Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPatagonia Gold Regulatory News (PGD)

  • There is currently no data for PGD

Resource Statement

4 Oct 2007 07:00

Patagonia Gold PLC04 October 2007 PATAGONIA GOLD PLC Trading Symbol PGD.L RESOURCE STATEMENT-LOMADA DE LEIVA PROPOSED WORK PROGRAM 2007 Lomada de Leiva Gold Resource: Chlumsky, Armbrust and Meyer, LLC. (CAM) of Lakewood, Colorado, was retained byPatagonia Gold PLC (PGD) to independently define and describe a gold Resource atLomada de Leiva, Santa Cruz Province, Argentina, which complies with CanadaNational Instrument 43-101 (NI 43-101). Resource estimates at 0.30 grams per tonne gold (Au) cut-off for Lomada de Leivaare: Measured and Indicated at 161,346 ounces Au. and additional Inferred Resourcesof 73,725 ounces Au. Lomada de Leiva Project The Lomada de Leiva Project, together with the adjacent Breccia Sofia Prospect,is located on the La Paloma property block and is approximately 40km to thesouth of the town of Perito Moreno in the Santa Cruz province of Argentina. A drilling campaign, consisting of 62 drill holes for 8,862 metres (m),commenced in February of this year, was completed by PGD on the 100% ownedLomada de Leiva Project. The drilling was designed to validate historical drilldata and to infill and extend the existing resource for definition to CanadianNational Instrument 43-101 standards. PGD is very encouraged with the above results. The Project team has successfullyadvanced Lomada de Leiva from acquisition, in February of this year, through asubstantial drill programme to NI 43-101compliant Resource status in just 6months. This is not only an outstanding achievement for the team butdemonstrates the robust potential of the Project. Furthermore, two thirds of the resource has been categorized as 'measured andindicated' thus substantially reducing the additional amount of drillingrequired to advance this deposit towards Reserve status. These results supported with the high potential to develop additional resourcesat; Lomada de Leiva, the adjacent Breccia Sofia and nearby Cerro Vasco aresufficiently encouraging for PGD to advance this Project towards possibleproduction. Scoping Study: Accordingly, PGD intends to appoint Independent Engineers toundertake a Scoping study (preliminary assessment) to determine potentialeconomics for mining Lomada de Leiva and to identify the target resource basethat will support mining on that project. The following table and comments are extracts from CAM's Report +-------------------------------------------------------------+|Table 1-1 || ||Resource Totals |+-----------------+---------+---------+---------+-------------+|Resource Type | Cut-off| Tonnes| Au Grade| Contained Au|| | | | (g/t)| (Troy oz)|| | (g/t Au)| | | |+-----------------+---------+---------+---------+-------------+| | | | | |+-----------------+---------+---------+---------+-------------+|Measured | 0.30|1,427,628| 1.125| 51,633|+-----------------+---------+---------+---------+-------------+|Indicated | 0.30|3,574,388| 0.955| 109,713|+-----------------+---------+---------+---------+-------------+|Measured + | 0.30|5,002,016| 1.003| 161,346||Indicated | | | | |+-----------------+---------+---------+---------+-------------+|Inferred | 0.30|3,412,271| 0.672| 73,725|+-----------------+---------+---------+---------+-------------+| | | | | |+-----------------+---------+---------+---------+-------------+|Measured | 0.50| 951,843| 1.491| 45,630|+-----------------+---------+---------+---------+-------------+|Indicated | 0.50|2,315,170| 1.261| 93,859|+-----------------+---------+---------+---------+-------------+|Measured + | 0.50|3,267,013| 1.328| 139,489||Indicated | | | | |+-----------------+---------+---------+---------+-------------+|Inferred | 0.50|1,850,623| 0.911| 54,187|+-----------------+---------+---------+---------+-------------+| | | | | |+-----------------+---------+---------+---------+-------------+|Measured | 1.00| 454,530| 2.357| 34,451|+-----------------+---------+---------+---------+-------------+|Indicated | 1.00|1,035,423| 1.958| 65,194|+-----------------+---------+---------+---------+-------------+|Measured + | 1.00|1,489,953| 2.080| 99,645||Indicated | | | | |+-----------------+---------+---------+---------+-------------+|Inferred | 1.00| 456,543| 1.628| 23,890|+-----------------+---------+---------+---------+-------------+ Exploration, mainly drilling and trenching, have been carried out to industrystandards including the analysis, quality assurance and quality control effortsapplied to the exploration work. The delineated significant interceptsindicating the gold mineralization has been verified and substantiatedsufficiently to pursue a resource calculation for the Lomada Leiva project. Oxide mineralization of potentially economic grade is present from surface to atleast 60-meter depth. Resource estimates at 0.3 grams per tonne Au cutoff forLomada Leiva are Measured and Indicated at 161,346 ounces Au. Inferred Resourcestotal 73,725 ounces Au. The potential for further mineralization at Lomada de Leiva includes addeddefinition along strike as well as the potential for offsets along strike andparallel structures (as suggested by CSAMT interpretations). The depth of the mineralization is fairly well defined at 200 meters verticaldepth, however there are possibilities for additional discovery at depthespecially in the southern portion of the defined ore body where isolatedlow-grade (greater than 5 ppm Au) chalcedonic veins may be followed to depth inanticipation of enhanced grade with the intersection with the main mineralizedstructure. Bottle Roll and other tests are in progress for the Lomada Leiva samples.Preliminary results of bottle roll tests indicates an average of 71 percentextraction in 6 hours and 85 percent extraction in 12 hours for oxidized mineralmaterial, derived from sample. Testing is continuing. CAM believes the resource model is suitable for preliminary mine design, andrecommends the following actions to facilitate the conversion of the Resource toa Reserve: 1. Perform two preliminary pit designs. One, based on Measured and Indicated Resources, and the other on Measured plus Indicated plus Inferred Resources. On the basis of these designs, one or two holes should be drilled on each section above and below the pit bottom to define final pit geometry 2 In addition to the pit bottom design holes, review the sections to see if additional drilling is necessary to define the lateral extent of the ore.' End of extracts A follow-up drill programme is planned for Lomada de Leiva after detailedinterpretation of the drill sections and results. In addition the previousControlled source audio frequency magnetotellurics (CSAMT) geophysics survey isto be extended (one of CAM's recommendations) to cover a sub parallel structureas well as the ground to the north of Breccia Sofia. The drill programme will be designed to increase the exiting resource potentialas well as elevating the known resource categories. Breccia Sofia Breccia Sofia is considered part of the same mineralised felsic dome system thathosts the Lomada de Leiva breccia-vein structure. However at Breccia Sofia thereare also high silver values with previous drilling reporting values of 3m @140.6g/t gold, including 1m of 401g/t gold and 1,095g/t silver in drill-holeDDH-LP42. 17 reverse circulation (RC) holes were drilled by PGD at Breccia Sofia,infilling and extending the previous drilling. Results not previously reported include +---------+----------+----------+---------+ |Drill |From |Interval |Gold | |Hole No. |Metres |metres | | | | | |g/t | +---------+----------+----------+---------+ |BSR-07 |79.0 |2.0 |3.02 | +---------+----------+----------+---------+ |BSR-12 |55.0 |5.0 |2.48 | +---------+----------+----------+---------+ |and |75.0 |4.0 |2.16 | +---------+----------+----------+---------+ |BSR-14 |70.0 |3.0 |4.44 | +---------+----------+----------+---------+ |BSR-15 |38.0 |3.0 |2.85 | +---------+----------+----------+---------+ |and |48.0 |5.0 |17.49 | +---------+----------+----------+---------+ |BSR-16 |25.0 |7.0 |2.61 | +---------+----------+----------+---------+ |and |42.0 |3.0 |3.33 | +---------+----------+----------+---------+ |BSR-17 |31.0 |4.0 |1.90 | +---------+----------+----------+---------+ |and |42.0 |2.0 |7.56 | +---------+----------+----------+---------+ The values indicate that a broad zone of gold grades >1g/t gold exists on strike500m from the Lomada de Leiva resource area. Drill holes BSR15-16-17 are themost southerly line drilled targeting a structure sub parallel to the Lomada deLeiva trend and 100m south of the nearest drill line. This structure is 550m along the inferred strike from the drill hole DDH-LP42and is open to the south and down dip. Currently drill sections are being interpreted and preparations made for a CSAMTgeophysics survey in order that a follow up drill programme can be prepared. Cerro Vasco PGD 'Property 28' (Cerro Vasco) is located 8km to the north of Lomada de Leivawithin the same regional structural corridor. The main zone, Brecha Emilia,comprises a brecciated gold-mineralized structure of 1,200metre strike lengthand has similar characteristics to the Lomada de Leiva breccia-vein system.Mapping of the central part of the structure and systematic rock chip samplinghas been carried out by PGD. Gold values in the region of 3g/t to 4g/t werereported and included a sawn channel intersection of 2.85m @ 44.2 g/t gold. The Santa Cruz Mines department has approved the Environmental Impact Assessmentfor a drill programme at Cerro Vasco. Exploration Programme for the second half of 2007 The exploration programme for second half of 2007 includes a proposed 10,000metre drill programme scheduled to commence in October. Two drill contracts havealready been signed and all environmental approvals granted. At Breccia Sofia3,000 metres will infill and extend existing drilling in order to quantify thispotential resource adjacent to Lomada de Leiva; a further 3,500 metres isallocated for La Manchuria to infill the Main Zone for production of a NI 43-101compliant resource and 3,500 metres for Breccia Valentina and Cap Oeste ontargets defined by recent validation and exploration. Shareholders will be kept regularly informed by press releases over the ensuingmonths with respect to the progress on the drilling and exploration programmes. Marc Sale, (BSC. Geology, Fellow AusIMM, member AIG) a Director and consultantto Patagonia Gold Plc and a qualified person as defined in National Instrument43-101, has reviewed and verified all scientific or technical mining disclosurecontained in this press release. Mr. Robert L Sandefur, P.E. Consultant Engineer with Chlumsky, Armbrust andMeyer, LLC and the author of the report entitled " NI 43-101 Compliant TechnicalReport Lomada Leiva Project Santa Cruz Province, Argentina" prepared forPatagonia Gold Plc, dated 31 August, 2007, is the Qualified Person in accordancewith the requirements of the Canadian National Instrument 43-101. ENDS For more information, please contact: Bill Humphries/Richard Prickett Anthony Cardew/Tim RobertsonPatagonia Gold Plc Tel: +44 (0) 20 7930 0777Tel: + 44 (0)2 7409 7444 Fax: +44 (0) 20 7925 0647www.patagoniagold.com Email: tim.robertson@cardewgroup.comTrading Symbol PGD.L This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
8th Sep 20117:00 amRNSDrilling Update
7th Sep 20113:38 pmRNSExercise of Options
2nd Aug 20113:15 pmRNSExercise of Options
1st Aug 20113:07 pmRNSExercise of Options
8th Jul 20114:20 pmRNSExercise of Options
9th Jun 20117:00 amRNSResult of AGM
8th Jun 20117:00 amRNSAppointment of Chief Financial Officer
6th Jun 20117:00 amRNSDrilling Report
1st Jun 20117:00 amRNSDrilling Report
18th May 20117:00 amRNSPROGRESS REPORT LOMADA GOLD PROJECT
13th May 20114:58 pmRNSGrant of Options
10th May 20111:46 pmRNSExercise of Options
9th May 20117:00 amRNSFinal Results
28th Apr 20119:32 amRNSPlacing to raise £5.25 million
19th Apr 20111:17 pmRNSPlacing and Subscription to raise £19m
14th Apr 201111:32 amRNSExercise of Options
7th Apr 20117:00 amRNSDRILLING UPDATE - CAP-OESTE
5th Apr 20117:00 amRNSPROGRESS REPORT
29th Mar 20117:00 amRNSCOSE Resource and Preliminary Economic Assessment
23rd Mar 20117:00 amRNSAmendment to Barrick Agreement
8th Mar 20118:00 amRNSExercise of Options
18th Feb 201111:29 amRNSGrant of options
10th Feb 201110:05 amRNSExercise of Options
26th Jan 20117:00 amRNSPROGRESS REPORT
5th Jan 20112:01 pmRNSExercise of Options
7th Dec 20107:00 amRNSExploration Progress
24th Nov 20107:00 amRNSProgress Report - Cap-Oeste South East Project
15th Nov 20106:15 pmRNSExercise of Options
10th Nov 20107:00 amRNSUpdate - Lomada Gold-Heap Leach Project
8th Nov 20104:30 pmRNSExercise of Options
3rd Nov 20107:00 amRNSDrilling Report
29th Oct 201011:00 amRNSExercise of Options
25th Oct 201010:00 amRNSExercise of options
25th Oct 201010:00 amRNSExercise of options
29th Sep 20107:00 amRNSHalf Yearly Report
14th Sep 201012:38 pmRNSExercise of Options
14th Sep 20107:00 amRNSAdvanced Exploration Target
10th Sep 20101:01 pmRNSDirector/PDMR Shareholding
8th Sep 20107:00 amRNSLomada Progress Report
27th Jul 20109:22 amRNSReplacement - PROGRESS REPORT
27th Jul 20107:00 amRNSPROGRESS REPORT
18th Jun 20101:21 pmRNSGrant of options
16th Jun 20105:00 pmRNSResult of AGM
16th Jun 20107:00 amRNSDrilling Report
21st May 20107:00 amRNSFinal Results
4th May 20107:00 amRNSPlacing and Subscription
16th Apr 20109:06 amRNSPermit received for Lomada de Leiva
15th Apr 20104:42 pmRNSHolding(s) in Company
14th Apr 20107:00 amRNSDrilling Report
23rd Mar 20107:00 amRNSDrilling Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.