:00 amRNSAcquisition and Debt Facility
12th Jun 20087:00 amRNSOperations Update
11th Jun 20084:17 pmRNSHolding(s) in Company
5th Jun 20087:00 amRNSRe. Share Register
29th May 200812:39 pmRNSUpdate on Australian Licences
29th May 20087:00 amRNSIncreased allowable productio
20th May 20082:12 pmRNSNotification of interest
19th May 20082:06 pmRNSAnnual Report and Accounts
14th May 20086:30 pmRNSNotification of Interest
13th May 20089:08 amRNSNew daily production record a
6th May 200810:38 amRNSProduction Update
23rd Apr 20083:01 pmRNSOperations Update
17th Apr 20086:06 pmRNSNotification of Interest
17th Apr 20086:02 pmRNSNotification of Interest
16th Apr 20087:00 amRNSPreliminary Results
11th Apr 20083:57 pmRNSNotification of Interest
26th Mar 20088:46 amRNSEPT - Meridian Petroleum
25th Mar 20081:08 pmRNSUpdate on Offer & Operations
25th Mar 200810:42 amRNSEPT - Meridan Petroleum
20th Mar 20088:40 amRNSEPT - Meridian Petroleum
19th Mar 20089:34 amRNSEPT - Meridian Petroleum
18th Mar 20088:56 amRNSEPT - Meridian Petroleum
14th Mar 200810:43 amRNSEPT - Meridian Petroleum PLC
12th Mar 20082:35 pmRNSHolding(s) in Company
10th Mar 200811:56 amRNSEPT - Meridian Petroleum

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.