Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
16.37    -1.35 (-7.62%)
Bid:
16.42
Ask:
16.50
Spread: 0.08 (0.487%)
Market Cap: £238.66m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Wilson Update

18 Jun 2007 08:32

Pantheon Resources PLC18 June 2007 June 18, 2007 PANTHEON RESOURCES PLC First Zone at Wilson Declared Commercial •The Board of Pantheon Resources ("Pantheon") is pleased to announce that the first zone at Wilson has been declared commercial. This follows preliminary analysis of the successful test results announced on June 4, 2007. •Work is now underway to tie this well into the sales pipeline. This is scheduled to take approximately eight weeks to complete. •The Operator has indicated that this first zone alone is capable of producing at a gross rate between 2.5 to 3.5 million cubic feet a day ("mmcfd"), once tied-into the sales grid. Based on the Operator's view of the potential from the first zone at Wilson alone, this would increase Pantheon's net output over ten-fold. •The Operator has provided initial estimates of potential recoverable natural gas volumes for this zone alone. These are estimated to be between 8 to 20 billion cubic feet ("bcf"). •This compares with pre-drill gross best estimate potential reserves (previously described as "P50 potential reserves") of 9 bcf for the entire prospect as assessed by Pantheon's independent technical adviser. •It should be recognised that these reserve estimates are not definitive at this stage. This is attributable to the poor quality and incomplete nature of the electric logs obtained over the zone. A final assessment requires more production data, which will be acquired over the next few months. It will also necessitate the drilling of an appraisal well once this data has been collected and evaluated. •Testing of two of the remaining zones was not completed adequately. This was as a result of poor well conditions. •The Wilson partners decided that it was better to complete the well for commercial production in the bottom zone rather than persist with testing operations in poor well bore conditions. This strategy had the benefit of avoiding problems further up the well bore. The strong prevailing US gas prices also represented a major incentive to bring the lower Wilson zone into production as soon as possible. •Potential reserves in the other zones will be evaluated further in a subsequent appraisal/development well. These may add to the volumes already established. Testing results •Tests have been performed on two of the remaining three shallower zones. Electric logs provided strong indications of the presence of natural gas in one zone (second shallowest). Damage to this zone is believed by the Operator to account for the apparent failure to record any significant flows of fluids during testing. This impairment may have resulted from the material used to cure the lost circulation that occurred during drilling. Mechanical difficulties impeded the testing of the separate third zone. •Both of these zones will be re-investigated/tested in the appraisal well scheduled for later in 2007. These two zones still offer the potential for further reserves and production in addition to the first zone. The delineation well will be designed to avoid damaging the zone. •The fourth and shallowest zone flowed small amounts of natural gas and water and is not deemed commercial. •Tests of the first zone resulted in a peak flow of 3.3 million cubic feet of natural gas through a 10/64 inch choke. The well was shut in and the choke size reduced to 8/64 inches. It was then flowed for 27 hours and achieved a final rate of 1.8 million cubic feet per day of natural gas, 3 barrels of oil per day and 56 barrels of water per day. Flow tubing pressure was 6,007 psi. The small choke size combined with the high pressure regime provides the confidence behind the production rate estimate. •The Kindee ST 949 #1 well on the Wilson Structure was spudded on 7 February 2007 (Texas, USA). •Pantheon's working interest in Wilson is 31.77%, subject to final documentation. Pantheon's Chairman, Sue Graham said "Confirmation of the commercial potentialof Wilson represents a landmark in Pantheon's development. With initial reservepotential of the first zone alone indicated to be up to 20 bcf, the Company'sconservative pre-drill estimates of 9bcf have been far exceeded. Moresignificantly, it has also resulted in material upside. The short lead times toproduction have been confirmed with first natural gas sales scheduled to occurin approximately eight weeks. This, combined with strong US natural gas prices,should lead to early and significant cash flow for Pantheon over the comingmonths. Despite the importance of these results, it should not be overlooked that Wilsonstill offers the potential for increased reserves and, hopefully production, inthe future. Two of the three remaining zones have yet to be tested adequately,although strong indications of natural gas have been encountered in one of them.The difficulties encountered during drilling appear to have led to these zonesbeing damaged. Only the drilling of an appraisal well later this year will beable to determine fully the significance of these zones. Pantheon is set to be active for the rest of 2007. Apart from a Wilsonappraisal, a potential natural gas zone remains to be tested at Plum Deep. Inaddition, two wells are scheduled on the company's Project Wharton acreage laterthis year. Later this summer Pantheon also expects to spud the first well on itsnew project, Nottoway Dome, located in Louisiana close to Baton Rouge. Thisstructure has a potential for 35 mmboe in the Oligocene section and the companyhas a 7.5% working interest. In the event of success, this would also have amaterial impact on Pantheon." In accordance with the AIM Rules, the information in this report has beenreviewed and signed off by Mr Robert Rosenthal, (BSc Geology, MScGeology), Technical Director at Pantheon Resources Plc who has over 30 yearsrelevant experience within the sector. More information on Pantheon Resources may be found on its website www.pantheonresources.com. Contacts: Pantheon Resources PlcSue Graham, Chairman +44 20 7379 0118 Oriel Securities LimitedScott Richardson Brown +44 20 7710 7600 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
14th Dec 20225:00 pmRNSQuarterly Repayment of Unsecured Convertible Bonds
8th Dec 20227:00 amRNSReservoir modelling report from Schlumberger
18th Nov 20221:22 pmRNSBlock Listing Six Monthly Return
10th Nov 20227:00 amRNSAcquisition of Key Leases & Operational Update
25th Oct 20227:00 amRNSOperational Update, Alkaid #2 Well
3rd Oct 20224:22 pmRNSTotal Voting Rights
26th Sep 20227:00 amRNSOperational Update, Alkaid #2 Well
20th Sep 20227:00 amRNSDirector/PDMR Notification
13th Sep 20221:21 pmRNSQuarterly Repayment of Unsecured Convertible Bonds
7th Sep 20222:30 pmRNSPantheon Graduates to the OTCQX Best Market
6th Sep 20227:00 amRNSOperational and Corporate Update
23rd Aug 20222:36 pmRNSReplacement Theta West #1 – Independent VAS Report
23rd Aug 20227:00 amRNSTheta West #1 Well – Independent Expert VAS Report
18th Aug 20227:00 amRNSOperational Update, Alkaid #2 Well
29th Jul 20227:00 amRNSOperational Update, Alkaid #2 Well
7th Jul 20227:00 amRNSSpudding of Alkaid #2 Well
28th Jun 20227:00 amRNSTR-1: Notification of major holdings
14th Jun 202210:34 amRNSQuarterly Repayment of Unsecured Convertible Bonds
31st May 20221:10 pmRNSTotal Voting Rights
18th May 20229:53 amRNSBlock Listing Application to AIM
16th May 20227:00 amRNSRig Contract Executed & Investor Presentation
4th May 20227:00 amRNSPartial Conversion of Unsecured Convertible Bonds
25th Apr 20227:00 amRNSResource Upgrade
20th Apr 20227:00 amRNSUpcoming Webinar – Registration Details
6th Apr 202210:01 amRNSConfirmation of Upcoming Webinar
5th Apr 20225:58 pmRNSTR-1: Notification of major holdings
31st Mar 20227:00 amRNSInterim Results for Six Months Ended 31/12/21
24th Mar 20227:00 amRNSTheta West #1 Testing Update
15th Mar 20227:00 amRNSIssue of Equity
9th Mar 20229:35 amRNSQuarterly Repayment of Unsecured Convertible Bonds
4th Mar 20222:14 pmRNSConversion of Shares
4th Mar 20227:00 amRNSOperations Update
21st Feb 20227:00 amRNSOperational Update
18th Feb 20227:00 amRNSPartial Conversion of Unsecured Convertible Bonds
15th Feb 20227:00 amRNSTheta West #1 Operational Update
7th Feb 20227:00 amRNSTalitha #A Testing Update
24th Jan 20224:53 pmRNSWebinar
24th Jan 202212:17 pmRNSResult of AGM
24th Jan 20227:00 amRNSSpudding of Theta West #1 Well & Operations Update
20th Jan 20227:00 amRNSExercise of Warrants
19th Jan 20227:02 amRNSAnnual Grant of Share Options to Directors & Staff
19th Jan 20227:00 amRNSDirector/PDMR Notification
13th Jan 20227:00 amRNSIssue of Equity & Exercise of Share Options
12th Jan 20229:10 amRNSTheta West Drilling Permit Approval & AGM Webinar
7th Jan 202212:05 pmRNSAnnual General Meeting & Covid Precautions
6th Jan 20227:00 amRNSOperations Update
4th Jan 20227:00 amRNSTR-1: Notification of major holdings
17th Dec 20219:23 amRNSTR-1: Notification of major holdings
17th Dec 20217:00 amRNSOperations Update
16th Dec 20217:00 amRNSTR-1: Notification of major holdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.