Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
13.52    -0.37 (-2.66%)
Bid:
13.51
Ask:
14.00
Spread: 0.49 (3.627%)
Market Cap: £197.11m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Operational Update

25 Mar 2015 07:07

RNS Number : 3967I
Pantheon Resources PLC
25 March 2015
 



 

 

 

Press release

Date: 25 March 2015

 

OPERATIONAL UPDATE

 

 

Pantheon Resources plc ("Pantheon or "the Company"), the AIM-quoted oil and gas company with a 50% working interest in several projects within Tyler and Polk Counties, East Texas, provides the following operational update:

 

Drilling Timetable

 

Pantheon is pleased to announce that the JV has agreed heads of terms for the contracting of a suitable rig for the drilling of two wells in its upcoming drilling programme. The severe weather conditions of recent weeks, which have included torrential rainfall and localised flooding in certain areas of East Texas where drilling is planned, have resulted in what is expected to be a modest delay to the start of operations at the drilling site. Standing water has made access roads impassable for heavy equipment. Once the standing water subsides and conditions are suitable, the rig will be formally contracted and site preparation and drilling can start. Once the rig contract is signed it begins to incur standby charges so it is imprudent to sign the contract until ground conditions improve. Based on current weather forecasts it is possible this could be within the next two to three weeks.

 

The first well in the programme is located on the JV's original Tyler County acreage and will offset the LP2 production well located on the JV acreage(1). The first well has been repositioned from the original Kara Farms location to a seismically defined location deeper into the heart of the same structure, yet still offsetting the LP2 well. Importantly, this location offers two separate and independent targets:

 

(1) The Woodbine/Eagleford Sandstone (the primary target), and

(2) The Austin Chalk (the secondary target). The Austin Chalk is considered by the Operator (Vision Resources LLC) to be a development play, de-risked by neighbouring, analogous wells having enjoyed a 93% commercial success rate(2).

 

The second well location is planned to be drilled immediately following the first well and is located on the JV's Polk County acreage, both west and adjacent to the prolific Double A Wells field. The Double A Wells field has produced 20 million barrels of oil and 415 Billion Cubic feet of gas to date. The second well location appears geologically analogous to the Double A wells field for the target Woodbine/Eagleford sandstone reservoir.

 

Both targets have been selected following the completion of an extensive geological study completed in conjunction with the Bureau of Economic Geology at the University of Texas, Austin over a period of three years. This study identified the key ingredients for the successful identification and exploitation of the Woodbine/Eagleford sandstone in the area.

 

Of particular importance in the context of the recent falls in oil and gas prices, is that both wells are conventional and if successful, are forecast to be economic below current commodity prices. Additionally, the JV acreages are located onshore East Texas in an area of abundant infrastructure and low transportation costs.

 

 

Jay Cheatham, CEO, said, "It is frustrating that unseasonally heavy rainfall has delayed the start of our drilling programme but that is unfortunately outside our control. The JV has been meticulous in selecting the optimum rig, crew and site location for this pivotal event in the company's history at sensible commercial terms. As I have said before, this is one of the most exciting plays that I have been associated with in my 30 years in the oil and gas business, one backed by substantial science and geological analysis. We are keenly looking forward to finally implementing this great opportunity and I am hopeful that we will see activity as early as April."

 

(1) Pantheon has no financial interest in the LP2 well because it was drilled prior to Pantheon joining the joint venture.

(2) Operator estimate

 

 

 

 

Further information:

 

Pantheon Resources plc

Jay Cheatham, CEO

Justin Hondris, Director, Finance and Corporate Development

+44 20 7484 5359

 

 

Stifel Nicolaus Europe Limited (Nominated Adviser and broker)

Michael Shaw

Ashton Clanfield

+44 20 7710 7600

 

FTI Consulting

Ed Westropp

Shannon Brushe

James Styles

+44 20 3727 1000

 

 

 

 

For further information on Pantheon Resources plc, see the website at: www.pantheonresources.com

 

 

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
IMSGRGDXXGDBGUU
Date   Source Headline
9th Aug 20177:00 amRNSOperational Update
3rd Aug 20174:56 pmRNSDirector/PDMR Shareholding
28th Jul 20177:18 amRNSResults of Placing
27th Jul 20175:00 pmRNSUS$12.5 million Proposed Placing
24th Jul 20177:00 amRNSOperational Update
14th Jul 20177:05 amRNSOperational Update
27th Jun 201710:40 amRNSHolding(s) in Company
6th Jun 20172:16 pmRNSHolding(s) in Company
31st May 20174:57 pmRNSHolding(s) in Company
24th May 20173:12 pmRNSDirector/PDMR Shareholding
19th May 20175:37 pmRNSOperational Update & Investor Conference Call
19th May 201712:00 pmRNSOperational Update & Investor Conference Call
10th May 201712:22 pmRNSHolding(s) in Company
7th Apr 20175:24 pmRNSHolding(s) in Company
31st Mar 20177:00 amRNSInterim Results
27th Mar 201712:01 pmRNSHolding(s) in Company
15th Mar 20177:00 amRNSNotice of Interim Results and Operational Update
26th Jan 20177:00 amRNSDrilling Update
6th Jan 20177:00 amRNSDirector/PDMR Shareholding
30th Dec 20167:00 amRNSOperational Update
16th Dec 20163:20 pmRNSResult of AGM
16th Dec 20169:49 amRNSAGM Statement
12th Dec 20167:00 amRNSAppointment of Independent Non-Executive Director
29th Nov 20167:08 amRNSOperational Update
23rd Nov 20167:00 amRNSFinal Results
1st Nov 20168:05 amRNSSpudding of VOBM#4 Well
25th Oct 20167:00 amRNSSuccessful conclusion of VOBM#3 drilling
26th Sep 20165:30 pmRNSHolding(s) in Company
13th Sep 20167:00 amRNSOperational Update
5th Sep 20167:00 amRNSOperational Update
2nd Aug 20161:37 pmRNSChange of Registered Office
19th Jul 20167:00 amRNSAcquisition of Increased Working Interest
8th Jul 20167:00 amRNSOperational Update
27th Jun 20163:19 pmRNSHolding(s) in Company
1st Jun 20167:00 amRNSUpdate on VOS#1 Well
17th May 20167:00 amRNSOperational Update
25th Apr 20167:00 amRNSOperational Update
30th Mar 20167:00 amRNSInterim Results
9th Mar 20167:00 amRNSResult of Placing
8th Mar 20164:45 pmRNSProposed Placing
29th Feb 20167:00 amRNSOperational Update
22nd Jan 20167:00 amRNSTesting and Production Update
12th Jan 20167:00 amRNSVOS#1 Well - Testing Update
15th Dec 20156:07 pmRNSResult of AGM
15th Dec 201510:00 amRNSAGM Statement
3rd Dec 20157:00 amRNSCompletion of Drilling on VOS#1 Well
20th Nov 20157:00 amRNSAnnual Financial Report
28th Oct 20157:00 amRNSCompletion of Testing at VOBM#1 Well
22nd Oct 20157:00 amRNSOperational Update
8th Oct 20157:00 amRNSCommencement of testing operations

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.