Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPanther Metals Regulatory News (PALM)

Share Price Information for Panther Metals (PALM)

Share Price is delayed by 15 minutes
Get Live Data
157.50    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 5.00 (3.226%)
Market Cap: £13.80m
PALM Live PriceLast checked at - London Stock Exchange

Intraday Panther Metals Share Chart

Canada - Assets Update

4 May 2021 07:00

RNS Number : 3284X
Panther Metals PLC
04 May 2021
Β 

NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY IN OR INTO AUSTRALIA, CANADA, JAPAN, THE REPUBLIC OF SOUTH AFRICA, THE UNITED STATES OR ANY OTHER JURISDICTION WHERE TO DO SO WOULD CONSTITUTE A VIOLATION OF THE RELEVANT LAWS OF SUCH JURISDICTION

FOR IMMEDIATE RELEASE

Β 

PANTHER METALS PLC

("Panther" or the "Company")

(Incorporated in the Isle of Man with company numberΒ 009753V)

4 May 2021

Canada - Dotted Lake Drilling Permit Issued and Big Bear Update

Panther Metals PLC (LSE:PALM) the company focused on mineral exploration in Canada and Australia, is pleased to provide exploration permitting updates for the Dotted Lake property and Big Bear Project in the Province of Ontario Canada.

Β 

Darren Hazelwood, Chief Executive Officer, commented:

Β 

"We are very pleased to announce the receipt of a renewed Dotted Lake Exploration Permit which extends our exploration permissions by 3 years to April 2024 and increases our potential scope for additional work without the requirement for additional applications. This new permit allows us to progress our new and updated plans for up to 8 diamond drill holes,Β ground IP geophysics and revised trenching plans over the high-grade gold target confirmed by our fieldwork last autumn. This receipt now facilitates us to move our revised plans forward and we are currently engaging with potential contractors with a view to drill at the earliest opportunity.

Β 

At Big Bear the results of last year's airborne geophysics, ground reconnaissance and mapping has warranted two further Exploration Permit Applications for induced-polarisation geophysics and reconnaissance drilling over compelling targets in the vicinity of the historical Jedder gold mine in the southeast of the Big Bear Project and in the north of the project over compelling electromagnetic and structural targets.

Β 

Strategically as a business we are now able to focus on our highly prospective Canadian assets and having this new permit in place for Dotted Lake, additional applications submitted on the Big Bear project, we now look forward to an extremely busy few months ahead as we focus on our exploration activities. I look forward to providing further details in due course."

Β 

Further to the announcement of 14 December 2020, Panther has received a new Exploration Permit (number PR-20-000376) to proceed with the revised plans for reconnaissance diamond drilling, ground induced polarisation ("IP") geophysics and trenching focussed on testing intrusive contact shear-zone hosted gold mineralisation in the vicinity of the north shore of Dotted Lake. Panther's reconnaissance sampling in historical trenches at this locality confirmed high-grade gold at surface (announced 5 November 2020) in an area that has never been drill-tested. Panther is now actively engaging with geophysical and drilling contractors with a view to embarking on the work following the snow thaw. Panther's new Dotted Lake Exploration Permit replaces an Exploration Permit (PR-18-000152) dated November 2018 in light of the airborne geophysics survey results, fieldwork, and interpretation. The new permit will allow Panther to drill up to 8 diamond drill holes this season where initial results warrant. The new permit extends these exploration permissions for three years to 26 April 2024.

Β 

At the Big Bear Project Panther has submitted a further two Exploration Permit Applications which will facilitate reconnaissance drill testing and ground IP geophysics across key prospective targets which have emerged from the results of the airborne electromagnetic ("AEM") and magnetics ("Mag") survey completed in August 2020 and the autumn 2020 fieldwork programme. The Big Duck Creek Permit Application will allow testing of high priority AEM and Mag targets in the 'Big Duck Creek' area to the north and west of Little Bear Lake, in the north of the project area.

Β 

The Hays Lake East Permit Application area overlies the interpreted northern intrusive contact of the Terrace Bay Batholith, targeting the Joa-Walton gold occurrence and potential eastern extensions to the historical Jedder gold mine. This application focusses on claims Panther acquired last year (announced 13 July 2020) which includes the Jedder mine and mill, which was intermittently worked between 1934-1986, with gold bearing quartz veins by open cuts up to 15m deep site. Historical gold production was not reported but channel sampling of an 87m long section of the Mill Vein in 1984 reportedly yielded values up to 39.50g/t Au & 73.17 g/t Ag over 0.5m.

Β 

The Joa-Walton occurrence includes at least three quartz veins which were assayed up to 210g/t Au & 258g/t Ag by government Resident Geologist sampling visits in 1988 and 1989. This work also noted that as well as gold in the en echelon lenticular quartz veins, associated quartz feldspar porphyry dikes and stocks were also gold mineralised with assays returning up to 6.36g/t Au. Panther's sampling at Joa-Walton returned assays up to 25g/t Au for a 17cm wide quartz vein, with further structural mapping work and ground geophysics recommended to determine the structural relationships between the intrusives and high-grade veins. Disseminated gold mineralisation in intrusives, in combination with the high-grade quartz veins opens the potential for a larger scale deposit, which Panther intends to test through three-dimensional geophysical modelling and drilling.

Β 

Further details on the work elements approved under the Dotted Lake Exploration Permit and the two Big Bear permit applications are outlined below.

Β 

Permitting Details

Β 

Dotted Lake Exploration Permit PR-20-000376

Β 

Allows permitted activities to be undertaken over a three-year period between 27/4/2021 and 26/04/2024 on Dotted Lake claim numbers 548354, 548355, 548356, 548357 and 548358. Replaces previous (2018) Dotted Lake Exploration Permit (PR-18-000152) in light of current claim focus and revised drilling plans.

Β 

Permitted activities:

β€’ Mechanised drilling. Provision for an initial 8 planned diamond drill collars to step-out along strike of any positive drill intersections.

β€’ Mechanised stripping. Allowance for a total 2,500m2 of ground cover stripping to facilitate bedrock mapping and structural interpretation.

β€’ Pitting and trenching. Covers 7 planned trenches to provide strike cross-sections across the target shear zone.

β€’ Ground geophysics incorporating the use of a generator. Planned work includes an initial 2.5-line km of IP survey across the sheared contact.

β€’ Construction of access roads and survey line cutting.

β€’ Permitted fuel storage for drill rig, vehicles, and generators.

Β 

Big Duck Creek Permit Application

Β 

Lodged for Multicell Mining Claims 546085 and 566379.

Β 

Requested activities:

β€’ Mechanised drilling. Provision for up to 10 planned priority 1 diamond drill collars with a further proposed 9 drill pad locations preplanned to follow-up on encouraging results.

β€’ Ground geophysics incorporating the use of a generator. Planned work includes an initial 5-line km of IP survey arranged over 9 planned survey lines.

β€’ Construction of access roads and survey line cutting.

β€’ Permitted fuel storage for drill rig, vehicles and generators and construction of a temporary personnel camp.

Β 

Hays Lake East Permit Application

Β 

Lodged for Multicell Mining Claims 566392 and 537571 and Single Cell Mining Claim 569210.

Β 

Requested activities:

β€’ Mechanised drilling. Provision for up to 5 planned priority 1 diamond drill collars with a further proposed 4 drill pad locations preplanned to follow-up on encouraging results.

β€’ Ground geophysics incorporating the use of a generator. Planned work includes an initial 2.5-line km of IP survey arranged over 5 planned survey lines.

β€’ Construction of access roads and survey line cutting.

β€’ Permitted fuel storage for drill rig, vehicles and generators and construction of a temporary personnel camp.

Β 

Β 

For further information please contact:

Β 

Β 

Panther Metals PLC:

Darren Hazelwood, Chief Executive Officer: +44(0) 1462 429 743

+44(0) 7971 957 685

Mitchell Smith, Chief Operating Officer: +1(604) 209 6678

Broker:

SI Capital Limited

Nick Emerson +44(0) 1438 416 500

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.Reach is a non-regulatory news service. By using this service an issuer is confirming that the information contained within this announcement is of a non-regulatory nature. Reach announcements are identified with an orange label and the word β€œReach” in the source column of the News Explorer pages of London Stock Exchange’s website so that they are distinguished from the RNS UK regulatory service. Other vendors subscribing for Reach press releases may use a different method to distinguish Reach announcements from UK regulatory news.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
Β 
END
Β 
Β 
NRAAJMRTMTMMBPB
Date   Source Headline
1st Dec 20227:00 amRNSManitou Lakes: Soil Results extend Barker Prospect
24th Nov 20227:00 amRNSDrilling Completion at Obonga and Issue of Equity
27th Oct 202212:48 pmEQSPanther Metals ramps up drill activity at Obonga as it searches for discovery
25th Oct 20227:00 amRNSDrilling Commenced - Obonga
19th Oct 20229:18 amRNSAppointment of drilling contractors
18th Oct 20227:00 amRNSSecond Soil Programme Commences at Manitou Lakes
11th Oct 20227:00 amRNSObonga Drilling Programme On Schedule
29th Sep 20227:00 amRNSPanther Australia Burtville East Drill Results
27th Sep 20227:00 amRNSHalf-year Report
21st Sep 20229:02 amRNSManitou Lakes High Grade Gold Discovered in Soils
13th Sep 20227:00 amRNSDotted Lake Project - New Nickel Target Outlined
22nd Aug 20227:00 amRNSHolding(s) in Company
18th Aug 20228:02 amRNSIssue of Equity
15th Aug 202212:31 pmRNSPublication of a Prospectus
2nd Aug 202212:13 pmRNSConditional Placing - Replacement
2nd Aug 20227:00 amRNSConditional Placing to raise £1,148,000
27th Jul 20229:22 amRNSPanther Australia - Burtville East update
21st Jul 20229:58 amRNSObonga Permit Granted
14th Jul 20228:36 amRNSPanther ASX - Burtville Assays
27th Jun 20227:53 amRNSPanther Metals Ltd - Maiden Resource at Coglia
9th Jun 202210:27 amRNSResult of AGM
6th Jun 20227:00 amRNSHolding(s) in Company
16th May 20227:00 amRNSNotice of AGM
12th May 20227:00 amRNSPanther Australia reports Coglia Assays
3rd May 20227:00 amRNSDrilling update - Panther Australia
29th Apr 20228:38 amRNSFinal Results for year ended 31 December 2021
26th Apr 20227:00 amRNSObonga Exploration Permit Application
21st Apr 20224:20 pmRNSBig Bear Exploration Permits
7th Apr 20227:15 amRNSPurchase of Shear Gold Project
7th Apr 20227:00 amRNSDisposal
28th Mar 20229:05 amRNSHolding(s) in Company
23rd Mar 20227:00 amRNSASX Coglia Assays
22nd Mar 20228:05 amRNSAwkward East Claim Acquisition
8th Mar 20227:48 amRNSConversion of Securities
7th Mar 20221:48 pmRNSResult of Placing - Replacement
7th Mar 202211:28 amRNSResult of Placing
7th Mar 20227:46 amRNSIssue of Equity
28th Feb 20227:00 amRNSPanther Metals Limited - update on Coglia Project
25th Feb 202211:06 amRNSSecond Price Monitoring Extn
25th Feb 202211:01 amRNSPrice Monitoring Extension
25th Feb 20229:43 amRNSPanther Australia Update
2nd Feb 20227:00 amRNSNew Corporate Presentation
24th Jan 20227:00 amRNSDotted Lake Drilling Update
18th Jan 20227:00 amRNSVMS Mineral System Discovered on Obonga Project
17th Dec 20217:00 amRNSWarrant Extension
16th Dec 20217:00 amRNSDrilling Commenced at Coglia Nickel-Cobalt Project
10th Dec 20217:00 amRNSPanther ASX Listing and Directorate Change
22nd Nov 20217:00 amRNSObonga Project Additional Claim Purchase Option
9th Nov 20217:00 amRNSDotted Lake Soil Sampling Results
8th Nov 20217:00 amRNSFurther re IPO of Panther Metals Limited

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.