Production Guidance and Resource Update

3 Nov 2017 07:00

RNS Number : 4481V
Patagonia Gold PLC
03 November 2017
 

3 November 2017

 

Patagonia Gold Plc

("Patagonia Gold" or the "Company")

 

Production Guidance and Resource Update

 

Patagonia Gold Plc, the mining company with gold and silver projects in the southern Patagonia region of Argentina, Chile and Uruguay, announces an update of the Cap-Oeste resource model and forecast production update for the Cap-Oeste heap leach operation.

 

Summary

· Total production for 2017 is estimated to be 30,950 oz AuEq (2016: 25,800 oz AuEq, 2015: 21,521 oz AuEq)

─ Production at Cap-Oeste for the year expected to be 24,850 oz AuEq, significantly lower than previous guidance due to delays in getting the agglomeration circuit installed

─ Recovery issues at Cap-Oeste now resolved and overall recovery ramping up to design

─ Production at Lomada is expected to reach 6,100 oz Au for the year, significantly higher than forecast for the year

· Update resource model of Cap-Oeste shows contained ounces of COSE style (high grade) cyanide leachable mineralisation double to 295,000 oz AuEq

 

Production guidance

 

After a series of significant setbacks, the Cap-Oeste heap leach pad is now producing from a fully commissioned agglomeration plant, with the recovery issues having been resolved. The first pass leaching of fully agglomerated product over a period of 14 days, resulted in a recovery of 62% which is in line with testwork results and expectations for this length of leaching and the Company remains confident that gold recovery of 80% will be achieved on completion of the full leaching cycle. Agglomeration of the ore continues on a daily basis with throughput now exceeding 3,000 tonnes per day from a 12 hour shift, with 85,000 tonnes of agglomerated ore having now been loaded onto the pads as at the end of October 2017.

 

As a result of the previously announced recovery issues experienced at Cap-Oeste, production for 2017 has been materially impacted and the Company now expects production from the Cap-Oeste heap leach operations to be 24,850 oz AuEq for 2017 full year, with 10,100 oz AuEq for the final quarter of 2017. The Company expects to provide production guidance for 2018 during Q1 2018.

 

Lomada continues to perform well with production exceeding expectations with production for 2017 expected to be 6,100 oz Au. Leaching at Lomada will continue for as long as it remains commercially viable.

 

Cap-Oeste resource update

 

Current pit operations have now advanced to a level where high grade COSE style hypogene mineralisation has been exposed, enabling the Company to confirm the shoot's dimensions and style of mineralisation and grade below the current pit. A subsequent reinterpretation of the deeper drilling and mineralisation intersected below the current pit, has led to a material increase in the tonnage and contained Au and Ag of this non refractory style of mineralisation (which falls within the COSE style mineralisation).

 

An updated JORC compliant resource model has been completed by CUBE Consulting to report on the ore below the current pit and shows a material increase in the COSE type mineralisation, which can be treated via cyanide leaching, in the Cap-Oeste resource (Measured and Indicated) which is now approximately 295,000 oz AuEq at an average grade of approximately 19.40 g/t AuEq.

 

The current pit, which is expected to be completed in March 2018, as at the end of August 2017, still contains 578,347t @ 3.32 g/t Au and 131 g/t Ag for 61,875 oz Au and 2.44 Moz Ag for a total AuEq contained oz of 96,994 oz and has not been included in the updated JORC Code Compliant resource.

 

The tables below set out the JORC Code Compliant resource below the current pit.

 

Table 1: JORC Code Compliant Gross Resource for Cap-Oeste below the current pit - October 2017

 

Gross Resources for Cap-Oeste

Geo Ox

Tonnes

Grade (g/t)

Metal (oz)

Au LUC/OK

Ag LUC/OK

AuEq(1)

Au

Ag

AuEq(1)

MEASURED RESOURCES

Oxide

221

2.74

18.25

3

19

130

21

COSE(2)

-

-

-

-

-

-

-

Fresh(3)

1,693

2.91

51.7

3.65

158

2,814

199

Sub-Total

1,914

2.89

47.84

3.58

178

2,944

220

INDICATED RESOURCES

Oxide

1,971,594

1.06

32.6

1.53

66,942

2,066,450

96,701

COSE(2)

472,426

12.63

469.96

19.4

191,800

7,138,215

294,596

Fresh(3)

8,111,721

1.7

46.49

2.37

443,100

12,125,600

617,711

Sub-Total

10,555,741

2.07

62.85

2.97

701,842

21,330,265

1,009,008

MEASURED + INDICATED RESOURCES

Oxide

1,971,815

1.06

32.6

1.53

66,962

2,066,580

96,723

COSE(2)

472,426

12.63

469.96

19.4

191,800

7,138,215

294,596

Fresh(3)

8,113,414

1.7

46.5

2.37

443,258

12,128,414

617,910

Sub-Total

10,557,655

2.07

62.85

2.97

702,019

21,333,209

1,009,228

INFERRED RESOURCES

Oxide

528,193

0.68

23.15

1.01

11,468

393,044

17,127

COSE(2)

-

-

-

-

-

-

-

Fresh(3)

4,366,559

1.45

36.14

1.97

203,929

5,073,580

276,999

Sub-Total

4,894,752

1.37

34.74

1.87

215,396

5,466,624

294,126

Total

15,452,407

1.85

53.94

2.62

917,416

26,799,833

1,303,355

 

 

Table 2: JORC Code Compliant Net Resource for Cap-Oeste below the current pit attributable to the Company - October 2017

 

Net Attributable Resources to the Company (PGSA)(4)

Geo Ox

Tonnes

Grade (g/t)

Metal (oz)

Au LUC/OK

Ag LUC/OK

AuEq(1)

Au

Ag

AuEq(1)

MEASURED RESOURCES

Oxide

199

2.74

18.25

3

18

117

19

COSE(2)

-

-

-

-

-

-

-

Fresh(3)

1,524

2.91

51.7

3.65

142

2,533

179

Sub-Total

1,723

2.89

47.84

3.58

160

2,649

198

INDICATED RESOURCES

Oxide

1,774,435

1.06

32.6

1.53

60,248

1,859,805

87,031

COSE(2)

425,183

12.63

469.96

19.4

172,620

6,424,394

265,136

Fresh(3)

7,300,549

1.7

46.49

2.37

398,790

10,913,040

555,940

Sub-Total

9,500,167

2.07

62.85

2.97

631,658

19,197,239

908,108

MEASURED + INDICATED RESOURCES

Oxide

1,774,634

1.06

32.6

1.53

60,266

1,859,922

87,050

COSE(2)

425,183

12.63

469.96

19.4

172,620

6,424,394

265,136

Fresh(3)

7,302,073

1.7

46.5

2.37

398,932

10,915,572

556,119

Sub-Total

9,501,890

2.07

62.85

2.97

631,817

19,199,888

908,306

INFERRED RESOURCES

Oxide

475,374

0.68

23.15

1.01

10,321

353,740

15,415

COSE(2)

-

-

-

-

-

-

-

Fresh(3)

3,929,903

1.45

36.14

1.97

183,535

4,566,221

249,299

Sub-Total

4,405,277

1.37

34.74

1.87

193,857

4,919,962

264,714

Total

13,907,166

1.85

53.94

2.62

825,674

24,119,849

1,173,019

 

Notes:

(1) AuEq values are calculated at a ratio of 69:1 Ag to Au.

(2) COSE style mineralisation with free milling cyanide recoverable Au and Ag.

(3) Fresh refractory sulphide mineralisation.

(4) Cap-Oeste is 100% owned by Patagonia Gold S.A. ("PGSA"), which is the operator of Cap-Oeste. The Company is interested in 90% of PGSA, with the remaining 10% being held by Santa Cruz government's wholly-owned mining company, Fomento Minero de Santa Cruz Sociedad del Estado. The net attributable resource, shows the 90% of the Cap-Oeste resource which is attributable to the Company.

(5) Resources were calculated on a block model of 0.5 g/t AuEq and at US$1,250 Au and US$18 Ag per oz.

 

Glossary of technical terms

Ag

the chemical symbol for Silver

Au

the chemical symbol for Gold

AuEq

gold equivalent, taking into account the amount of AG, calculated at a ratio of 69:1 Ag to Au

g/t

grammes per tonne

Indicated Resource

that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation

Inferred Resource

that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity

JORC

the Joint Ore Reserves Committee: The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, as published by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia

LUK/OK

Localised uniform conditioning/Ordinary Kriging

Measured Resource

that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are estimated with confidence sufficient to allow the application of modifying factors to support detailed mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation where data and samples are gathered

Mineral Resource

a concentration or occurrence of solid material of economic interest in or on the Earth's crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling

Moz

million ounces

oz

ounces

t

tonnes

 

Matthew Boyes, (BSC. Geology, Fellow AusIMM) Chief Operating Officer for the Company and a qualified person as defined in Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- Ends -

 

About Patagonia Gold

 

Patagonia Gold Plc is a mining company that seeks to grow shareholder value through exploration, development and production of gold and silver projects in the southern Patagonia region of Argentina. The Company is primarily focused on three projects: the flagship Cap-Oeste project, the La Manchuria project and the Lomada heap leach project. Patagonia Gold, indirectly through its subsidiaries or under option agreements, has mineral rights to over 220 properties in several provinces of Argentina, Chile and Uruguay and is one of the largest landholders in the province of Santa Cruz.

 

For more information, please contact:

 

Christopher van Tienhoven, Chief Executive Officer

Patagonia Gold Plc

Tel: +54 11 5278 6950

 

Angela Hallett and Richard Tulloch

Strand Hanson Limited (Nominated Adviser and Broker)

Tel: +44 (0)20 7409 3494

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ("MAR").

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFMMGMVZRGNZM
Date   Source Headline
30th Mar 20157:00 amRNSOperational Update
19th Mar 20157:00 amRNSUpdate on Cap-Oeste
3rd Mar 20154:40 pmRNSSecond Price Monitoring Extn
3rd Mar 20154:35 pmRNSPrice Monitoring Extension
18th Feb 20154:40 pmRNSSecond Price Monitoring Extn
18th Feb 20154:35 pmRNSPrice Monitoring Extension
16th Feb 201512:00 pmRNSHolding(s) in Company
5th Feb 201511:54 amRNSAdditional Listing
3rd Feb 20157:00 amRNSLomada Production Results
6th Jan 20152:44 pmRNSDirector/PDMR Shareholding
5th Jan 20153:30 pmRNSHolding(s) in Company
22nd Dec 201410:45 amRNSCompany Update
18th Dec 201411:44 amRNSHolding(s) in Company
8th Dec 20141:00 pmRNSResult of Fundraising and General Meeting
18th Nov 20147:00 amRNSSubscription and Open Offer
11th Nov 20147:00 amRNSOperational Update
26th Sep 20147:00 amRNSInterim Results
11th Sep 20147:00 amRNSOperational Update
3rd Sep 20142:56 pmRNSResignation of Director
3rd Sep 201412:38 pmRNSDirector/PDMR Shareholding - Replacement
2nd Sep 20144:09 pmRNSDirector/PDMR Shareholding
14th Aug 20147:00 amRNSChange of Broker
28th Jul 20147:00 amRNSGrant of Options
25th Jun 20143:14 pmRNSResult of AGM
19th May 20147:00 amRNSFinal Results
4th Apr 20147:00 amRNSCorporate Presentation
26th Feb 20142:00 pmRNSDirectors' Shareholdings/Issue of equity
18th Feb 20149:50 amRNSExercise of Options
14th Feb 20147:00 amRNSExercise of Options
29th Jan 20147:00 amRNSOperational Update
23rd Jan 20143:15 pmRNSExercise of Options and Director Shareholding
13th Jan 20143:20 pmRNSHolding(s) in Company
9th Dec 20134:35 pmRNSPrice Monitoring Extension
18th Nov 20137:00 amRNSOperational Update
29th Oct 20134:02 pmRNSHolding(s) in Company
28th Oct 20134:40 pmRNSSecond Price Monitoring Extn
28th Oct 20134:35 pmRNSPrice Monitoring Extension
11th Oct 20133:13 pmRNSHolding(s) in Company
4th Oct 201310:15 amRNSExercise of Options
4th Oct 201310:15 amRNSGrant of Options
24th Sep 201311:30 amRNSDirectors' Dealings
20th Sep 20134:40 pmRNSSecond Price Monitoring Extn
20th Sep 20134:35 pmRNSPrice Monitoring Extension
20th Sep 20132:50 pmRNSGrant of Options
12th Sep 20137:00 amRNSHalf Yearly Report
9th Sep 20134:40 pmRNSSecond Price Monitoring Extn
9th Sep 20134:35 pmRNSPrice Monitoring Extension
5th Sep 20137:00 amRNSUpdate: La Manchuria and Lomada de Leiva
4th Sep 20134:35 pmRNSPrice Monitoring Extension
3rd Sep 20134:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.