PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPowerhouse Ener Regulatory News (PHE)

Share Price Information for Powerhouse Ener (PHE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.90
Bid: 0.85
Ask: 0.95
Change: -0.03 (-3.23%)
Spread: 0.10 (11.765%)
Open: 0.90
High: 0.95
Low: 0.90
Prev. Close: 0.93
PHE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Company Update

30 Jan 2015 17:05

RNS Number : 6782D
Powerhouse Energy Group PLC
30 January 2015
 



30 January 2015

 

PowerHouse Energy Group plc

("PowerHouse" or the "Company")

Introduction of next generation gasification technology (PHE-Gen3)

 

Eitting update

 

Construction update on first of three mobile test units

 

 

PowerHouse (AIM: PHE) provides the following update in relation to its activities.

Further to the Company's announcement on 3 December 2014, the second phase of the Eitting redevelopment and commercialisation project has been completed. It is now anticipated that PowerHouse will be able to demonstrate un-interrupted commercial operation of the Munich facility by the end of June 2015.

Phase three of the project - the final engineering, manufacturing and testing of the newly designed PHE Gen3-UHt Gasification technology, has commenced in Australia at the facilities of the Company's newly appointed engineering partner, Ore-Pro Pty, Ltd.

 

Over the past eight months, PowerHouse has been working aggressively with its engineering partner based in Australia to redesign the entire gasification process and inherent system infrastructure. Several issues related to the Pyromex process have been a concern to potential customers for some time. The new engineering and design eliminates these issues. The Company's engineering partner has incorporated significant improvements in reliability, operation, maintenance, thermal efficiency and dramatically increased gasification temperatures.

The incorporation of a proprietary reactor tube design, high-efficiency reactor chamber, and vastly improved syngas-management and catchment system (including low-energy microwave technology) has led to the ability to dramatically reduce the parasitic energy load on the system, and to reduce the over-all size of the system. The PHE Gen3-UHt increases feedstock through-put at comparable size to the less efficient Pyromex systems, thereby reducing the cost of manufacturing per calorie produced and increases potential profitability. The improvements incorporated in the newly designed PHE-G3 UHt system represent a complete redevelopment of the entire Gasification Unit.

 

The Gen3-UHt Gasification system, a recently developed, concurrent-phase process, has proven to be a superior technology to prior Pyromex trials in each component the Company has evaluated. A number of engineering breakthroughs, including the integration of both resistance and microwave heating (concurrent-phase process), have set the PHE Gen3-UHt Gasification System apart from processes available elsewhere. Operating models of the PHE-Gen3 UHt which have been evaluated at the engineering facility in Australia, combined with a re-examination of earlier Pyromex test data, have reinforced the Company's decision to embrace this new approach for PowerHouse's gasification engineering and commercialisation efforts.

 

Final engineering of the new G3-UHt System has been carried out in Australia and the first of three mobile customer application units (nominal 2-5 tonne per day through-put) is under current construction. Each of these units will be able to be moved to a potential customer site for complete process demonstration from feedstock evaluation to syngas creation to electrical generation. 

 

PowerHouse is currently negotiating the use of one of its Mobile Units to demonstrate the elimination of Medical Waste at a facility in Australia. The other two units are expected to be deployed in the UK (for the elimination of Auto Shredder Residue) and in Asia, where demand for alternatives to incineration and landfill, and demand for distributed electrical generation are growing rapidly. As a result of delays in shipping and the acquisition of key components, it is anticipated that the Mobile Unit in Australia will not be operational until late February, with the other two units becoming operational two months later. 

 

It is anticipated that due to the successful development and demonstrations in Australia, the Swiss engineering operations of the company will be eliminated, with only essential business development and support personnel remaining in the region, thereby reducing the cost-burden on Powerhouse. 

 

Keith Allaun, Executive Chairman of PowerHouse Energy Group, plc, said

 

 "Following the acquisition of Pyromex and a robust evaluation of its commercial potential, the Company realised that it would be in the interests of its shareholders to completely redesign the gasification process. A third party presented us with an innovative design which made us realise that we could better serve our potential customers and shareholders by bringing an advanced engineering and commercialisation approach to the system. The PHE-Gen 3 UHt Gasification System positions PowerHouse to provide a vastly superior and competitive offering in the rapidly growing Waste-to-Energy market."

 

 

 

 

 

For additional information please contact:

 

PowerHouse Energy Group plc

Keith Allaun +44 (0) 20 7079 4407

 

Allenby Capital Limited (Nominated Adviser and Broker)

Nick Harriss/David Hart +44 (0) 20 3328 5656

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFERLSIIVIE
Date   Source Headline
10th Jan 20227:00 amRNSDevelopment partner, HUI, admitted to AQSE
6th Dec 202112:45 pmPRNIssue of Equity
30th Nov 20217:00 amPRNDevelopment partner signs letter of intent
15th Nov 20219:06 amRNSSecond Price Monitoring Extn
15th Nov 20219:00 amRNSPrice Monitoring Extension
12th Nov 202111:05 amRNSSecond Price Monitoring Extn
12th Nov 202111:00 amRNSPrice Monitoring Extension
12th Nov 20219:05 amRNSSecond Price Monitoring Extn
12th Nov 20219:00 amRNSPrice Monitoring Extension
12th Nov 20217:00 amPRNDevelopment partner update
1st Nov 20217:00 amPRNProject update
14th Oct 20214:41 pmRNSSecond Price Monitoring Extn
14th Oct 20214:36 pmRNSPrice Monitoring Extension
14th Oct 20212:05 pmRNSSecond Price Monitoring Extn
14th Oct 20212:00 pmRNSPrice Monitoring Extension
14th Oct 202111:06 amRNSSecond Price Monitoring Extn
14th Oct 202111:00 amRNSPrice Monitoring Extension
14th Oct 20219:06 amRNSSecond Price Monitoring Extn
14th Oct 20219:00 amRNSPrice Monitoring Extension
12th Oct 20217:00 amPRNDirectorate Change
7th Oct 20217:00 amPRNCollaboration agreement with HUI
4th Oct 202112:22 pmPRNIssue of Equity
28th Sep 20217:00 amRNSInterim results for six months ended 30 June 2021
27th Sep 20217:00 amPRNDirectorate Changes
14th Sep 20217:00 amRNSDevelopment partner update
3rd Sep 20212:00 pmRNSPrice Monitoring Extension
31st Aug 20217:00 amPRNExclusivity agreement signed with HUI
20th Aug 20213:11 pmPRNDirectorate Change
18th Aug 20217:00 amPRNPlans submitted for second UK Peel site
17th Aug 20219:15 amPRNIssue of Equity
12th Aug 202111:05 amRNSSecond Price Monitoring Extn
12th Aug 202111:00 amRNSPrice Monitoring Extension
12th Aug 20219:05 amRNSSecond Price Monitoring Extn
12th Aug 20219:00 amRNSPrice Monitoring Extension
12th Aug 20217:00 amPRNAcquisition of stake in Engsolve Limited
11th Aug 20214:41 pmRNSSecond Price Monitoring Extn
11th Aug 20214:36 pmRNSPrice Monitoring Extension
29th Jul 20214:41 pmRNSSecond Price Monitoring Extn
29th Jul 20214:35 pmRNSPrice Monitoring Extension
29th Jul 20213:14 pmPRNResult of AGM
29th Jul 20212:05 pmRNSSecond Price Monitoring Extn
29th Jul 20212:00 pmRNSPrice Monitoring Extension
29th Jul 202110:59 amPRNAGM Statement
19th Jul 202111:57 amPRNIssue of Equity
7th Jul 20217:00 amPRNNotice of AGM
2nd Jul 20217:08 amPRNDevelopment Partner Update
30th Jun 20217:05 amRNSFinal results for the year ended 31 December 2020
30th Jun 20217:00 amPRNDirectorate Changes
29th Jun 20214:40 pmRNSSecond Price Monitoring Extn
29th Jun 20214:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.