Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPower Metal Regulatory News (POW)

Share Price Information for Power Metal (POW)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 12.50
Bid: 12.00
Ask: 13.00
Change: 0.00 (0.00%)
Spread: 1.00 (8.333%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 12.50
POW Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Molopo Farms Complex Project – Drill Target K1-6

16 Aug 2022 07:00

RNS Number : 0859W
Power Metal Resources PLC
16 August 2022
 

16 August 2022

Power Metal Resources plc

("Power Metal" or the "Company")

Molopo Farms Complex Project - Drill Target K1-6

Power Metal Resources plc (LON:POW), the London listed exploration company seeking large-scale metal discoveries across its global project portfolio announces an update in relation to the Molopo Farms Complex Project ("Molopo Farms" or the "Project") targeting a large scale nickel-copper-platinum group element ("PGE") discovery in southwestern Botswana.

 

KEY HIGHLIGHTS:

 

§ Two ground-based electromagnetic ("EM") geophysics surveys now complete, covering areas hosting 2020/2021 diamond drillholes KKME 1-14 ("K1-14") and KKME 1-6 ("K1-6").

 

§ Preliminary survey results have highlighted a large shallow dipping magnetic conductor at drillhole K1-6.

 

§ Plotting of drillhole K1-6 shows that the drillhole penetrated the edge of the newly identified magnetic conductor at a similar stratigraphic level to nickel-sulphide mineralisation averaging 7.0m @ 0.443% Ni from 445m, including 0.6m @ 1.69% Ni, 0.55g/t Pt & 0.14g/t Au from 446.7m downhole.1 This is within a broader mineralised interval from 294.7m (when pentlandite was first logged - assay result of 6606ppm Ni from 294.7 - 295.28m) to the end of the hole at 597.8m (minor sulphides logged - assay result 2852ppm Ni from 597.0 - 597.8m).

 

§ Planned 2022 diamond drill programme start date now being brought forward. The upcoming programme will now focus on testing the central and stronger part of this magnetic conductor. At present the plan is to drill 6 drillholes for approximately 2600m during this upcoming programme.

 

A map highlighting a location plan map of the Project (Fig.1) as well as a zoomed out (Fig. 2) and zoomed in (Fig. 3) cross-section of the MLEM results over target area K1-6 can be found at the link below:

https://www.powermetalresources.com/molopo-farms-complex-rns/

Paul Johnson, Chief Executive Officer of Power Metal Resources commented:

"Today's exploration news is, in my view, potentially one of the more significant the Company has released in its 3-year history as Power Metal.

We have confirmed that drillhole K1-6 at Molopo Farms, drilled during the 2020/2021 programme, intersected the edge of a very large-scale and strong magnetic conductor. Significantly, drillhole K1-6 highlighted that the edge of the magnetic conductor was mineralised, with widespread nickel sulphides demonstrated from assay testing and follow up petrological analysis.

As a result of the findings, multiple drillholes planned for the 2022 programme will target the centre of the magnetic conductor where we believe there is the potential for a more strongly mineralised system where the conductive response is considerably stronger and larger.

The EM survey over K1-6 captured 800m of magnetic conductor length where it remains open at depth. The magnetic conductor is also shallow dipping and expands in magnitude and size at depth based on the preliminary processed survey images we hold at present.

As a result we believe we have a compelling reason to accelerate drilling at Molopo Farms and are working in order to achieve that.

In the link above to our website you will see the survey images, with explanatory information, for review. The further information below explains the findings in more detail and also gives additional information in regards to an additional strong magnetic conductor identified below target 1-14, which was not tested by the 2020/2021 drillhole in that area.

This is an exciting time for the Power Metal team and we are now pushing ahead at pace."

GEOPHYSICAL SURVEY - OVERVIEW

 

§ Spectral Geophysics have completed the 2022 Phase I exploration programme which included two moving loop electromagnetic ("MLEM") geophysics surveys over targets 1-6 and 1-14. The MLEM survey results will assist the company in further refining drill collar locations prior to the planned 2022 diamond drilling campaign.

 

§ Preliminary MLEM survey results over the I-6 target suggest that the 2021 drillhole (K1-6) targeting this zone clipped this sizeable shallow-dipping (south) magnetic conductor. The magnetic conductor appears to be increasing in magnitude with depth where it remains completely untested by drilling.

 

§ Preliminary MLEM results over the 1-14 target suggest the presence of a strong magnetic conductor located directly south of the 2021 drillhole (K1-14) that targeted this zone. While there are conductive Transvaal carbonaceous mudstones in the area of the survey, the centre of this anomaly is strongly coincident with a magnetic high caused by the ultramafic rocks in the area - suggesting that the magnetic conductor detected by this survey may be located within the ultramafic intrusive rocks. 

 

§ A Botswana based drilling contractor has been selected for the upcoming planned diamond drilling programme at Molopo Farms and a site visit with the drilling company's foreman and Power's in-country geological consultant is planned for later this week. 

 

FURTHER INFORMATION

Spectral Geophysics has now completed MLEM surveys over targets 1-14 and 1-6 located within prospecting licence area PL311/2016. Preliminary results have been made available to the Company, with finals results expected within the coming weeks.

 

The rationale for these surveys was as follows:

Target 1-6: Previous 2020/2021 drill programme results returned nickel (sulphide) values of up to 1.69% Ni with 0.55g/t Pt and 0.14g/t Au, within a composite intersection of 7.0m @ 0.44% Ni from 445 to 452.0m in K-1-6, hosted by layered ultramafic rocks of the Molopo Farms Complex .1,2

The preliminary results from the recently completed MLEM survey have allowed for significantly enhanced resolution of the original EM anomaly that was targeted by drilling in 2021.

Specifically, the results now indicate that drillhole K1-6 intersected the edge of the large shallow-dipping magnetic conductor in the area, which also appears to be increasing in size and magnitude with depth where it remains completed untested by drilling.

The 2022 drilling programme will test this intriguing target.

Target 1-14: Defined by a broad strong EM anomaly which was targeted by a single drillhole during the 2020/2021 drill programme.2 The drillhole (1-14) intersected carbonaceous mudstones at depth which, although highly conductive, were determined to be flat lying and therefore did not explain the magnetic conductor which was indicative of a shallower, steeply dipping body. 3

The preliminary results from the 2022 MLEM survey over this target have identified a magnetic conductor that is coincident with a magnetic high associated with ultramafic rocks in the area.

The results therefore suggest that the magnetic conductor may be located within the ultramafic intrusive rocks in the area, making it a highly viable drill target for the 2022 drilling campaign.

 

PROJECT BACKGROUND AND OWNERSHIP

 

Power Metal currently has a current circa 53% effective economic interest in Molopo, held through a direct project interest and a shareholding in partner Kalahari Key. On 18 May 2022 Power Metal announced a conditional transaction that would see its interest in Molopo increasing to 87.71% (the "Transaction"). The announcement may be viewed through the following link:

 

https://www.londonstockexchange.com/news-article/POW/kalahari-key-botswana-acquisition/15458701

 

As part of the Transaction, Power Metal will become the Project operator and in advance of completion the Company is working with the team at KKME to maintain momentum with regard to Project exploration.

 

Work streams are also in process to secure Botswana regulatory approvals enabling the Transaction to complete.

 

References:

 

1 Source: Company announcement: 24 September 2021

( https://polaris.brighterir.com/public/power_metal_resources/news/rns/story/x4919kw )

 

Diamond Drill Hole KKME 1-6 Assay Data - reported 24 September 2021 - with 7.0m composite

Drill Hole ID

From (m)

To (m)

Interval (m)

Ni (ppm)

Au (g/t)

Pt (g/t)

1-6

445.0

446.0

1.0

2663

1-6

446.0

446.7

0.7

3012

1-6

446.7

447.3

0.6

16961

0.14

0.55

1-6

447.3

448.0

0.7

6948

0.11

1-6

448.0

449.0

1.0

3056

0.06

1-6

449.0

450.0

1.0

3187

1-6

450.0

451.0

1.0

2504

1-6

451.0

452.0

1.0

2474

Weighted average Ni intersection

7.0

4,433

* All depths and intervals are as measured downhole.

 

 

2 Source: Company announcement: 21 July 2021

( https://polaris.brighterir.com/public/power_metal_resources/news/rns/story/rng8onx )

 

3 Source: Company announcement: 16 November 2020

( https://polaris.brighterir.com/public/power_metal_resources/news/rns/story/w11ge3w  )

 

 

COMPETENT PERSON STATEMENT

 

The technical information contained in this disclosure has been read and approved by Mr Nick O'Reilly (MSc, DIC, MIMMM, MAusIMM, FGS), who is a qualified geologist and acts as the Competent Person under the AIM Rules - Note for Mining and Oil & Gas Companies. Mr O'Reilly is a Principal consultant working for Mining Analyst Consulting Ltd which has been retained by Power Metal Resources PLC to provide technical support.

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ("MAR"), and is disclosed in accordance with the Company's obligations under Article 17 of MAR.

For further information please visit https://www.powermetalresources.com/ or contact:

Power Metal Resources plc

Paul Johnson (Chief Executive Officer)

+44 (0) 7766 465 617

SP Angel Corporate Finance (Nomad and Joint Broker)

Ewan Leggat/Charlie Bouverat

+44 (0) 20 3470 0470

SI Capital Limited (Joint Broker)

Nick Emerson

+44 (0) 1483 413 500

First Equity Limited (Joint Broker)

David Cockbill/Jason Robertson

+44 (0) 20 7330 1883

 

NOTES TO EDITORS

Power Metal Resources plc - Background

Power Metal Resources plc (LON:POW) is an AIM listed metals exploration company which finances and manages global resource projects and is seeking large scale metal discoveries.

The Company has a principal focus on opportunities offering district scale potential across a global portfolio including precious, base and strategic metal exploration in North America, Africa and Australia.

Project interests range from early-stage greenfield exploration to later-stage prospects currently subject to drill programmes.

Power Metal will develop projects internally or through strategic joint ventures until a project becomes ready for disposal through outright sale or separate listing on a recognised stock exchange thereby crystallising the value generated from our internal exploration and development work.

Value generated through disposals will be deployed internally to drive the Company's growth or may be returned to shareholders through share buy backs, dividends or in-specie distributions of assets.

Exploration Work Overview

Power Metal has internal exploration programmes completed or underway, with results awaited, as outlined in the table below.

Project

Location

Current

POW %

Work Completed or Underway

Results Awaited

Athabasca Uranium

Canada

100%

Ground exploration programme underway at 3 properties. Continuing data analysis across the property portfolio.

Results from ground exploration including spectrometer analysis, sampling and mapping.

Authier North Lithium

Canada

Earn-in to 100%

Property Evaluation Report completed.

Update covering exploration plans for target areas identified during the Evaluation.

Molopo Farms

Botswana

53%#

Geophysics programme complete.

Final preparations for launch of accelerated drill programme targeting very large scale magnetic conductor.

Tati Project

Botswana

100%

Sampling of mine dumps complete.

Review of mine dumps sampling, and processing potential. Launch of RC drill programme.

# subject to completion of acquisition announced 18.5.22 interest will increase to 87.71%

Exploration work programmes may also be underway within Power Metal investee companies and planned IPO vehicles where Power Metal has a material interest, the findings from which will be released on their respective websites, with simultaneous updates through Power Metal regulatory announcements where required. These interests are summarised in the table below:

Company

Status/Operations

Link

First Class Metals PLC

Investment - POW 28.19%

Exploration in the Schreiber-Hemlo region of Ontario, Canada

www.firstclassmetalsplc.com

 

First Development Resources Ltd

Planned IPO - POW 62.12%

Exploration in Western Australia and the Northern Territory of Australia

www.firstdevelopmentresources.com

 

Golden Metal Resources PLC

Planned IPO - POW 83.13%

Exploration and development in Nevada, USA

www.goldenmetalresources.com

 

Kavango Resources PLC

Investment - POW 14.03% (subject to completion of Kanye Resources disposal announced 8.7.22)

Exploration in Botswana

www.kavangoresources.com

 

New Ballarat Gold PLC

Planned IPO - POW 49.9%

Exploration in the Victoria Goldfields of Australia

A new website is currently in development which will be found at www.newballaratgoldcorp.com.

In the interim further information in respect of NBGC can be found at:

https://www.powermetalresources.com/project/victoria-goldfields/.

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDEAKPSFLAAEFA
Date   Source Headline
23rd Apr 20247:00 amRNSMolopo Farms Complex, Botswana – Drilling Update
10th Apr 20247:00 amRNSAdmission to trading on OTCQB Market
8th Apr 20244:30 pmRNSHolding(s) in Company
28th Mar 20244:30 pmRNSTotal Voting Rights
26th Mar 202412:00 pmRNSResult of General Meeting
26th Mar 202411:51 amRNSResults of Annual General Meeting
26th Mar 20247:00 amRNSBinding Earn-in Agreement Signed with RIWAQ
25th Mar 20247:00 amRNSUranium Energy Exploration Update
13th Mar 20247:00 amRNSDisposal of Victoria Goldfields JV Interest
12th Mar 20247:00 amRNSPower Arabia Limited (“Power Arabia”) Update
1st Mar 20247:00 amRNSShare Consolidation and Notice of General Meeting
29th Feb 20244:30 pmRNSTotal Voting Rights
29th Feb 202412:44 pmRNSAcquisition of 75% Interest in GSA (Environmental)
21st Feb 20247:00 amRNSAudited Financial Results
15th Feb 20247:00 amRNSAthabasca Basin, Strategic Uranium Property Staked
9th Feb 20246:24 pmRNSHolding(s) in Company
7th Feb 20242:08 pmRNSMolopo Farms Complex – Drilling Commences
6th Feb 20247:00 amRNSTati Project - Sampling Confirms Extensive Gold
1st Feb 20247:00 amRNSStrategic Financing Raising £1.3 million
31st Jan 20247:00 amRNSMolopo Farms Complex, Botswana – Drilling Update
30th Jan 20245:08 pmRNSHolding(s) in Company
16th Jan 20247:00 amRNSDirectorate Change
12th Jan 202410:36 amRNSReplacement: MoU Signed at Future Minerals Forum
12th Jan 202410:06 amRNSMoU Signed at Future Minerals Forum
9th Jan 20247:00 amRNSFuture Minerals Forum Attendance
18th Dec 20237:00 amRNSAthabasca – Additional Priority Uranium Targets
15th Dec 20239:50 amRNSRelease of Research Note
14th Dec 20237:00 amRNSMolopo Farms Complex, Botswana – Drilling Update
13th Dec 20239:45 amRNSUranium Energy Exploration Update
7th Dec 202310:24 amRNSFirst Development Resources Selta Project Update
6th Dec 20237:00 amRNSMolopo Farms Complex Botswana – Operational Update
20th Nov 20237:00 amRNSExploration Update – Significant Uranium Targets
10th Nov 20235:04 pmRNSHolding(s) in Company
6th Nov 20237:00 amRNSDisposal of Kavango Resources Shares for Cash
3rd Nov 20236:24 pmRNSHolding(s) in Company
31st Oct 20234:30 pmRNSTotal Voting Rights
31st Oct 20237:00 amRNSAttendance at New Orleans Investment Conference
25th Oct 20237:00 amRNSBusiness Update
11th Oct 20237:00 amRNSSignificant Uranium Targets Identified at Projects
6th Oct 20237:00 amRNSMolopo Farms Complex, Botswana, Exploration Update
5th Oct 202310:20 amRNSTati Gold Project – Gold Anomaly Exploration
3rd Oct 20236:11 pmRNSIssue of Equity
26th Sep 20232:23 pmRNSBadger Lake Uranium Project Update
20th Sep 20237:00 amRNSExpansion of Perch River Uranium Project
15th Sep 20237:00 amRNSTati Gold - Two Significant Anomalies Identified
8th Sep 20237:00 amRNSHelium Anomaly Discovered on Perch River
31st Aug 20237:00 amRNSExploration & Project Development Update
21st Aug 20231:13 pmRNSDirector Dealings
10th Aug 20237:00 amRNSIon Battery Resources-Lithium Exploration Underway
2nd Aug 20235:48 pmRNSIssue of new shares in lieu of fees

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.