Results of Drilling Campaign

4 Dec 2012 08:01

RNS Number : 6608S
China Africa Resources PLC
04 December 2012
 



China Africa Resources Plc

("CAR" or the "Company")

 

Results of Drilling Campaign

China Africa Resources Plc is pleased to release the results of its underground resource drilling programme at its 100% owned Berg Aukas mine - a zinc, lead, silver and vanadium deposit in northern Namibia.

Highlights

·; Completion of the 15 hole and 6,856m diamond drilling programme.

·; Several outstanding, high grade intersections including:

o 59.40m @ 26.0% zinc, 13.2% lead

o 32.02m @ 17.8% zinc, 2.9% lead

·; The release of a maiden JORC compliant resource anticipated in Q1 2013.

·; Revised timetable for completion of feasibility study.

 

Rod Webster, CEO of CAR commented:

"I am very excited about the results of the drilling program. It's very rare to see such high grades in lead/zinc projects these days and goes to show that Berg Aukas is a very rich deposit. These results further confirm our confidence in the economics of the project."

 

Drilling Campaign

A confirmation diamond drilling campaign has been completed at the Berg Aukas mine targeting the bulk of the known resource. The drilling results have confirmed the exceptional grades and general distribution of the mineralisation as was understood from the detailed historical data on the orebody. A total of 11 holes, and four daughter holes were completed totalling in 6,856m. A table with the full results of the drilling campaign can be seen below.

Various styles of mineralisation, including massive zinc/lead sulphides, zinc and lead oxides in breccias and vanadate muds were encountered. The deposit remains open at depth.

The 3D geological model will now be updated and a maiden JORC-compliant resource will be estimated by CSA Global (UK) Ltd, which is expected to be reported in Q1 2013. During H1 2013 metallurgical test work will be undertaken on the core samples recovered from the drilling programme and a preliminary mining study will be carried out.

 

Table 1: Significant Diamond Drilling Intersections

Hole No

From (m)

To (m)

Interval (m)1

Zn%

Pb%

V%

Ag ppm

V2O5%2

BD-001

593.51

594.50

0.99

5.3

1.5

BD-001A

602.77

603.26

0.49

30.2

30.1

135

BD-001A

603.26

614.30

11.04

Cavity

BD-001A

614.30

619.37

5.07

39.5

15.5

0.589

82

1.052

BD-002

674.79

675.66

0.87

9.2

0.5

BD-002

689.20

690.00

0.80

7.1

8.3

1.530

2.731

BD-003

459.37

461.00

1.63

5.3

0.6

17

BD-003

474.00

475.41

1.41

17.4

2.5

0.008

29

0.014

BD-003

487.20

494.00

6.80

33.6

2.3

92

BD-003

504.72

505.94

1.22

38.0

2.5

159

BD-004

506.38

511.59

5.21

3.5

1.7

0.153

0.273

BD-004

515.00

520.10

5.10

2.1

2.4

0.391

0.698

BD-011B

514.00

515.42

1.42

19.0

2.5

0.032

30

0.057

BD-011B

525.24

527.05

1.81

18.8

0.1

0.141

219

0.252

BD-011B

538.00

540.00

2.00

2.8

0.8

9

BD-012

494.00

497.00

3.00

8.0

4.2

0.003

11

0.006

BD-012

509.00

515.63

6.63

2.4

1.4

0.202

7.4

0.361

BD-012

517.00

523.00

6.00

2.7

0.9

0.093

0.166

BD-012

538.00

539.00

1.00

9.4

1.1

BD-012A

498.00

500.40

2.40

3.4

4.3

0.789

1.408

BD-012A

516.00

518.80

2.80

3.3

4.6

0.808

1.441

BD-012A

523.00

531.00

8.00

3.3

2.4

0.307

3.4

0.548

BD-012A

597.60

657.00

59.40

26.0

13.2

0.134

61

0.239

including

BD-012A

597.60

621.55

23.95

38.8

29.4

0.016

138

0.028

and

BD-012A

628.52

650.69

22.17

26.6

2.7

0.210

13

0.375

BD-012A

668.00

673.68

5.68

3.0

4.1

0.476

3

0.849

BD-013

543.28

575.30

32.02

17.8

2.9

0.003

37

0.006

including

BD-013

543.28

544.08

0.80

29.9

4.7

0.035

35

0.062

and

BD-013

544.08

546.43

2.35

Cavity

and

BD-013

546.43

547.42

0.99

43.1

2.5

65

and

BD-013

552.07

564.75

12.68

20.4

3.2

47

and

BD-013

567.76

575.30

7.54

31.3

5.7

63

BD-014

551.56

554.30

2.74

42.6

3.0

0.314

115

0.560

BD-014

561.00

564.14

3.14

24.3

8.8

0.019

89

0.034

BD-014

564.14

572.3

8.16

Cavity

BD-014

572.3

573.0

0.70

34.9

11.6

0.625

145

1.116

BD-015C

634.54

635.30

0.76

6.76

0.16

BD-015C

636.64

637.63

0.99

3.10

0.09

0.003

BD-015C

640.00

644.72

4.72

20.9

0.4

0.008

11

0.014

including

BD-015C

643.36

644.72

1.36

60.8

0.9

0.005

31

0.009

BD-015C

649.75

655.00

5.25

29.0

2.9

0.489

15

0.874

including

BD-015C

649.75

653.45

3.70

38.6

1.9

0.224

20

0.399

BD-015C

661.33

662.72

1.39

3.0

1.2

0.139

0.248

 

Notes:

1 Where vanadium is not quoted assays were less than limit of detection (

2 All thicknesses quoted are 'down hole' thicknesses.

 

Historical Mineral Resource Estimate

The Drilling campaign was designed to confirm the historical (SWACO, non-SAMREC compliant) Mineral Resource Estimate from December 1977, by Lombard, 1981 (Berg Aukas Competent Persons Report, 2011, page 50); being:

Table 2: Berg Aukas Historical Mineral Resource

Tonnes

Grade

Assured and Indicated

Zn%

Pb%

V2O5%

1,651,000

17

5

0.6

 

Feasibility Study

These excellent results have taken us some 6 months longer than we originally anticipated. Now that we have the diamond drill cores, metallurgical work can commence and is planned to start early in the new year. The timing of the completion of the feasibility study is dependent upon the results of the metallurgical test-work and in particular the ability to produce a saleable vanadium product. Once the metallurgical test work and resulting process flow sheet are completed, the engineering and other remaining elements of the feasibility study could be completed in 3-4 months. On this basis, the company currently anticipates that the feasibility study will be completed by the end of the 2013.

 

Shaft inspection

A visual inspection of the Berg Aukas No2 shaft was undertaken earlier in the year using a real-time video camera lowered down the full depth of the shaft on a winch. This showed that the shaft was open to its full depth of approximately 792m. The side wall conditions were good to approximately 588m below surface, below which the presence of support steel to support the sidewall was noted. The shaft bottom had little spillage indicating no rock failures had occurred since the mine closure and subsequent shaft flooding.

 

Quality Assurance / Quality Control

Diamond core samples from the underground drilling campaign were assayed at Bureau Veritas Laboratory in Swakopmund Namibia. The Bureau Veritas Laboratory is SADCAS/SANAS ISO/IEC 17025:2005 accredited.

NQ or NQ3 size drill core was taken through the mineralised intersections, with poor ground being triple-tubed. All drill core was logged and photographed. Mineralised intervals were split in half by sawing and sampled at site. Very friable core and vanadium muds were sampled using a trowel to cut the material and samples collected manually. Samples were placed in labelled plastic bags and shipped to Bureau Veritas Mineral Laboratory in Swakopmund, Namibia, for assaying. China Africa Resources has implemented an industry standard QA/QC programme that includes the blind insertion of certified standards, duplicates and blanks into the sample stream.

All samples were sorted, dried and weighted on receipt at the laboratory. Core samples were crushed 2mm and a sub-sample pulverised to P90 of 75um. Samples were fused with sodium peroxide and subsequent melt dissolved in dilute hydrochloric acid for analysis. Zinc, lead and vanadium were determined by Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES). Silver was determined by Inductively Coupled Plasma Mass Spectrometry (ICP-MS).

 

Background of the Berg Aukas Mine

The Berg Aukas underground mine operated from 1958 to 1978. The first shaft was established in 1958 with a second shaft sunk in 1968. From 1968 to 1978 it is reported that 2.3 million tonnes of material @ 15.0% zinc, 3.9% lead and 0.85% V2O5 were hoisted from the mine, of this 1.5 million tonnes of ore at 21.5% Zn, 5.5%Pb and 1.23% V2O5 was milled.

The mine closed in 1978 due to low zinc prices, and significant resources remain un-exploited. The majority of the remaining resource is located in areas of the mine where extensive development is in place, providing good access to the orebody. 

 

Competent Persons Statement

The technical information in this announcement has been compiled, reviewed and approved by Michael Stuart MIMMM, Exploration and Development Manager for Weatherly Mining Namibia. Mr Stuart has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is undertaking to qualify as a qualified person under the AIM Note for Mining, Oil and Gas Companies. Mr Stuart is a Professional Member of the Institute of Materials, Minerals and Mining (MIMMM) and consents to the inclusion in this Announcement of such information in the form and context in which it appears.

 

For further information please contact:

 

China Africa Resources plc +44 (0) 20 7917 2989

Rod Webster, Chief Executive Officer

Dean Friday, Investor Relations

 

Nominated Adviser and Broker

RFC Ambrian Limited

Samantha Harrison / Jen Boorer + 44 (0) 20 3440 6800

 

Further information is also available on the Company's website: www.chinaafricares.com

 

 

About China Africa Resources

 

CAR is an AIM listed company, focused on the development of the Berg Aukas lead/zinc project in Northern Namibia.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUGGBAPUPPUMC
Date   Source Headline
12th Jun 20233:42 pmRNSCreditors’ Voluntary Liquidation
7th Jun 202311:01 amRNSTrading in Minto Shares Ceased
24th May 20235:22 pmRNSGeneral Meeting
18th May 20237:36 amRNSStatement re. Suspension
18th May 20237:30 amRNSSuspension - Pembridge Resources plc
16th May 20233:44 pmRNSMinto Directors
15th May 20235:45 pmRNSMinto Shares Suspended
15th May 20237:00 amRNSMinto Suspension of Operations
2nd May 20237:00 amRNSMinto Updates and New Terms Agreed with Pembridge
28th Apr 20237:00 amRNSAnnual Financial Report
27th Apr 202312:50 pmRNSMinto Q1 Production
20th Apr 202312:42 pmRNSYukon Inspector Direction
12th Apr 202311:54 amRNSMinto Exploration Result
6th Apr 202311:48 amRNSMinto - Financial and Production Results for 2022
16th Mar 20232:04 pmRNSMinto Skagway Port Developments
2nd Mar 20237:00 amRNSExtension to the CLN Term
28th Feb 202311:52 amRNSMinto Drilling Results
23rd Feb 202311:52 amRNSMinto Production for 2022
2nd Feb 202311:48 amRNSMinto Drilling Update
6th Jan 20237:09 amRNSMinto Receivable Update
20th Dec 202211:49 amRNSMinto Magnetotellurics survey
30th Nov 202211:43 amRNSMinto Announces Automatic Share Purchase
24th Nov 20229:51 amRNSDirector/PDMR Shareholding
18th Nov 20227:00 amRNSLoan Renewed
17th Nov 202211:47 amRNSMinto Q3 Results
20th Oct 202212:01 pmRNSMinto Exploration Results
13th Oct 20227:00 amRNSMinto Receipt Update
12th Oct 202211:38 amRNSMinto Q3 Production
13th Sep 20227:00 amRNSMinto Reclamation Costs Security
8th Sep 202210:33 amRNSHalf-year Report
23rd Aug 202211:40 amRNSMinto Metals Q2 Results
25th Jul 202212:33 pmRNSDirector/PDMR Shareholding
19th Jul 202211:42 amRNSMinto Q2 Production
4th Jul 20223:27 pmRNSHolding(s) in Company
30th Jun 20227:00 amRNSMinto Loan Repayment Received
29th Jun 202211:39 amRNSMinto AGM
23rd Jun 20227:00 amRNSResult of AGM
22nd Jun 202210:33 amRNSHolding(s) in Company
14th Jun 202211:54 amRNSChange of Registered Office
8th Jun 20225:35 pmRNSHolding(s) in Company
31st May 20227:00 amRNSIssue of Equity
26th May 202212:21 pmRNSMinto Q1 2022 Results
26th May 202212:06 pmRNSMinto Q1 2022 Results
23rd May 20225:01 pmRNSHolding(s) in Company
20th May 20221:43 pmRNSHolding(s) in Company
17th May 202211:45 amRNS4 Year Concentrate Offtake at Minto
29th Apr 20227:00 amRNSAnnual Financial Report
28th Apr 202211:31 amRNSMinto Drill Results
6th Apr 20224:22 pmRNSMinto Production Q1 2022
1st Apr 20228:04 amRNSMinto Full Year Results 2021

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.