Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPERE.L Regulatory News (PERE)

  • There is currently no data for PERE

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Minto C$2.1m Drilling Programme Update

22 Jan 2020 07:00

RNS Number : 5063A
Pembridge Resources plc
22 January 2020
 

 

22 January 2020

 

 

Pembridge Resources plc

 

Minto C$2.1M Drilling Programme Update

MAG Survey Completed, Initial Positive Results

Conversion of Ridgetop to an Underground Deposit

 

 

Minto Drilling and Exploration Update

 

 

London, United Kingdom - Pembridge Resources plc (LSE: PERE) ("Pembridge" or the "Company"), and together with its subsidiaries, the "Group"), is pleased to provide the following update at the Minto mine:

 

 

Infill and Definition drilling utilising diamond drilling ("Diamond drilling") campaign has commenced

Phase 1 Highlights

·; 14,000m diamond drilling programme commenced

·; 53 holes planned in total, targeting the identified deposits of Copper Keel West, Copper Keel North, Copper Keel South and Minto East II (See figure 1)

·; Objective is to expand the boundaries of these deposits, move additional resources to reserves, and expand existing reserves

·; Drilling commenced from surface in December 2019, with a second underground drill expected to start later this month

·; Fully funded C$2.1M budget for this phase

·; Assay results are expected from March 2020 onwards

 

 

Phase 2 of the diamond drilling campaign will start following completion of Phase 1, which is expected to be in H2 2020. C$2.0M is budgeted with 52 holes planned from surface and underground, targeting a number of step-out targets close to existing mining zones. The plan may be subject to change based on results from Phase 1 of drilling, as well as the analysis from the drone operated geophysical UAV-Magnetic ("MAG") survey.

 

 

MAG Survey analysis is underway

 

Further to the announcement made on 30 September 2019, analysis of the MAG survey has been completed. The survey was conducted over 30 square kilometres across the 'Minto' and 'DEF' claims (see figure 2), situated in and around the current Minto mining area.

 

Copper mineralisation at Minto is highly correlated with that of magnetite, which the MAG survey identifies. Therefore, data analysed from this survey will more accurately identify copper mineralisation, generating more efficient drill targeting. This is the first time a geophysical survey of this type has been used on the Minto property.

 

Results of the MAG survey have been overlaid with historical and current drilling data and historical Titan 24 DC-IP geophysical survey data, which is currently being reprocessed into 3D. Initial analysis from the MAG survey has indicated a number of promising additional targets surrounding the existing mining area, whilst also reconfirming existing exploration and development targets. Full results will be disclosed to the market later this quarter.

 

 Please refer to PDF link for diagrams in Figure 1: Map of deposits in the Minto mining area and Figure 2: Shaded area covers the Minto and DEF claims over which the UAV-Magnetic (MAGTM) survey took place

 

http://www.rns-pdf.londonstockexchange.com/rns/5063A_1-2020-1-21.pdf

 

Conversion of Ridgetop to an underground deposit

 

The Ridgetop deposit, which historically was engineered to be mined by open pit, and therefore is not included in the current Minto underground mine plan, is in the process of being remodelled and re-engineered to be mined from underground. Based on internal studies, mining of the Ridgetop from underground, rather than by open pit, will be more economical and have a significantly reduced environmental impact.

 

Ridgetop has previous received all the required permitting for open pit mining, which will need converted for underground mining. The deposit is circa 300m from existing underground infrastructure (see Figure 1). Given the extensive historical exploration work undertaken on the deposit, no additional drilling is required to define the resource. The results of the remodelling are expected back in Q1 2020, after which the permitting conversion process will commence.

 

 

Gati Al-Jebouri, Chief Executive Officer and Chairman of the Board said:

 

"I am pleased to report the drilling programme at Minto is well underway. This programme has been fully budgeted and approved by the owners of Minto and is fully funded from the ongoing project revenues.

 

We are also greatly encouraged by the initial results of the MAG survey data, as it would appear there is a high possibility of missed mineralisation around the Minto mining area, which until now was unidentified. The full results from this analysis, which has not been carried out previously, will form the foundation for the next phase of drilling, which will commence once this current programme is completed in early summer.

  

 

ENDS

 

For further information contact:

Pembridge Resources plc: +44 (0)20 7917 2968

Gati Al-Jebouri, Chief Executive Officer and Chairman of the Board

Paul Fenby, Chief Financial Officer

Thomas Horton, Vice President Corporate Development

 

Brandon Hill Capital - United Kingdom: +44 (0)20 3463 5016

Jonathan Evans

 

SI Capital - United Kingdom: +44 (0)14 8341 3500

Nick Emerson

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLDZGZMNMMGGZM
Date   Source Headline
9th Aug 20137:00 amRNSInterim Results
4th Jun 201312:00 pmRNSResult of AGM
4th Jun 201311:00 amRNSAGM Statement
16th Apr 20139:51 amRNSMaiden JORC resource at Berg Aukas Mine
15th Apr 20137:00 amRNSNotice of AGM & Annual Report & Accounts
8th Mar 20137:00 amRNSFinal Results
4th Dec 20128:01 amRNSResults of Drilling Campaign
29th Aug 20129:23 amRNSInterim Results
29th Aug 20129:23 amRNSBoard Changes
15th May 201212:11 pmRNSResult of AGM
11th Apr 20124:40 pmRNSSecond Price Monitoring Extn
11th Apr 20124:35 pmRNSPrice Monitoring Extension
11th Apr 20127:00 amRNSChange of name of nominated adviser
22nd Mar 20122:40 pmRNSAnnual Report & Accounts
24th Feb 20127:00 amRNSFinal Results
4th Jan 201210:13 amRNSStmnt re Share Price Movement
30th Dec 201112:40 pmRNSSecond Price Monitoring Extn
30th Dec 201112:35 pmRNSPrice Monitoring Extension
31st Aug 20117:00 amRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.