Labola 43-101 Technical Report

6 Dec 2021 07:36

RNS Number : 6485U
Panthera Resources PLC
06 December 2021
 

6 December 2021

 

Panthera Resources Plc

("Panthera" or "the Company")

 

Labola 43-101 Technical Report

 

Panthera Resources Plc (AIM: PAT), the diversified gold exploration and development company with assets in West Africa and India, is pleased to announce that an independent technical report has been prepared for the Company's associate, Moydow Holdings Limited ("Moydow") in accordance with National Instrument 43-101 ("NI 43-101") for the Labola Gold Project in Burkina Faso ("Labola" or the "Project"). The report was prepared by Ivor Jones, an independent qualified person under NI 43 101, for Aurum Consulting.

 

There are no material differences in the Labola Report from those results disclosed in the Company's announcement dated 25 October 2021. The Mineral Resource Statement Prepared by Aurum Consulting for the Project is detailed below:

 

Table 1.0. Mineral Resource for the Labola Gold Project, 25 October 2021**

Category

Mineralization(Mt)

Gold grade(g/t Au)

Contained gold(koz)

Indicated Resource

5.41

1.52

264

Inferred Resource^

6.93

1.67

371

 

1. ** Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, marketing, or other relevant issues. The Mineral Resources in this note were reported using CIM (2014) Standards on Mineral Resources and Reserves, Definitions and Guidelines and adopted by CIM Council.

2. ^ The quantity and grade reported for the Inferred Resources in this estimation are uncertain in nature and there has been insufficient exploration to define this Inferred Resource as an Indicated or Measured Mineral Resource. It is uncertain if further exploration will result in upgrading the Inferred Resource to an Indicated or Measured Mineral Resource category.

3. The Mineral Resource has been constrained by an open pit evaluation using a gold price of $1900 per ounce, and then reported at a cut-off of 0.5 g/t Au.

4. Contained metal and tonnes figures in totals may differ due to rounding.

 

Moydow has estimated the amount of the resource that has been depleted by artisanal mining to be approximately 341,000 tonnes at 3 g/t Au. The quantity of mined material has been calculated from estimates of dump and leach pad volumes. The grade of the material mined has been estimated in the range of 1.5-3.0 g/t Au and is based on an evaluation of extensive rock chip, channel sampling of artisanal workings and selective sampling of adjacent dumps. The location of where the material has been mined from is not known with any degree of accuracy. As such, artisanal mining has not been deducted from the Mineral Resource but noted here for reference.

 

Three mineralized zones have been outlined from the various drilling programs and each zone is open in all directions. Extensive target generative work demonstrates many opportunities for resource expansion which include: i) extensions to the current pit-constrained resources; ii) zones with only widely spaced drilling; iii) extensions of known mineralized zones with no drilling; iv) untested artisanal sites; and v) potentially new mineralized zones indicated by geophysical and geochemical anomalies.

 

The mineral resource estimate (MRE) for the Labola Project has been prepared by Mr Ivor W.O. Jones, M.Sc., FAusIMM, P.Geo, of Aurum Consulting, who is an independent Qualified Person (QP) under NI 43-101 guidelines and directly undertook the preparation and estimation of the maiden mineral resource estimate. Mr Jones has over 35 years of relevant experience in geology, exploration, mining, resource evaluation and management including operational and consulting experience in both open pit and underground mines. He was previously a Group General Manager for Snowden Mining Industry Consultants where he was responsible for the company's geoscience activities globally.

 

A PDF version of the announcement, inclusive of images, can be found on the Company's website or by following the links below:

 

http://www.rns-pdf.londonstockexchange.com/rns/6485U_1-2021-12-6.pdf

pantheraresources.com/news/regulatory-news/

 

About Labola

 

The Labola project is owned and managed by Moydow. Panthera currently holds an equity interest of 44.1% in Moydow. A proposed restructure of Moydow and farm-in by Diamond Fields Resources Inc ("DFR") was announced on 25 August 2021. Amongst other terms and conditions:

· DFR has agreed to spend up to US$18 million (Earn-In) on Labola and increase its ownership interest up to 80%; and

· upon completion of the Earn-In, Panthera holds the right to increase its interest by 10%, for example, from 20% to 30%, for a cost of US$7.2 million.

 

The Labola gold exploration project is in the Banfora greenstone belt of the West African Birimian Supergroup in southwest Burkina Faso. It is located approximately 450km west-southwest of the capital, Ouagadougou, and 100km northeast of the Wahgnion gold mine, operated by Endeavour Mining (Q2, 2021 production of 41 000 ounces gold). 

 

More than 65,500m of historical drilling (541 holes) has been completed across multiple drilling campaigns by previous owners, High River Gold Mines Limited ("HRG"), later acquired by Nord Gold Plc, and Taurus Gold Limited ("Taurus"), consisting of principally diamond and RC drilling (24,589m/39,339m, respectively). Mineralisation has been intercepted by historical drilling and outlined by previous artisanal mining in three main zones over a 10 km strike length.

 

Moydow has explored the area since August 2020, including the acquisition and compilation of all previous data into a single database, interpretation of this data, target generation using the database and all the acquired remote sensing information, and a Reverse Circulation (RC) drilling program involving 31 holes.

 

The RC drilling programme comprised two parts: first, confirmatory "twin" drilling (24 holes, including one re-drill, for 3,804 metres) focused on the two better-defined zones of gold mineralisation identified by previous explorers; and second, exploration (5 holes, including one re-drill, for 721 metres) and infill (2 holes for 214 metres) drilling in two areas with no previous drilling, targeted to identify additional mineralisation. The results of the exploration drilling were announced by the Company on 14 September 2021.

 

The database of historical information has been audited, correctly coordinated and the twin drilling results demonstrate the validity of the previous data. The results of the Moydow drilling showed strong reproducibility of the HRG and Taurus drill data in both terms of location of mineralisation and grade. Further, the brownfields exploration drilling showed good predictability of the location of mineralisation in extensional drilling to the mineral resource. The HRG, Taurus and Moydow data was therefore taken as sufficiently accurate to be used in the estimation of the Maiden MREs for Labola.

 

Gold mineralisation at Labola is related to quartz veining, areas of silica alteration and disseminated pyrite. A previous ground IP survey highlighted the coincidence between mineralised zones and high chargeability (sulfides) and resistivity (quartz veining and silicification) anomalies. This correlation outlines many additional opportunities for resource expansion drilling in the future.

 

The main targets are along the major interpreted central shear system encompassing the three mineralised zones. There is also strong evidence that there are several sub-parallel, additional structures that also host significant gold mineralisation as shown by artisanal workings. These targets can be considered as clearly defined for drill testing. Many of the targets are resource expansion opportunities as they are obvious extensions to identified resources and include areas with only widely spaced historical drilling. Additional targets include untested zones with artisanal workings and new zones as defined by soil geochemistry and/or Induced Polarisation surveys. Labola, therefore, represents an advanced exploration project with clearly defined drill targets that provide opportunities for exploration and resource expansion.

 

 

Contacts

 

Panthera Resources PLC

Mark Bolton (Managing Director) +61 411 220 942

contact@pantheraresources.com

 

Allenby Capital Limited (Nominated Adviser & Broker) +44 (0) 20 3328 5656

John Depasquale / Vivek Bhardwaj (Corporate Finance)

 

Financial Public Relations

Vigo Consulting Ltd +44 (0)20 7390 0230

Oliver Clark / Chris McMahon

 

Subscribe for Regular Updates

 

Follow the Company on Twitter at: @PantheraPLC

 

For more information and to subscribe to updates visit: pantheraresources.com

 

Qualified Person

The technical information contained in this disclosure has been read and approved by Antony Truelove (BSc (Hon), MAusIMM, MAIG), who is a qualified geologist and acts as the Competent Person under the AIM Rules - Note for Mining and Oil & Gas Companies. Antony Truelove is the COO of Panthera Resources PLC.

 

The mineral resource estimate and associated technical information referred to in this disclosure has been read and approved by Mr Ivor W.O. Jones, M.Sc., FAusIMM, CPgeo, of Aurum Consulting, who is an independent Qualified Person (QP) under NI 43-101 guidelines.

 

Market Abuse Regulation (MAR) Disclosure

The information contained within this announcement is deemed by the Company to constitute inside information for the purposes of Regulation 11 of the Market Abuse (Amendment) (EU Exit) Regulations 2019/310. Upon the publication of this announcement via a Regulatory Information Service ("RIS"), this inside information is now considered to be in the public domain.

 

Forward-looking Statements

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterised by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties, and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes, and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events, or results not to be as anticipated, estimated, or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events, or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly, undue reliance should not be put on such statements due to the inherent uncertainty therein.

 

**ENDS**

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCUPGWWPUPGUMQ
Date   Source Headline
3rd Jun 20267:00 amRNS-ROnline Investor Webinar
29th May 20265:15 pmRNSTotal Voting Rights
21st May 20267:00 amRNSConversion of Options
6th May 20267:00 amRNSConversion of Options
30th Apr 20265:00 pmRNSTotal Voting Rights
14th Apr 20267:09 amRNSConversion of Options
9th Apr 20262:31 pmRNSIssue of Equity – In Lieu of Director Fees
2nd Mar 20267:00 amRNSArbitration Update
19th Jan 20267:00 amRNSBido Drilling Results
31st Dec 202512:45 pmRNSTotal Voting Rights
31st Dec 202512:45 pmRNSTotal Voting Rights
29th Dec 20257:00 amRNSHalf-year Financial Report
29th Dec 20257:00 amRNSHalf-year Financial Report
11th Dec 20257:00 amRNSWarrant Conversion
3rd Dec 20257:00 amRNSWarrant Conversion
1st Dec 20257:00 amRNSTotal Voting Rights
25th Nov 20258:59 amRNSWarrant Conversion
21st Nov 20257:00 amRNSKalaka Metallurgical Study Results
20th Nov 20252:00 pmRNSWarrant Conversion
17th Nov 20257:00 amRNSOTCQB Approval
12th Nov 20257:00 amRNSOTC Application
3rd Nov 202511:02 amRNSIssue of Equity - Warrant Conversion and Fees
31st Oct 20255:05 pmRNSTotal Voting Rights
29th Oct 20257:00 amRNSArbitration Update
16th Oct 20255:05 pmRNSWarrant Conversion
9th Oct 202510:31 amRNSWarrant Conversion
8th Oct 20257:00 amRNSArbitration Financing Facility Update
3rd Oct 202511:30 amRNSResult of AGM
29th Sep 20257:00 amRNSChange of Registered Office
18th Sep 20257:00 amRNSArbitration Update
29th Aug 20255:00 pmRNSTotal Voting Rights
27th Aug 20257:58 amRNS2025 Annual Financial Report
8th Aug 20257:00 amRNSOption Conversion
4th Aug 20257:00 amRNSCommencement of Cascades Feasibility Study
25th Jul 20257:32 amRNSWarrant Conversion
18th Jul 20257:00 amRNSBido Drilling
19th May 20257:00 amRNSUS$1.58 billion Claim for Damages
30th Apr 20255:00 pmRNSTotal Voting Rights
16th Apr 20253:54 pmRNSIssue of Equity - Warrant Conversion and Fees
31st Mar 20255:00 pmRNSTotal Voting Rights
27th Mar 20257:00 amRNSIssue of Equity - Conversion of Options
20th Mar 202510:37 amRNSWarrant Exercise
7th Mar 20255:35 pmRNSNotification of Major Holding
6th Mar 20254:45 pmRNSUpdate on Issue of Equity Fundraising
28th Feb 20255:32 pmRNSNotification of Major Holding
25th Feb 20257:47 amRNSResult of Placing and Subscription
24th Feb 20255:04 pmRNSIssue of Equity
21st Feb 20255:00 pmRNSWarrant Exercise
20th Feb 20256:11 pmRNSNotifications of Major Holdings
4th Feb 20257:00 amRNSMaiden JORC Resource Estimate for Kalaka Project