PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPatagonia Gold Regulatory News (PGD)

  • There is currently no data for PGD

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

11 Nov 2014 07:00

RNS Number : 6492W
Patagonia Gold PLC
11 November 2014
 



  

Patagonia Gold reports update on Lomada de Leiva production and the development of the Cap-Oeste and COSE Projects

 

London, United Kingdom 11th November 2014 - Patagonia Gold Plc (AIM: PGD)("Patagonia Gold" or the "Company") is pleased today to provide an update on the current production at the Company's Lomada de Leiva ("Lomada") mine and the development of the Cap-Oeste and COSE Projects.

 

Highlights:

 

Lomada Mine:

· Lomada mine reported record production of 3,900 ounces of gold in October 2014, bringing total gold produced for the last 3 months to 10,495 ounces.

· On target to achieve revised annual production forecast of 26,900 ounces of gold by the end of November 2014.

· Cash costs continue to improve with average all-in cash costs for August-September 2014 of $ 699 per ounce, including plant depreciation, with October 2014 cash costs expected to be below that level.

 

Cap-Oeste Heap Leach project:

· Second and final column test nearing completion, with preliminary recoveries of 80% for gold and approximately 40% for silver from an agglomerated product.

· Design for plant and heap leach pad ongoing and scheduled for completion by late Q4 2014.

 

COSE Project:

· Pre-feasibility study well underway, completion expected within 2 months.

 

Commenting on this announcement, Bill Humphries, CEO of Patagonia Gold said:

 

"The success of our Lomada mine, which continues to outperform expectations, is providing our Company with a sound foundation to continue with the development of our other advanced projects, Cap-Oeste and COSE, and with the exploration of our highly prospective targets identified this year on the El Tranquilo property block".

 

Lomada Mine:

The Lomada Mine is located approximately 40 kilometres south-east of the town of Perito Moreno in the Province of Santa Cruz, and is within the Group's La Paloma property block, covering over 44 square kilometres.

 

Production: In July 2014 the Company commenced the ramp up of mining at Lomada for the planned expansion of production to 3,000 ounces of gold per month.

 

October 2014 gold production reached 3,900 Oz, the third straight month of record production with the months of August through October contributing 10,495 ounces of gold. Average mined ore grade increased to above 3 grammes per tonne with the mining of the central high grade section of the pit further increasing the operating margin on the leached ore.

Year-to-date production is 24,186 ounces and with forecast November 2014 production Lomada is expected to achieve the revised annual target of 26,900 ounces.

 

Since inception through to the end of October 2014, the trial heap leach pad has recovered 70% of the estimated contained gold and is still leaching. These results confirm the expected pre-construction recovery estimations.

Costs: For the six months ending September 2014 (April-September), all-in cash costs for Lomada were $826 per ounce (including $122 per ounce for plant depreciation). For the months of August and September 2014, all-in cash costs fell to an average of $699 per ounce with October 2014 costs expected to be below that level.

 

Planned Works:In Q1 2015, a cut back of the main pit is scheduled to commence, resulting in increased waste material movement for a period of up 4-6 months while deeper ore in the North and South of the pit is exposed.

 

 

Cap-Oeste Heap Leach Project:

The final stage test work on the Cap-Oeste agglomerated oxide material is nearing completion. Preliminary results to date are in line with previously estimated recoveries from a smaller first stage column with 80% of the gold and 40% of the silver being extracted to solution within the first 18 days of operation. The final reconciled recovery estimate will not be available until the columns are broken down following 40 days of leaching and the final head and tails analysis completed. However, the Company is confident that final recoveries will not vary materially from the numbers reported herein.

 

The plant design is continuing with the process route selected being a single phase leach and Merrill Crowe circuit. As previously stated, a 2 stage crushing circuit followed by a cement agglomeration stage will be installed with the cured agglomerated product loaded and leached in 6m lifts as with the current Lomada de Leiva operation. Annual production rates are being targeted at between 40,000-50,000 ounces of gold equivalent (gold, silver) production. Final cash flow numbers and capital requirements are scheduled to be available early Q1 2015 although preliminary capital estimates fall in the range of $US 30-35M for the project. Project development commencement will depend on permitting and finance timetables, which are expected to be finalised within the next 3-4 months. Shareholders will be kept informed of progress.

 

COSE Project:

Pre-feasibility study work at COSE is continuing with completion of the study scheduled for the next 6-8 weeks. A final processing route for the ore has been selected after considerable test work and several processing route options explored. A small 15tph plant is being designed with a combination of scrubbing, flotation, leaching and then electro winning to produce a high purity gold-silver Doré. Ore will be mined from a single decline access mine with the current mine plan aiming at 100% extraction of the mineable portion of the resource.

 

Permitting for the decline construction has already been granted. A full mining permit will be applied for once the final pre-feasibility and updated Environmental Impact Statement (EIS) are completed and have demonstrated sufficient economic robustness to move forward. Financing alternatives for the construction of the mine are currently being evaluated.

 

Ends

 

About Patagonia Gold

Patagonia Gold Plc is a mining company that seeks to grow shareholder value through exploration, development and production of gold and silver projects in the southern Patagonia region of Argentina. The Company is primarily focused on three projects: the flagship Cap-Oeste/COSE project, the La Manchuria project and the Lomada heap leach project, which is generating free cash flow. Patagonia Gold, indirectly through its subsidiaries or under option agreements, has mineral rights to over 220 properties in several provinces of Argentina and Chile, and is one of the largest landholders in the province of Santa Cruz.

Matthew Boyes, (BSC. Geology, Fellow AusIMM) Chief Operating Officer for Patagonia Gold PGSA and a qualified person as defined in Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this press release.

 

Contact Information

Bill Humphries, CEOPatagonia Gold PlcTel: +44 (0)20 7409 7444

David Bick / Mark LongsonSquare 1 Consulting+44 (0)20 7929 5599

Angela Hallett/James SpinneyStrand Hanson LimitedTel: +44 (0)20 7409 3494

Jeremy Stephenson/Stewart DicksonCantor Fitzgerald EuropeTel: +44 (0)20 7894 7000

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBRBDBBBBBGSG
Date   Source Headline
8th Sep 20117:00 amRNSDrilling Update
7th Sep 20113:38 pmRNSExercise of Options
2nd Aug 20113:15 pmRNSExercise of Options
1st Aug 20113:07 pmRNSExercise of Options
8th Jul 20114:20 pmRNSExercise of Options
9th Jun 20117:00 amRNSResult of AGM
8th Jun 20117:00 amRNSAppointment of Chief Financial Officer
6th Jun 20117:00 amRNSDrilling Report
1st Jun 20117:00 amRNSDrilling Report
18th May 20117:00 amRNSPROGRESS REPORT LOMADA GOLD PROJECT
13th May 20114:58 pmRNSGrant of Options
10th May 20111:46 pmRNSExercise of Options
9th May 20117:00 amRNSFinal Results
28th Apr 20119:32 amRNSPlacing to raise £5.25 million
19th Apr 20111:17 pmRNSPlacing and Subscription to raise £19m
14th Apr 201111:32 amRNSExercise of Options
7th Apr 20117:00 amRNSDRILLING UPDATE - CAP-OESTE
5th Apr 20117:00 amRNSPROGRESS REPORT
29th Mar 20117:00 amRNSCOSE Resource and Preliminary Economic Assessment
23rd Mar 20117:00 amRNSAmendment to Barrick Agreement
8th Mar 20118:00 amRNSExercise of Options
18th Feb 201111:29 amRNSGrant of options
10th Feb 201110:05 amRNSExercise of Options
26th Jan 20117:00 amRNSPROGRESS REPORT
5th Jan 20112:01 pmRNSExercise of Options
7th Dec 20107:00 amRNSExploration Progress
24th Nov 20107:00 amRNSProgress Report - Cap-Oeste South East Project
15th Nov 20106:15 pmRNSExercise of Options
10th Nov 20107:00 amRNSUpdate - Lomada Gold-Heap Leach Project
8th Nov 20104:30 pmRNSExercise of Options
3rd Nov 20107:00 amRNSDrilling Report
29th Oct 201011:00 amRNSExercise of Options
25th Oct 201010:00 amRNSExercise of options
25th Oct 201010:00 amRNSExercise of options
29th Sep 20107:00 amRNSHalf Yearly Report
14th Sep 201012:38 pmRNSExercise of Options
14th Sep 20107:00 amRNSAdvanced Exploration Target
10th Sep 20101:01 pmRNSDirector/PDMR Shareholding
8th Sep 20107:00 amRNSLomada Progress Report
27th Jul 20109:22 amRNSReplacement - PROGRESS REPORT
27th Jul 20107:00 amRNSPROGRESS REPORT
18th Jun 20101:21 pmRNSGrant of options
16th Jun 20105:00 pmRNSResult of AGM
16th Jun 20107:00 amRNSDrilling Report
21st May 20107:00 amRNSFinal Results
4th May 20107:00 amRNSPlacing and Subscription
16th Apr 20109:06 amRNSPermit received for Lomada de Leiva
15th Apr 20104:42 pmRNSHolding(s) in Company
14th Apr 20107:00 amRNSDrilling Report
23rd Mar 20107:00 amRNSDrilling Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.