Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 30.15
Bid: 30.10
Ask: 30.25
Change: 0.25 (0.84%)
Spread: 0.15 (0.498%)
Open: 29.10
High: 30.30
Low: 29.10
Prev. Close: 29.90
PANR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

13 Aug 2009 07:00

RNS Number : 3617X
Pantheon Resources PLC
13 August 2009
 



Press release

Date: 13 August, 2009

Pantheon Resources plc ("Pantheon" or "the Company"), the AIM-quoted oil and gas exploration company active in Louisiana and Texas, issues the following update:

Vision Rice University #1, Tyler CountyEast Texas (25% Working Interest)

The operator, Vision Resources LLC, believes it now understands the various causes behind the mechanical difficulties encountered in drilling and completing the Vision Rice University #1 well, which have led to continued delays. Initially these related to the higher than expected pressure regime encountered. More recently, there is strong evidence to suggest that the well may have penetrated an "unconsolidated rubble zone". The presence of this potential zone was imperceptible on the seismic available to the joint venture prior to drilling. Such zones are known to exist elsewhere in the Austin Chalk. 

The existence of an unconsolidated rubble zone would be extremely encouraging for the project. Such zones typically exhibit higher permeability and porosity. These usually lead to both enhanced recovery and flow rate per well. If confirmed, these factors would have a significant and beneficial impact on the project's economics. Additionally, during the very limited testing operations performed, the well produced natural gas, condensate and black oil. 

The information gathered from the current well should facilitate the drilling of future wells on the project. In particular, it should result in subsequent wells being drilled at a lower cost than originally expected, despite the mechanical problems contributing towards additional time and cost overruns in this well. Lower potential future drilling costs would also enhance the project's economics.

As previously announced, during clean-out operations following the setting of the packer and the production liner, the well bore became blocked. The operator utilised a coiled tubing unit in an attempt to remove the blockages. During these procedures, small pieces of formation flowed through the slotted liner into the well bore resulting in a new obstruction. This occurred each time the well was cleaned out. Such experiences are consistent with the presence of an unconsolidated rubble formation. Eventually the blockages prevented the extraction of the coiled tubing from the hole. 

The operator has now formalised a plan for remedial operations. It has elected to employ a high pressure snubbing unit in an attempt to remove the stuck coiled tubing. The plan is to then cement the upper zone to prevent further migration of pebbles and fine sediments into the well bore, before undertaking clean-out and completion operations. This operation is estimated to take two to three weeks on a trouble free basis to complete once the snubbing unit is on location.

Jay Cheatham, CEO of Pantheon Resources, stated, "I am very excited by the potential presence of an unconsolidated rubble zone and its positive implications for the overall project. Such a zone may enable the joint venture to drill fewer wells at an overall lower cost to achieve the expected production rates and recoverability. Significantly, these factors should lead to enhanced overall project economics. Further, the presence of a rubble zone would explain a number of the difficulties experienced in completing this ultra high pressure chalk well."

In accordance with the AIM Rules, the information in this announcement has been reviewed and signed off by Jay Cheatham, who has over 30 years' relevant experience within the sector.

For further information on Pantheon Resources plc, see the website at www.pantheonresources.com

 

Further information:

Pantheon Resources plc

Jay Cheatham, CEO

Justin Hondris, Director, Finance and Corporate Development

+44 20 7484 5359

Oriel Securities Limited (Nominated Adviser)

Michael Shaw

+44 20 7710 7600

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSFUFUESUSEEA
Date   Source Headline
4th Jun 20078:12 amRNSWilson Test Result
29th May 20079:40 amRNSWilson Drilling Update
22nd May 20078:33 amRNSWilson Drilling Update
21st May 20077:30 amRNSAddition to portfolio
16th May 20077:49 amRNSDrilling Update on Wilson
14th May 20074:03 pmRNSHolding(s) in Company
10th May 20078:47 amRNSProduction Update- April 2007
3rd May 200710:50 amRNSHolding(s) in Company
2nd May 20078:19 amRNSHolding(s) in Company
27th Apr 20072:03 pmRNSHolding(s) in Company
20th Apr 20077:01 amRNSWilson Drilling Update
11th Apr 20077:01 amRNSProduction Update-March 2007
10th Apr 20077:43 amRNSNatural Gas Encountered
5th Apr 20077:01 amRNSDrilling Report
30th Mar 20076:06 pmRNSInterim Results
29th Mar 200710:55 amRNSProject Wharton Spudded
23rd Mar 20077:45 amRNSPadre Island Leases Update
15th Mar 20077:01 amRNSWilson Drilling Update
8th Mar 200711:45 amRNSProduction Update
6th Mar 20071:46 pmRNSHolding(s) in Company
2nd Mar 20077:30 amRNSExploration Update
26th Feb 20078:01 amRNSExploration update
13th Feb 20079:51 amRNSCaddo Onstream/Wharton update
9th Feb 20073:36 pmRNSAGM Statement
8th Feb 20079:39 amRNSSpudding of Wilson Prospect
5th Feb 20073:43 pmRNSHolding(s) in Company
1st Feb 20074:39 pmRNSHolding(s) in Company
1st Feb 20079:14 amRNSUpdate on Wilson Prospect
29th Jan 20074:13 pmRNSHolding(s) in Company
10th Jan 20077:00 amRNSDrilling Report
9th Jan 20078:40 amRNSDrilling Report
2nd Jan 20077:08 amRNSSpudding of Kant
2nd Jan 20077:04 amRNSPlum Deep Drilling Update
28th Dec 200610:29 amRNSAnnual Report and Accounts
27th Dec 200610:50 amRNSFinal Results
21st Dec 20067:01 amRNSPadre Island Testing Update
19th Dec 20067:01 amRNSProject Wharton Update
18th Dec 200610:27 amRNSTotal Voting Rights
13th Dec 20067:01 amRNSPadre Island Testing Update
5th Dec 20067:46 amRNSPlum Deep Testing Programme
30th Nov 20067:01 amRNSPlum Deep Well Logs Completed
20th Nov 20069:13 amRNSDrilling Update
16th Nov 20067:02 amRNSPlum Deep Drilling Update
7th Nov 20067:01 amRNSDrilling Update-Padre Island
31st Oct 20069:43 amRNSDrilling Report
27th Oct 20067:00 amRNSDrilling update- Padre Island
19th Oct 20068:32 amRNSPlum Deep Drilling Update
17th Oct 20069:01 amRNSCaddo #1 Well Result
11th Oct 20067:00 amRNSPlum Deep Drilling Update
9th Oct 20067:00 amRNSDrilling update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.