We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPMO.L Regulatory News (PMO)

  • There is currently no data for PMO

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exploration and Development Drilling Update

31 Jul 2017 07:00

RNS Number : 5388M
Premier Oil PLC
31 July 2017
 

PREMIER OIL PLC

("Premier")

Exploration and Development Drilling Update

31 July 2017

 

Zama-1 exploration well

 

The Zama-1 exploration well offshore Mexico, has now completed drilling operations in the final hole section, reaching a total depth of 4,108 metres (13,478 feet). The logging results confirmed that the previous hole section had reached the base of the reservoir section, with an oil-down-to in the well of 3,380 metres (11,089 feet) with no subsequent penetration of an oil-water-contact. The well drilled deeper into the Zama Deep target and no additional hydrocarbons were encountered, confirming pre-drill expectations for this formation. 

 

Premier's estimate of the initial gross oil in-place volumes for the reservoir is, as previously announced, in excess of 1 billion barrels of oil. The gross oil bearing interval in Zama-1 is over 335 metres (1,100 feet). The well was completed on time and budget and has been suspended as a potential producer.

Premier, together with its joint venture partners Talos Energy (Operator) and Sierra Oil & Gas is now undertaking analysis of all the data gathered from the Zama-1 well and evaluating the best way to appraise and then develop this world class discovery.

Anoa development well (WL-5X)

 

In Indonesia, the Premier- operated Anoa development well (WL-5X) has been completed and the well will be brought on production in early August. The well achieved an equipment limited flow rate of 28mmscf/d, significantly higher than the 18mmscf/d rate achieved with the original well test, and estimated reserves for this well alone are approximately 75-100 Bcf. The outcome of the long-term production test from this well will help to prove up the production contribution from the deeper zones within the Anoa field.

Catcher development drilling

 

On the Premier-operated Catcher project the current well, a Burgman field injection well (B12) has been drilled and is currently being completed. This is the last of the twelve wells scheduled for completion pre-first oil. As with other wells in the programme, the well is currently ahead of time, under budget and with reservoir result ahead of prognosis. Ten of the twelve wells have been tied in, with the final two tie-ins scheduled ahead of first oil from the field. Once the current well is completed, the Catcher project will have delivered four wells on each of the Catcher, Varadero and Burgman fields ahead of schedule and the rig will then be moved back to Catcher at the end of August for the next batch of four production wells.

Enquiries

 

Premier Oil plc

Tel: 020 7730 1111

Tony Durrant, Chief Executive

 

Robin Allan, Director North Sea and Exploration

 

 

Bell Pottinger

Tel: 020 3772 2570

Lorna Cobbett

Henry Lerwill

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLWGUWAMUPMUAG
Date   Source Headline
11th Dec 20196:00 pmRNSHolding(s) in Company
3rd Dec 201911:00 amRNSDirector/PDMR Shareholding
2nd Dec 201911:00 amRNSTotal Voting Rights and Warrant Update
2nd Dec 20197:00 amRNSFirst Gas from BIG-P, Indonesia
22nd Nov 20195:30 pmRNSHolding(s) in Company
19th Nov 201911:00 amRNSHolding(s) in Company
14th Nov 201911:00 amRNSHolding(s) in Company
14th Nov 20197:00 amRNSTrading and Operations Update
11th Nov 201911:00 amRNSHolding(s) in Company
8th Nov 201911:00 amRNSHolding(s) in Company
7th Nov 20194:00 pmRNSHolding(s) in Company
4th Nov 20192:00 pmRNSDirector/PDMR Shareholding
1st Nov 201910:00 amRNSTotal Voting Rights and Warrant Update
28th Oct 20196:00 pmRNSHolding(s) in Company
25th Oct 20194:00 pmRNSHolding(s) in Company
25th Oct 201911:00 amRNSHolding(s) in Company
24th Oct 20194:00 pmRNSHolding(s) in Company
24th Oct 201910:05 amRNSHolding(s) in Company
24th Oct 201910:00 amRNSHolding(s) in Company
23rd Oct 20192:00 pmRNSHolding(s) in Company
17th Oct 20197:00 amRNSTolmount East success
14th Oct 201911:00 amRNSHolding(s) in Company
11th Oct 201911:03 amRNSHolding(s) in Company
11th Oct 201911:00 amRNSHolding(s) in Company
10th Oct 201911:00 amRNSHolding(s) in Company
9th Oct 20195:00 pmRNSHolding(s) in Company
7th Oct 201911:00 amRNSHolding(s) in Company
4th Oct 201911:01 amRNSHolding(s) in Company
4th Oct 201911:00 amRNSHolding(s) in Company
3rd Oct 201911:00 amRNSHolding(s) in Company
2nd Oct 20194:00 pmRNSDirector/PDMR Shareholding
2nd Oct 201911:00 amRNSHolding(s) in Company
1st Oct 201910:00 amRNSTotal Voting Rights and Warrant Update
30th Sep 201911:00 amRNSHolding(s) in Company
27th Sep 20195:00 pmRNSHolding(s) in Company
26th Sep 20195:00 pmRNSHolding(s) in Company
26th Sep 201911:00 amRNSHolding(s) in Company
25th Sep 201911:00 amRNSHolding(s) in Company
24th Sep 20191:00 pmRNSHolding(s) in Company
23rd Sep 201911:00 amRNSHolding(s) in Company
19th Sep 201911:00 amRNSHolding(s) in Company
16th Sep 201910:00 amRNSHolding(s) in Company
10th Sep 20194:00 pmRNSHolding(s) in Company
3rd Sep 20194:00 pmRNSDirector/PDMR Shareholding
2nd Sep 20192:00 pmRNSTotal Voting Rights and Warrant Update
22nd Aug 20197:00 amRNSHalf-Year Results
20th Aug 201910:00 amRNSHolding(s) in Company
16th Aug 20194:30 pmRNSHolding(s) in Company
14th Aug 201910:00 amRNSHolding(s) in Company
2nd Aug 201911:00 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.