Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
15.58    0.98 (6.71%)
Bid:
15.34
Ask:
16.00
Spread: 0.66 (4.302%)
Market Cap: £227.14m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Operations Update

4 Mar 2022 07:00

RNS Number : 6144D
Pantheon Resources PLC
04 March 2022
 

4th March 2022

 

Pantheon Resources plc

Operations Update

 

Pantheon Resources plc ("Pantheon" or "the Company"), the AIM-quoted oil and gas company with a 100% working interest in all of its oil projects spanning c. 153,000 acres adjacent and near to transportation and pipeline infrastructure on the Alaska North Slope, is pleased to provide the following update:

 

Talitha - Testing Update

The Company has suspended testing of the Shelf Margin Deltaic ("SMD") horizon. Operational focus will now move to the Theta West well site where the Company will commence testing operations of the 950 foot ("ft") Basin Floor Fan ("BFF") horizon.

The SMD is the shallowest and thus the final zone to test in the Talitha #A well bore. The well was perforated in the SMD from 6,965 ft to 6,975 ft and was successfully fracture stimulated. Immediately after the fracture stimulation, the test was suspended by a blizzard on the North Slope which shut down all operations for health and safety reasons. Flow testing operations resumed three days later.

Once flow testing commenced and before the well stopped flowing after a short period of time, only 45% of the fracture fluid was produced, with no formation water and small amounts of light high quality 34 degree API oil. Other than the small amounts of oil, no reservoir fluids were produced. The consensus among the Company and external consultants is that there is a blockage preventing any additional reservoir fluid from entering the well bore. Based on all the data, which includes a full suite of logs, sidewall cores, extensive Volatiles Analysis Service ("VAS") work undertaken by AHS/Baker Hughes over the past 12 months, and the testing of the lower zones this year, the Company's expectation for the SMD is that it should produce better than the two lower zones already tested; the Basin Floor Fan ("BFF") and Slope Fan System ("SFS") horizons, where the Company achieved excellent results.

The main priority for the remainder of the winter season is to allow sufficient time to satisfactorily test the BFF at Theta West, with operations expected to commence next week. The current unavailability of alternate testing equipment necessitates the movement of the Coil Tubing Unit and test equipment from Talitha to Theta West. This consequently limits the amount of time available for remedial work at Talitha. If time is available after testing the BFF at Theta West, the equipment will be relocated back to Talitha for additional remedial and testing operations. If, however, time does not permit this season, Pantheon will suspend testing at Talitha to return next season. The Company does not believe the issue encountered diminishes the potential for the SMD on its acreage.

Theta West Update

All remedial works within the well bore at Theta West have been successfully completed and the well is now ready for testing. The cement in the casing was drilled out and a new liner was set to Total Depth. The Nordic Calista #3 rig demobilization is planned for this weekend, preparing for the arrival of the testing equipment from Talitha.

Jay Cheatham, CEO, said: "Operating in Arctic conditions can be challenging and have caused operational issues which have impacted the testing of the SMD. We do, however, have excellent data on the SMD which we will continue to analyse and plan for further activities.

"In this strong oil price environment, many upstream companies operating in the oil and gas sector are facing equipment and logistics challenges with high equipment utilization rates. As we are well into the drilling season, we made an easy decision to suspend activity at Talitha to afford sufficient time to undertake thorough testing at the significant Theta West project.

"The next well in our programme is an Alkaid appraisal/production well this summer where we will get another look at the SMD zone and where we expect to penetrate several oil zones, drill a horizontal lateral wellbore and, if successful, put on a long term production test.

"We are now focused on operations at Theta West. Over the coming weeks, we will test what the Company believes is a significant oil accumulation after encountering over 950 feet of oil bearing sections in a large Basin Floor Fan system. Our team have prepared an extensive testing operation."

Bob Rosenthal, Technical Director, said: "Regardless of the operational challenges, I believe the potential of the SMD is undiminished. We plan further operations on the SMD at Talitha to remediate the issue either this season, time permitting, or next. Additionally, we will investigate the SMD at our Alkaid summer well.

"Despite the blockage encountered in the SMD, the Talitha well has been a great success for Pantheon, confirming the presence of movable, high quality light oil in both the Slope Fan System and the Basin Floor Fan, which has very significant implications for our acreage."

 

-Ends-

 

Further information:

 

Pantheon Resources plc

+44 20 7484 5361

Jay Cheatham, CEO

Justin Hondris, Director, Finance and Corporate Development

Canaccord Genuity plc (Nominated Adviser and broker)

Henry Fitzgerald-O'Connor, James Asensio

+44 20 7523 8000

BlytheRay

Tim Blythe, Megan Ray, Alice McLaren, Madeleine Gordon-Foxwell

+44 20 7138 3204

 

Notes to Editors

Pantheon Resources plc is an AIM listed Oil & Gas company focused on several large projects located on the North Slope of Alaska ("ANS"), onshore USA where it has a 100% working interest in 153,000 highly prospective acres with potential for multi billion barrels of oil recoverable. A major differentiator to other ANS projects is its close proximity to transport and pipeline infrastructure which offers a significant competitive advantage to Pantheon, allowing for materially lower capital costs and much quicker development times. The Group's stated objective is to create material value for its stakeholders through oil exploration, appraisal and development activities in high impact, highly prospective conventional assets, in the USA; a highly established region for energy production with infrastructure, skilled personnel and low sovereign risk. All operations are onshore USA, with drilling costs materially below that of offshore wells.

 

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) incorporated into, or forms part of, this announcement. The information contained within this announcement is considered to be inside information prior to its release.

The information contained within this Announcement is deemed by Pantheon Resources PLC to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 as it forms part of UK law by virtue of the European Union (Withdrawal) Act 2018 ("MAR").

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFXLLBLXLXBBD
Date   Source Headline
17th Jan 20198:16 amRNSStatement re Winx-1 Well
14th Jan 20191:41 pmRNSResult of AGM and General Meeting
14th Jan 20197:00 amRNSAcquisition of controlling interest in Vision
9th Jan 20197:00 amRNSUpdate on the Acquisition and Capital Raising
28th Dec 20181:45 pmRNSPosting of Circular and Notice of General Meeting
21st Dec 20182:09 pmRNSResult of Capital Raising
21st Dec 20187:02 amRNSPlacing, Subscription and Acquisition
21st Dec 20187:00 amRNSFinal Results for the Year Ended 30 June 2018
17th Dec 201810:52 amRNSProposed acquisition of controlling interest
4th Dec 20187:02 amRNSSecond Price Monitoring Extn
4th Dec 20187:01 amRNSPrice Monitoring Extension
3rd Dec 20184:40 pmRNSSecond Price Monitoring Extn
3rd Dec 20184:35 pmRNSPrice Monitoring Extension
28th Nov 20187:00 amRNSFirst production Tyler County
2nd Nov 20187:00 amRNSTyler County Pipeline Update
25th Oct 20187:00 amRNSChange of Adviser
22nd Oct 20187:00 amRNSDirectorate Change and Operational Update
6th Sep 20184:35 pmRNSPrice Monitoring Extension
24th Aug 20187:00 amRNSCorporate Update
9th Aug 201812:02 pmRNSPrice Monitoring Extension
7th Aug 20187:00 amRNSCorporate Update
20th Jul 20182:11 pmRNSHolding(s) in Company
16th Jul 20187:00 amRNSCorporate Update
2nd Jul 20184:40 pmRNSSecond Price Monitoring Extn
2nd Jul 20184:35 pmRNSPrice Monitoring Extension
14th Jun 20182:57 pmRNSDirector/PDMR Shareholding
14th Jun 20187:00 amRNSCorporate Update
5th Jun 20185:18 pmRNSCorporate Update
4th Jun 20187:00 amRNSOperational Update
14th May 201810:45 amRNSHolding(s) in Company
9th Apr 20188:36 amRNSRestoration - Pantheon Resources plc
9th Apr 20188:28 amRNSSuspension - Pantheon Resources Plc
9th Apr 20188:25 amRNSOperational Update
27th Mar 20187:00 amRNSInterim Results for the Six Months Ended 31/12/17
9th Mar 20187:00 amRNSOperational Update
23rd Feb 20187:00 amRNSOperational Update
9th Feb 20187:00 amRNSOperational Update
4th Jan 20183:25 pmRNSDirector/PDMR Shareholding
3rd Jan 20187:00 amRNSSpudding of VOBM#5 and Operational Update
21st Dec 20177:00 amRNSIncrease in working interest in the VOBM#5 well
15th Dec 201712:19 pmRNSResult of AGM
15th Dec 201710:00 amRNSAGM Statement
11th Dec 20177:07 amRNSOperational Update
6th Dec 20177:00 amRNSOperational Update
30th Nov 20177:00 amRNSOperational Update
22nd Nov 20177:00 amRNSFinal Results for the Year Ended 30 June 2017
15th Nov 20177:00 amRNSCommencement of First Gas Production
31st Oct 20177:00 amRNSOperational Update
11th Oct 20177:00 amRNSOperational Update
29th Sep 20177:00 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.