Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
13.52    -0.37 (-2.66%)
Bid:
13.51
Ask:
14.00
Spread: 0.49 (3.627%)
Market Cap: £197.11m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Operational Update - Dubhe-1

2 Dec 2025 07:00

RNS Number : 7846J
Pantheon Resources PLC
02 December 2025
 

 

2 December 2025

Pantheon Resources plc

Operational Update - Dubhe-1

 

Pantheon Resources plc (AIM: PANR, OTCQX: PTHRF) ("Pantheon" or the "Company"), the oil and gas company developing the Kodiak and Ahpun oil fields immediately adjacent to pipeline and transportation infrastructure on Alaska's North Slope, is providing an operational and cost update on the Dubhe-1 well.

Operational Update

Well clean-up operations at Dubhe-1 are progressing with production dominated by previously injected stimulation fluids. Intermittent oil production from Dubhe-1 commenced on 3rd November, and consistent small oil volumes commenced from around 19th November. Gas production volumes increased throughout this period. Thus far, approximately 40% of the injected water volume has been produced with steady gas production along with the modest production of light oil. The Company's closest analog to this well is the SMD-B interval in Alkaid-2 which was flow tested in 2023 and first measured oil production when a water volume equivalent to approximately 50% of the injected water volume had been produced. The Company plans to continue the well clean-up until a representative oil flow rate can be determined. Given that Dubhe-1 has multiple fracked stages, the clean-up profile may differ from the previous single zone completion as each stage may clean up at different points in time.

In May 2025, the Company expected that the cost for Dubhe-1 would be consistent with historical costs of approximately c.$10 million for drilling the well with a +/-5000 ft lateral/horizontal and approximately $15 million for the well completion. During final well planning and data gathering decisions, the Company chose to drill a pilot hole to allow core samples to be collected, to better refine the target landing zone and to penetrate the deeper Slope Fan System (SFS) as well as the shallower SMD-C reservoir target. The final cost for drilling and completing was approximately $33 million, including the pilot hole to enable evaluation of shallower and deeper horizons and acquisition of whole and sidewall cores.

Overall, this cost outcome, inclusive of full appraisal scope, contingency measures (e.g. standby drilling rig and coil tubing unit based on the experience at Alkaid-2), and inflationary pressures, does not detract from a solid operating performance. In addition, the construction of the new Dubhe pad, which will also be available for the drilling of future wells, cost $2.5 million. Clean-up, flow-back and well testing operational costs will be determined at the end of the programme.

Max Easley, Chief Executive Officer, commented: "I continue to be pleased with the ongoing safe and efficient execution of our operations to date and look forward to sharing more about Dubhe-1 results when we have them."

 

Further information:

 

Pantheon Resources plc

 

David Hobbs, Chairman

Max Easley, Chief Executive Officer

Justin Hondris, SVP, Investor Relations

contact@pantheonresources.com

 

 

 

 

Canaccord Genuity Limited (Nominated Adviser, and Joint Broker)

 

Henry Fitzgerald-O'Connor

James Asensio

Charlie Hammond

+44 20 7523 8000

 

 

 

 

 

Oak Securities (Joint Broker)

+44 20 3973 3678

Jerry Keen

Nick Price

 

 

BlytheRay (Corporate Communications)

+44 20 7138 3204

Tim Blythe

Megan Ray

Matthew Bowld

 

 

 

MZ Group (USA Investor Relations Contact)  

Lucas Zimmerman

Ian Scargill

 

+1 949 259 4987

 

 

 About Pantheon Resources

Pantheon Resources plc is an AIM listed Oil & Gas company focused on developing its 100% owned Ahpun and Kodiak fields located on State of Alaska land on the North Slope, onshore USA. Independently certified best estimate contingent recoverable resources attributable to these projects currently total c. 1.6 billion barrels of ANS crude and 6.6 Tcf of associated natural gas. The Company owns 100% working interest in c. 259,000 acres.

 

Pantheon's stated objective is to demonstrate sustainable market recognition of a value of approximately $5 per barrel of recoverable resources by end 2028. This is based on bringing the Ahpun field forward to FID and producing into the TAPS main oil line (ANS crude) by the end of 2028. The Gas Sales Precedent Agreement signed with AGDC provides the potential for Pantheon's natural gas to be produced into the proposed 807 mile pipeline from the North Slope to Southcentral Alaska during 2029. Once the Company achieves financial self-sufficiency, it will apply the resultant cashflows to support the FID on the Kodiak field planned, subject to regulatory approvals, targeted by the end of 2028 or early 2029.

 

A major differentiator to other ANS projects is the close proximity to existing roads and pipelines which offers a significant competitive advantage to Pantheon, allowing for shorter development timeframes, materially lower infrastructure costs and the ability to support the development with a significantly lower pre-cashflow funding requirement than is typical in Alaska. Furthermore, the low CO2 content of the associated gas allows export into the planned natural gas pipeline from the North Slope to Southcentral Alaska without significant pre-treatment.

 

The Company's project portfolio has been endorsed by world renowned experts. Netherland, Sewell & Associates estimate a 2C contingent recoverable resource in the Kodiak project that total 1,208 mmbbl of ANS crude and 5,396 bcf of natural gas. Cawley Gillespie & Associates estimate 2C contingent recoverable resources for Ahpun's western topset horizons at 282 mmbbl of ANS crude and 803 bcf of natural gas. Lee Keeling & Associates estimated possible reserves and 2C contingent recoverable resources of 79 mmbbl of ANS crude and 424 bcf natural gas.

 

For more information visit www.pantheonresources.com.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDDXBDDCGGDGUB
Date   Source Headline
25th Feb 202011:01 amRNSFinal Results for the Year Ended 30 June 2019
20th Feb 20207:00 amRNSPublication of Annual Results
20th Feb 20207:00 amRNSPublication of Annual Results
30th Jan 20207:00 amRNSNew Project OIP estimate and Company presentation
23rd Jan 20207:00 amRNSResource Update
2nd Jan 20207:30 amRNSSuspension - Pantheon Resources plc
2nd Jan 20207:00 amRNSPublication of Audited Financial Results
12th Dec 20197:07 amRNSAcquisition of key leases in Alaska's North Slope
15th Nov 20194:40 pmRNSSecond Price Monitoring Extn
15th Nov 20194:35 pmRNSPrice Monitoring Extension
6th Nov 20197:01 amRNSCompany Update
17th Oct 20197:00 amRNSAcquisition of Halliburton 25% WI in Alkaid/Phecda
2nd Oct 20197:59 amRNSAppointment of Non-Executive Director
24th Sep 201910:00 amRNSPantheon Resources Alaskan Project Update and Q&A
12th Sep 201912:32 pmRNSInvitation to Alaskan Project Update and Q&A
2nd Sep 20195:25 pmRNSDirector/PDMR Shareholding
14th Aug 201912:11 pmRNSIssue of Equity
9th Aug 20192:45 pmRNSTR-1: Notification of major holdings
5th Aug 20197:00 amRNSOpening of Data Room and Farmout Process
26th Jul 201911:18 amRNSHolding(s) in Company
19th Jul 201912:48 pmRNSResult of Capital Raising
19th Jul 20198:06 amRNSClose of Capital Raising
18th Jul 20194:58 pmRNSProposed Placing and Subscription of US$6.5million
12th Jul 20197:00 amRNSAlaskan Update
25th Jun 20193:25 pmRNSCorporate Presentation June 2019
24th Jun 20197:00 amRNSPartnership with High-Tech Geophysics specialist
6th Jun 20197:00 amRNSResource upgrade - Alkaid prospect
5th Jun 20197:00 amRNSCEO Q&A podcast confirmed
30th May 20197:00 amRNSUpdate on timing of CEO Q&A podcast
20th May 20197:00 amRNSAlaskan update and notification of CEO Q&A podcast
14th May 20194:40 pmRNSSecond Price Monitoring Extn
14th May 20194:35 pmRNSPrice Monitoring Extension
2nd Apr 20197:19 amRNSAlkaid Well Update
28th Mar 20197:00 amRNSInterim Results for the Six Months Ended 31/12/18
25th Mar 20197:54 amRNSAlkaid Well - successful flow test
20th Mar 20197:00 amRNSOperational Update
18th Mar 201910:19 amRNSPassing of John Walmsley, Non-executive Director
13th Mar 20197:00 amRNSWinx-1 Exploration Well drilling update
12th Mar 20195:07 pmRNSDirector's interest in shares
11th Mar 20197:00 amRNSAppointment of Technical Director
6th Mar 20197:00 amRNSOperational update: Winx-1 and Alkaid wells
4th Mar 20197:00 amRNSWinx-1 Exploration Well drilling update
1st Mar 20197:45 amRNSWinx-1 Exploration Well drilling update
25th Feb 20197:00 amRNSUpdate on Alkaid Well, Alaska
18th Feb 20197:26 amRNSSpudding of Winx-1 well in Alaska
21st Jan 20194:40 pmRNSHolding(s) in Company
21st Jan 20198:49 amRNSCompletion of the Great Bear Acquisition
17th Jan 20198:16 amRNSStatement re Winx-1 Well
14th Jan 20191:41 pmRNSResult of AGM and General Meeting
14th Jan 20197:00 amRNSAcquisition of controlling interest in Vision

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.