Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPowerhouse Ener Regulatory News (PHE)

Share Price Information for Powerhouse Ener (PHE)

Share Price is delayed by 15 minutes
Get Live Data
0.225    -0.007 (-3.02%)
Bid:
0.22
Ask:
0.23
Spread: 0.01 (4.545%)
Market Cap: £11.52m
PHE Live PriceLast checked at - London Stock Exchange

Intraday Powerhouse Ener Share Chart

G3-UHt Demonstration Update

9 Aug 2017 07:00

POWERHOUSE ENERGY GROUP PLC - G3-UHt Demonstration Update

POWERHOUSE ENERGY GROUP PLC - G3-UHt Demonstration Update

PR Newswire

London, August 9

8 August 2017

PowerHouse Energy Group plc(“PowerHouse” or “the Company”)

G3-UHt Demonstration Update

PowerHouse Energy Group plc (AIM: PHE), the company focused on ultra high temperature gasification waste-to-hydrogen, waste-to-energy, and the creator of Distributed Modular Gasification© (DMG) systems, is pleased to announce that after the recent successful re-commissioning and high-temperature operation of the Company’s G3-UHt DMG module (the “Unit”), the Company has commenced a programme of demonstrations of the technology, testing of various feed stocks and operational parameters, and in-depth analysis of the synthesis gas (syngas) constituents.

It is expected that the demonstrator Unit at Thornton Science Park will be run for an extended period during August in anticipation of a full week of operation in September. During these operational segments the engineering and development teams will be collecting data from a variety of sources integrated throughout the Unit. Subsequent to operation the Unit will be thoroughly inspected and all relevant data reviewed.

Concurrent with the regular operation of the demonstrator Unit, collected data will be fed into process models for the basis of design for the first commercial unit to be constructed. The engineering team has begun this design effort.

It is anticipated that public demonstrations for interested parties, including investors, will be held in September and the Company will provide further details in due course.

David Ryan, Powerhouse Executive Director of Programme Development and responsible for overseeing all Company activities at Thornton Science Park, said: “This is the beginning of an exciting time for PowerHouse. We now have the tools, the talent, and the G3-UHt in operation to allow us to develop DMG into a commercial reality. We are taking a thoughtful and conservative approach to getting the full-scale design right first time. This will save us development time and cost in the long run.

“This cannot mean reducing effort, indeed, we are growing the team to facilitate 24/7 operations in the near term.”

For more information, contact:

PowerHouse Energy Group plc Keith Allaun, Executive ChairmanTel: +44 (0) 203 368 6399
WH Ireland Limited (Nominated Adviser) James Joyce / James BavisterTel: +44 (0) 207 220 1666
Turner Pope Investments Ltd (Joint Broker) Ben Turner / James PopeTel: +44 (0) 203 621 4120
Smaller Company Capital Limited (Joint Broker) Jeremy WoodgateTel: +44 (0) 203 651 2910
IFC Advisory (Financial PR & IR) Tim Metcalfe / Miles NolanTel: +44 (0) 203 053 8671

About PowerHouse Energy

PowerHouse is the holding company of the G3-UHt Ultra High Temperature Gasification Waste-to-Energy system, and the creator of Distributed Modular Gasification©.

The Company is focused on technologies to enable energy recovery from municipal waste streams that would otherwise be directed to landfills and incinerators; or from renewable and alternative fuels such as biomass, tyres, and plastics to create syngas for electrical power generation, or high-quality hydrogen for transportation. Distributed Modular Gasification© allows for easy, economical, deployment and scaling of an environmentally sound solution to the growing challenges of waste elimination, electricity demand, and distributed hydrogen production. Distributed Modular Gasification and DMG are copyrights of Powerhouse Energy Group plc.

PowerHouse is quoted on the London Stock Exchange's AIM Market. The Company is incorporated in the United Kingdom.

For more information see www.powerhouseenenergy.net. PowerHouse may also be followed on Vox Markets at www.voxmarkets.co.uk/company/PHE.

Date   Source Headline
6th Mar 20177:16 amPRNAFC Fuel Cell Order
24th Feb 20177:00 amPRNSiting of G3-UHt Demonstration Unit
21st Feb 20177:00 amPRNAppointment of non-executive director
15th Feb 20178:07 amPRNPlacing, Loan Note Conversion and Repayment
14th Feb 20174:40 pmRNSSecond Price Monitoring Extn
14th Feb 20174:35 pmRNSPrice Monitoring Extension
6th Feb 20177:00 amPRNMOU with Peel Environmental
30th Jan 20177:00 amPRNIssue of Equity
26th Jan 20177:00 amPRNPHE G3-UHt Update
19th Jan 20177:00 amPRNAgreement to Issue of Equity
18th Jan 20177:00 amPRNAgreement with Project Development Consultant
6th Dec 201611:04 amPRNContainerisation of the G3-UHt Gasification System
4th Oct 20167:00 amRNSNew video showcasing G3-UHt unit in operation
21st Sep 20167:00 amPRNInterim results for the six months ended 30 June 2016
8th Sep 201612:17 pmPRNResults of Annual General Meeting
6th Sep 20167:00 amPRNCompletion of G3-UHt Testing Program
3rd Aug 20167:00 amPRNNotice of AGM
15th Jul 20167:00 amPRNIssue of Equity
12th Jul 20164:36 pmPRNHolding(s) in Company
5th Jul 20167:02 amPRNFinal Results - Replacement
30th Jun 20167:00 amPRNFinal Results
31st May 20164:31 pmPRNHolding(s) in Company
25th May 20167:05 amPRNHolding in the Company
25th May 20167:00 amPRNCommercial Cooperation Agreement
17th May 20167:00 amPRNDirectorate Change
5th May 20162:36 pmPRNIssue of Equity
3rd May 20167:30 amRNSRestoration - Powerhouse Energy Group Plc
29th Apr 20164:35 pmPRNAppointment of Nominated Adviser
28th Apr 20163:52 pmPRNCorporate and Operational Update
6th Apr 20167:00 amPRNUpdate on RenewMe and Suspension
1st Apr 20163:35 pmPRNResignation of Nomad and update on RenewMe
1st Apr 20163:30 pmRNSSuspension - Powerhouse Energy Group Plc
31st Mar 20165:00 pmPRNTotal Voting Rights
30th Mar 20167:00 amPRNUpdate on PHE G3 UHt System
22nd Mar 201611:52 amPRNHolding(s) in Company
22nd Mar 201611:28 amPRNHolding(s) in Company
9th Mar 20164:16 pmPRNHolding(s) in Company
3rd Mar 20163:13 pmPRNIssue of Equity
29th Feb 20165:00 pmPRNTotal Voting Rights
23rd Feb 20162:43 pmPRNIssue of Equity
23rd Feb 201610:59 amPRNHolding in the Company
16th Feb 20164:48 pmPRNChange of Registered Office
16th Feb 20161:44 pmPRNHolding in the Company
12th Feb 201610:06 amPRNHolding(s) in Company
26th Jan 20167:00 amPRNIssue of Equity and Holding in the Company
4th Jan 20167:00 amPRNTotal Shares On Issue
9th Dec 20157:00 amPRNCircular Resolution to Issue New Shares
3rd Dec 20152:29 pmPRNResult of AGM & Shareholder Update
10th Nov 20157:00 amPRNNotice of AGM
9th Nov 20157:00 amPRNUpdate on PHE G3-UHt

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.