SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Drilling Update

27 Oct 2020 07:00

RNS Number : 2583D
President Energy PLC
27 October 2020
 

 

 

27 October 2020

 

PRESIDENT ENERGY PLC

("President" or the "Company")

 

 Drilling Update

President Energy (AIM: PPC), the energy company with a diverse portfolio of production and exploration assets, provides an update in relation to the drilling of the exploration well EVN-x1 near the Estancia Vieja field, Rio Negro Province, Argentina.

 

Key points

• Well successfully drilled to target depth of 2,000 metres and cased on time and budget

• Both full suite electric logs and mud logs show clear moveable live gas and oil pay with good pressure, porosity and permeability

• The results so far support pre-drill P50 projections, subject to testing in due course

• Drilling rig is demobilising and the well will be completed and tested before the end of the year by the workover rig

 

Drilling Programme

 

The exploration well EVN-x1 has been successfully drilled to its target depth of 2,000 metres and cased on time and on budget.

 

Before casing, a full suite of electric logs were run as well as pressure testing to supplement the mud logs obtained during the drilling process.

 

The electric logs confirmed the evidence shown by mud logs of net pay of a total of 10 metres (33 feet) of clear live moveable hydrocarbon pay in two clean sand intervals both with good pressure, permeability and porosity (latter in excess of 20%). Of this some 7 metres (23 feet) is considered oil and the balance gas.

 

These results provide support for the pre-drill projections of production of 60,000 m3/d (353 boepd) of gas and 188 bopd which can only be verified on testing due to the fact that this is a previously undrilled structure with no direct analogue as to production performance. Accordingly, until successful testing, it is too early to come to any conclusions as to actual producibility and size of the respective reservoirs for gas and oil. Testing will be made of each individual interval which will not be co-mingled.

 

The drilling rig is now beginning to demobilise back to its base and the workover rig will be brought in to complete and test the well. This is expected to be before the end of the year as the rig is committed to work in President's Puesto Flores field to repair two producing wells and then to go to the Las Bases field to perform one or two workovers on shut in wells generated by the success of the Las Bases 1001 well drilled last month.

 

 

Peter Levine, Chairman commented

 

"It is always good to see clear evidence of moveable live gas and oil in an exploration well being drilled in a new structure.

 

"However, it is precisely because of that and the lack of analogue evidence that one must prudently reserve judgement and be cautious until the well is tested within the next two months once the workover rig finishes other pre-planned work in our fields.

 

"In the meantime, as previously announced, we are looking to materially increase our gas production around the end November bringing on line two/three new contributors, also putting back on line certain oil wells in Rio Negro which have been out of commission for several months requiring repair".

 

 

Dr Martin Gee, PhD in Geophysics (Oxon), BSc (First Class hons) in Earth Sciences (Cardiff) who meets the criteria for qualified persons under the AIM guidance note for mining and gas companies, has reviewed and approved the technical information contained in this announcement

 

 

 

Glossary:

Bopd means barrels of oil per day

Boepd means barrels of oil equivalent (oil and gas) per day

EV means the Estancia Vieja field in the Puesto Flores/Estancia Vieja Concession, Rio Negro, Argentina

LB means the Las Bases Concession, Rio Negro , Argentina

M3/d means cubic metres of production of gas or oil as the case may be

P50 means internal mid-case estimate

 

 

 

 

 

 Contact:

President Energy PLC

Rob Shepherd, Group FD

Nikita Levine, Investor Relations

 

 

 

+44 (0) 207 016 7950

 

finnCap (Nominated Advisor)

Christopher Raggett, Charlie Beeson

 

+44 (0) 207 220 0500

 

Shore Capital (Corporate Broker)

Jerry Keen, Antonio Bossi

 

 

+44 (0) 207 408 4090

Tavistock (Financial PR)

Nick Elwes, Simon Hudson

 

+44 (0) 207 920 3150

 

 

Notes to Editors

 

President Energy is an oil and gas company listed on the AIM market of the London Stock Exchange (PPC.L) primarily focused in Argentina, with a diverse portfolio of operated onshore producing and exploration assets.

 

The Company has operated interests in the Puesto Flores, Estancia Vieja, Puesto Prado and Las Bases Concessions, and Angostura exploration contract, all of which are situated in the Rio Negro Province in the Neuquén Basin of Argentina and in the Puesto Guardian Concession, in the Noroeste Basin in NW Argentina. Alongside this, President Energy has cash generative production assets in Louisiana, USA and further significant exploration and development opportunities through its acreage in Paraguay and Argentina.

 

The Group is also actively pursuing value accretive acquisitions of high-quality production and development assets in Argentina capable of delivering positive cash flows and shareholder returns. With a strong institutional base of support, including the IFC, part of the World Bank Group as well as the international commodity trader and logistics company Trafigura, an in-country management team as well as a Board whose interests are aligned to those of its shareholders, President Energy gives UK investors access to the Argentina energy growth story combined with world class standards of corporate governance, environmental and social responsibility.

This announcement contains inside information for the purposes of article 7 of Regulation 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLBCBDGCGDDGGL
Date   Source Headline
18th Oct 20077:01 amRNSChanges to Board Structure
17th Oct 20071:28 pmRNSOrion 36 Update
25th Sep 200710:06 amRNSUpdate on Orion
17th Sep 20074:11 pmRNSDirectors Dealings
12th Sep 20077:01 amRNSGrant of Options
11th Sep 20078:00 amRNSOrion Well Resumes Production
6th Sep 20077:01 amRNSInterim Results
3rd Sep 200711:28 amRNSOrion Production Update
24th Aug 20077:03 amRNSProduction
17th Aug 200712:47 pmRNSAIM Rule 26 Compliance
16th Aug 20077:00 amRNSProduction commences at Orion
2nd Aug 200711:55 amRNSAGM Statement and Update
26th Jul 20073:20 pmRNSProduction at Calvin 36-1
19th Jul 20072:15 pmRNSExercise of options
18th Jul 20073:59 pmRNSDirectorate Change
5th Jul 20078:30 amRNSExercise of Options
29th Jun 20073:43 pmRNSAnnual Report and Accounts
28th Jun 20073:38 pmRNSDirector/PDMR Shareholding
28th Jun 20071:03 pmRNSGrant of Options
27th Jun 20071:56 pmRNSDirector/PDMR Shareholding
26th Jun 20077:10 amRNSPreliminary results
26th Jun 20077:02 amRNSRestatement for IFRS
21st Jun 20074:17 pmRNSHolding(s) in Company
8th Jun 20077:01 amRNSPlacing of New Shares
5th Jun 20074:07 pmRNSChange of Address
14th May 20077:01 amRNSCalvin Field update
30th Apr 20077:03 amRNSOperations Update
18th Apr 20074:44 pmRNSAus Native Title Agreed
4th Apr 20077:01 amRNSDirectorate Change
16th Mar 20077:01 amRNSOperations Update
27th Feb 20077:02 amRNSOrion Well Update
23rd Feb 20076:05 pmRNSExercise of Options
23rd Feb 20075:36 pmRNSExercise of Options
22nd Feb 20077:01 amRNSUS Operational Update
6th Feb 200711:54 amRNSDrilling Results
1st Feb 20074:55 pmRNSChange of Address
24th Jan 20075:23 pmRNSExercise of Options
22nd Jan 20074:53 pmRNSOperations Update-REPLACEMENT
22nd Jan 20077:02 amRNSOperations update
20th Dec 200610:49 amRNSTotal Voting Rights
19th Dec 20062:48 pmRNSPlacing of new shares
8th Dec 20065:35 pmRNSStatement re price movement
15th Nov 20067:02 amRNSCalvin Field Update
9th Nov 20067:01 amRNSJV signed with Ensight
7th Nov 200610:37 amRNSNative Title Agreement
27th Oct 20067:01 amRNSDirector appointment
18th Oct 20069:00 amRNSCFO Appointment
11th Oct 20064:51 pmRNSStatement re price movement
8th Sep 20067:01 amRNSInterim Results
1st Aug 20063:12 pmRNSActivity Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.