Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
14.02    -0.26 (-1.82%)
Bid:
14.02
Ask:
14.23
Spread: 0.21 (1.498%)
Market Cap: £204.40m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Operational Update

31 Mar 2009 09:10

RNS Number : 7815P
Pantheon Resources PLC
31 March 2009
 



Press release

 31 March 2009

Pantheon Resources plc - Bullseye Update

Pantheon Resources plc ("Pantheon" or the "Company"), the AIM-quoted oil and gas exploration company active in onshore Gulf of Mexicoprovides the following operational update on the Bullseye prospect. 

The Company has been informed by the operator that the Jumonville #2 well is currently at 12,575 feet and drilling ahead. The Miogyp formation has been penetrated with oil shows recorded on the mud logs. The hydrocarbon shows and results thus far are consistent with pre-drill estimates. 

The Jumonville #2 well has encountered approximately 20 feet of Miogyp sand formation. This sand has been confirmed as being up dip from the producing Miogyp interval in the Jumonville #1 well. Jumonville #2 is located some 1,000 feet from Jumonville #1. Results to date are consistent with Jumonville #1 and appear to confirm the distribution of the Miogyp reservoir across the field. Sidewall cores have been taken and will be evaluated in the coming weeks.

Oil and natural gas shows were also recorded in the Camerina interval. Further evaluation of this secondary objective is required to determine its significance. Drilling continues to the primary objective, the Cib Haz. The operator expects this to be reached over the coming week.

The deeper Cib Haz interval is contained in the same trapping mechanism as the proven Miogyp reservoir. It is thus considered by the operator to have a high probability of success, although it remains an exploration target. Seismic data indicate substantially thicker reservoir sand over a larger area in the deeper reservoir. Discoveries in the two objectives above the Cib Haz (Miogyp and Camerina) provide confidence for this deeper target.

The Cib Haz represents a major target and productive wells in the Cib Haz interval may be found eight miles west of Bullseye in the Bayou Sorrel Field. The reservoir in the Bayou Sorrel Field appears to have similar seismic appearance to the Bullseye reservoir with possible multiple stacked sandstone packages.

At this stage the indications of oil and natural gas in both the Camerina and Miogyp formations are encouraging. However the commercial significance remains to be determined. Once the well has reached total depth, electric logging, coring and testing will be undertaken over coming weeks. Total depth for the Jumonville #2 well is planned for approximately 14,200 feet.

In accordance with the AIM Rules, the information in this report has been reviewed and signed off by Jay Cheatham, who has over 30 years' relevant experience within the sector.

For further information on Pantheon Resources plc, see the website

at www.pantheonresources.com

Further information:

Pantheon Resources plc

Jay Cheatham, CEO

Justin Hondris, Director-Finance and Corporate Development

+44 20 7484 5359

Oriel Securities Limited

Michael Shaw

+44 20 7710 7600

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGIGDXIGXGGCB
Date   Source Headline
3rd Aug 20092:27 pmRNSHolding(s) in Company
31st Jul 20092:49 pmRNSHolding(s) in Company
21st Jul 20098:05 amRNSBullseye Project Update
30th Jun 20097:00 amRNSCommercial Production at Jumonville #2
25th Jun 20097:55 amRNSCorporate Update
15th Jun 20098:01 amRNSDrilling Update - Bullseye Prospect
5th Jun 20097:16 amRNSDrilling Update
29th Apr 20094:29 pmRNSCorporate Update
22nd Apr 20098:20 amRNSDrilling Update
14th Apr 20097:56 amRNSDrilling Update
7th Apr 20098:00 amRNSDrilling Update
6th Apr 20098:43 amRNSDrilling Update Replacement
6th Apr 20098:15 amRNSDrilling Update
2nd Apr 20093:31 pmRNSHolding(s) in Company
1st Apr 20099:48 amRNSHolding(s) in Company
31st Mar 20099:10 amRNSOperational Update
30th Mar 200911:52 amRNSHalf Yearly Report
18th Mar 20099:34 amRNSHolding(s) in Company
9th Mar 200912:40 pmRNSHolding(s) in Company
27th Feb 200910:43 amRNSHolding(s) in Company
24th Feb 200911:59 amRNSCompletion of Vision Rice University #1 Well
22nd Jan 20097:41 amRNSOperational Update
6th Jan 20098:00 amRNSOperational Update
23rd Dec 20088:16 amRNSBullseye Update
18th Dec 20084:49 pmRNSHolding(s) in Company
16th Dec 20085:27 pmRNSDirector/PDMR Shareholding
15th Dec 20083:56 pmRNSResult of AGM
15th Dec 20087:56 amRNSAGM Statement
9th Dec 200810:29 amRNSOil encountered at Acosta #1 Well
21st Nov 20089:26 amRNSNotice of AGM
19th Nov 20087:00 amRNSFinal Results
13th Nov 20087:00 amRNSDrilling Update
30th Oct 20087:50 amRNSDrilling Update
20th Oct 20087:00 amRNSDrilling Report
8th Oct 20088:10 amRNSDrilling Update
3rd Oct 200812:30 pmRNSAppointment of Executive Director
29th Sep 20087:00 amRNSDrilling Update
25th Sep 20087:54 amRNSDrilling Update
16th Sep 200812:24 pmRNSResult of EGM
12th Sep 20089:32 amRNSHolding(s) in Company
9th Sep 20088:09 amRNSOperations Update
2nd Sep 200812:44 pmRNSHolding(s) in Company
1st Sep 20088:39 amRNSHolding(s) in Company
1st Sep 20087:35 amRNSDrilling Update
28th Aug 20089:12 amRNSDrilling update
26th Aug 20086:18 pmRNSHolding(s) in Company
26th Aug 200811:20 amRNSEGM Notice
26th Aug 20087:00 amRNSDrilling Update
18th Aug 20087:00 amRNSDrilling Update
14th Aug 200810:16 amRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.