REMINDER: Our user survey closes on Friday, please submit your responses here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPanther Metals Regulatory News (PALM)

Share Price Information for Panther Metals (PALM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.70
Bid: 4.40
Ask: 5.00
Change: 0.00 (0.00%)
Spread: 0.60 (13.636%)
Open: 4.70
High: 4.70
Low: 4.70
Prev. Close: 4.70
PALM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

VMS Mineral System Discovered on Obonga Project

18 Jan 2022 07:00

RNS Number : 7420Y
Panther Metals PLC
18 January 2022
 

NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY IN OR INTO AUSTRALIA, CANADA, JAPAN, THE REPUBLIC OF SOUTH AFRICA, THE UNITED STATES OR ANY OTHER JURISDICTION WHERE TO DO SO WOULD CONSTITUTE A VIOLATION OF THE RELEVANT LAWS OF SUCH JURISDICTION

FOR IMMEDIATE RELEASE

 

PANTHER METALS PLC

("Panther" or the "Company")

(Incorporated in the Isle of Man with company number 009753V)

18 January 2022

VMS Mineral System Discovered on Obonga Project

Panther Metals PLC (LSE:PALM) the company focused on mineral exploration in Canada, is pleased to announce the discovery of a volcanogenic massive sulphide1 ("VMS") mineral system at the Wishbone Prospect, based on the results of the Phase 1 diamond core drilling programme at the Obonga Project in Ontario, Canada.

 

Darren Hazelwood, Chief Executive Officer, commented:

 

"The discovery of a VMS system at Obonga is a remarkable achievement for the team, and given that it took just two drill holes, it shows the level of work that was put into the exploration targeting process.

 

The implications of the Wishbone VMS discovery to the wider Obonga Project area are considerable. Before this programme no other VMS was known on this belt. Obonga has now been confirmed as a favourable geological environment for the development of VMS systems and many more potential VMS targets exist on Panther's landholding.

 

The very nature of this type of deposit means they tend to cluster, once you have one, the chances increase dramatically of finding others.

 

Elevated base metal content, especially within close proximity of our drilling location, adds further confidence to our future plans."

 

Wishbone Phase 1 Technical Summary

 

· Wishbone Phase 1 Drilling Programme results, with the discovery of the first VMS system on the Obonga Greenstone Belt, show proof of concept and validation of the exploration targeting and modelling undertaken by Broken Rock Resources, Panther's exploration partner at Wishbone.

 

· Two diamond core drill holes, totalling 600m, completed to planned depths ofBBR21_WB_001 ("WB001"): 297m; BBR21_WB_002 ("WB002"): 303m. Core diameter: 42mm.

 

· Wide massive sulphide and semi-massive sulphide mineralisation intersections in both drill holes:

o WB001: Three wide sulphide intersections:

§ 27.3m of massive sulphide from 106.2m ('Upper layer'), with fault at base;

§ 2.5m of massive sulphide from 234.8m ('Mid layer'; and

§ 1.4m of massive sulphide from 256.6m ('Lower layer')

 

o WB002: Wide zoned sulphide intersection:

§ 51m from 174m comprising a wide zone of sulphide dominated mineralisation, including:

· 17m from 180m of massive sulphide ('Upper zone') and

· 7m from 218m of semi-massive sulphide ('Lower zone')

 

· An important characteristic of VMS deposits is that they typically display a zonation of metals within the massive sulphide body from Fe+Cu at the base to Zn+Fe±Pb±Ba at the top and margins, related to differing temperature and chemical conditions at mineral deposition. The major observed mineral component2 of the Wishbone massive sulphide mineralisation is pyrrhotite with less common pyrite and minor sphalerite and chalcopyrite in distinct zones:

 

o WB001:

§ Upper layer: MS intersection includes a 7.5m wide zone of Fe above/ close to 50% Fe upper detection limit, with pyrrhotite, pyrite and magnetite identified in the core logging.

§ Mid layer: Strongest zinc (sphalerite) intersection averages 0.5m @ 1.9% Zn (based on verification sampling) within a 1.5m @ 1.1% Zn with 3.1g/t Ag from 235.5m.

§ Lower layer: geochemical correlation to the Mid layer with lower Zn & Ag.

 

o WB002:

§ Upper zone: displays 10x relative enrichment in Ag (1g/t) over the Lower zone and similar mineralogical composition to WB001.

 

· Work is ongoing to assess the Phase 1 programme results in combination with geophysical, structural and geological datasets to determine next steps to specifically target the potential for economic base metal zonation within and close to Wishbone.

 

· The Wishbone assay result suite, including rare earth element (REE) analyses, yields important geochemical information allowing the classification of the mineralisation, alteration ratios and the development of exploration vectors towards zones of potential economic interest.

 

o Alteration and REE ratio markers in both drill holes correlate well with established VMS exploration models.

o Zn+Pb and Cu ratios of the Wishbone massive sulphide layers indicate the mineralisation is most likely a bi-modal type VMS deposit. The deposits of the Sturgeon Lake/Mattabi VMS Camp (consisting of 6 historic VMS mines) 75km west of Wishbone, has been classified as a bimodal type deposits as have Canada's Kidd Creek (Ontario) and Noranda (Quebec) VMS deposits.

 

· Another important characteristic of VMS type deposits is that they typically occur in clusters. The Company views that the discovery of the Wishbone VMS system bodes very well for the existence of further, as yet undiscovered VMS bodies in the vicinity, as it confirms the western part of the Obonga Greenstone belt as a favourable geological environmental, and permissive tract, for the development of volcanic associated mineralising systems.

 

· Panther have retained the support of a post-doctoral academic from a Canadian VMS centre of excellence and are working towards forging university relationships which will see the Company leverage all available knowledge and expertise to open up the Obonga greenstone belt for further VMS exploration.

 

 

 

Wishbone VMS Prospect

 

The Wishbone VMS Prospect, targeting the base metals copper ("Cu"), lead ("Pb"), zinc ("Zn) and silver ("Ag") and gold ("Au"), is located in the west of the Obonga Project area.

 

The Wishbone VMS system confirmed by Panther's Phase 1 drill programme coincides with of a significant magnetic geophysics anomaly which is coincident with a strong electromagnetic ("EM") geophysical anomaly (the "Wishbone anomaly").

 

Wishbone is situated in a similar geological environment to the nearby Sturgeon Lake area, and its Mattabi VMS mining camp, on the Wabigoon Greenstone Belt, approximately 75km due west. The Sturgeon Lake / Mattabi area hosted five commercially viable VMS mining operations that produced from the early 1970's into the 1990's. The Mattabi mine being the most prolific, reportedly produced 13.5 Mt of ore with an average grade 7.5% Zn, 0.88% Cu, 0.77% Pb and 3.10 oz/t (96.42g/t) Ag in the period 1970-1983. It was reportedly discovered through the drilling airborne geophysics anomalies.

 

In the Obonga area, drilling in the 1970's intersected massive stringer and disseminated sulphide 800m north of the Wishbone anomaly and drilling by BHP in the 1990's intersected massive stringer and disseminated sulphide 600m south of the anomaly. BHP ranked the Wishbone anomaly a high priority for follow up in 1992 however no further work was completed. Airborne geophysics datasets compiled since that time have shown that the historical drilling failed to intersect the major anomalies.

 

Obonga Project Overview

 

The Obonga Project("Obonga") covers the Obonga Greenstone Belt which consists of a 32km long by up to 9km wide, broadly east-west striking, tract of Archean age metamorphosed volcanic, sedimentary and intrusive rocks. It is a highly prospective setting for the formation of orogenic shear-hosted gold deposits, volcanogenic massive sulphide copper-lead-zinc-silver deposits, komatiite/ultramafic associated nickel-copper-platinum group metal ("PGM") deposits and porphyry style base metal mineralisation.

 

Panther's Obonga Project constitutes an 88% coverage of Obonga Greenstone Belt and includes seven high prospectivity targets for gold, nickel, PGM and base metals identified by partner company Broken Rock Resources Ltd. The remaining ground over the belt is either designated areas as environmental reserves and not available for exploration, or under minor landholding by third parties.

 

Broken Rock is a Canadian registered private exploration company with a number of exploration interests in north-west Ontario. The company is headed up by Liane Boyer who is a well-respected and experienced exploration and resource geologist who has worked at a number of mines in Ontario including Barrick Gold Corp's Hemlo gold mine, Newmont's Musselwhite gold mine, the Impala Platinum Lac Des Iles PGM mine and consulted on an extensive portfolio of exploration projects and mines internationally.

 

Panther's aim at Obonga is to create shared value that benefits local communities and to explore and develop projects in an environmentally sensitive manner.

 

Reference Notes:

 

1 Volcanogenic Massive Sulphide ("VMS") also known as a volcanic-host massive sulphide ("VHMS"). Mineralisation related to submarine volcanic processes linked to sea floor spreading at tectonic plate boundaries.

 

As defined by the United States Geological Survey ("USGS"): VMS are important sources of copper, zinc, lead, gold, and silver (Cu, Zn, Pb, Au, and Ag). These deposits formed at or near the seafloor were circulating hydrothermal fluids driven by magmatic heat are quenched through mixing with bottom waters or porewaters in near-seafloor lithologies. Massive sulphide lenses vary widely in shape and size and may be pod-like or sheetlike. They are generally stratiform and may occur as multiple lenses.

 

VMS deposits consist of >40% sulphides, characterised by abundant Fe sulphides (pyrite or pyrrhotite) and variable but subordinate amounts of chalcopyrite, sphalerite, and galena; non-sulphide gangue typically consists of quartz, barite, anhydrite, iron (Fe) oxides, chlorite, sericite, talc, and their metamorphosed equivalents.

 

VMS deposits range in size from small pods of less than a tonne (which are commonly scattered through prospective terrane) to supergiant accumulations like Rio Tinto (Spain), 1.5 Bt (billion tonnes); Kholodrina (Russia), 300 Mt (million tonnes); Windy Craggy (Canada), 300 Mt; Brunswick No. 12 (Canada), 230 Mt; and Ducktown (United States), 163 Mt (Galley and others, 2007).

 

2 Mineral definitions:

 

Pyrrhotite is an iron (Fe) sulphide mineral with the formula Fe(1-x)S (x = 0 to 0.2)

 

Pyrite is an iron sulphide with the chemical formula FeS2

 

Chalcopyrite is a copper (Cu) iron sulphide mineral and the most abundant copper ore mineral; it has the chemical formula CuFeS2

 

Sphalerite the most important ore mineral of zinc, it has the formula (Zn,Fe)S

 

 

For further information please contact:

 

 

Panther Metals PLC:

Darren Hazelwood, Chief Executive Officer: +44(0) 1462 429 743

+44(0) 7971 957 685

Mitchell Smith, Chief Operating Officer: +1(604) 209 6678

Broker:

SI Capital Limited

Nick Emerson +44(0) 1438 416 500

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.Reach is a non-regulatory news service. By using this service an issuer is confirming that the information contained within this announcement is of a non-regulatory nature. Reach announcements are identified with an orange label and the word “Reach” in the source column of the News Explorer pages of London Stock Exchange’s website so that they are distinguished from the RNS UK regulatory service. Other vendors subscribing for Reach press releases may use a different method to distinguish Reach announcements from UK regulatory news.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRAFDLLFLFLXBBQ
Date   Source Headline
7th May 20247:06 amRNSFulcrum Metals: Teck-Hughes Tailings Update
24th Apr 20247:00 amRNSFinal Results
22nd Apr 20248:28 amRNSObonga Awkward West Exploration Permit Application
11th Apr 20247:00 amRNSAppointment of Strategic Adviser
10th Apr 20247:02 amRNSFulcrum Metals: Option for Gold Tailings Project
3rd Apr 20247:02 amRNSFulcrum Metals - Uranium Asset Disposal
2nd Apr 20247:00 amRNSAwkward East Permit Application
18th Mar 202411:44 amRNSHolding(s) in Company
15th Mar 20247:00 amRNSHolding(s) in Company
12th Mar 20247:00 amRNSHolding(s) in Company
12th Mar 20247:00 amRNSFulcrum: Share Sale and revised Lock-in Agreement
5th Mar 20247:01 amRNSAustralia: Coglia Nickel-Cobalt Update
5th Mar 20247:00 amRNSObonga Agreement Extension
1st Feb 20242:02 pmRNSObonga: Wishbone Exploration Permit Application
15th Jan 20247:00 amRNSFulcrum Metals - Uranium Projects Update
11th Jan 20248:25 amRNSGraphite Discovery Grows Significantly at Obonga
5th Jan 20247:00 amRNSHolding(s) in Company
2nd Jan 202411:21 amRNSCorporate Update
29th Dec 20239:49 amRNSObonga Awkward East Claim Purchase Agreement
20th Dec 20237:00 amRNSFunding Update
11th Dec 20237:00 amRNSHolding in Panther Metals Ltd now free trading
5th Dec 202310:48 amRNSDrilling at Manitou Lakes Gold Project Complete
30th Nov 20237:05 amRNSFulcrum Metals: Tailings Project Option
27th Nov 20237:02 amRNSFulcrum Metals: Saskatchewan Uranium Update
21st Nov 20238:08 amRNSManitou Lakes Drilling Programme Commences
20th Nov 20237:00 amRNSAppointment of Joint Broker and Manitou funding
15th Nov 20237:00 amRNSPanther Australia - Coglia Update
1st Nov 20237:00 amRNSDirectorate Change
30th Oct 20231:09 pmRNSGold Intercepts Show Potential at 40 Mile Camp
23rd Oct 20237:01 amRNSFulcrum Metals: Tully Gold Project
16th Oct 20238:41 amRNSHolding(s) in Company
3rd Oct 202311:05 amRNSFulcrum Metals Charlot-Neely Lake Uranium Project
27th Sep 20237:27 amRNSManitou Lakes: Additional Mining Claims Staked
25th Sep 20237:47 amRNSHalf-year Report
19th Sep 20233:31 pmRNSAppointment of Joint Broker
18th Sep 20237:00 amRNSFulcrum Metals: Drill Planning Update
13th Sep 20237:00 amRNSFulcrum Metals: Schreiber-Hemlo Project Update
11th Sep 20239:36 amRNSHolding(s) in Company
7th Sep 20237:01 amRNSFulcrum Metals: Strong Uranium Targets Identified
7th Sep 20237:00 amRNSInvestor Event
5th Sep 202310:01 amRNSPanther Australia - Nickel Sulphide Project Update
31st Aug 20237:00 amRNSIssue of Debt
7th Aug 20239:59 amRNSFulcrum Metals - Acquisition and Fundraise
1st Aug 202310:21 amRNSAll Drilling Complete in Western Australia
27th Jul 20237:00 amRNSBig Bear - Increase in Targets Defined
27th Jun 20237:00 amRNSDotted Lake Drill Permit
8th Jun 20233:19 pmRNSResult of AGM
18th May 202311:44 amRNSNotice of AGM
16th May 20238:24 amRNSChange of Registered Office
12th May 20237:00 amRNSAdditional Claims Staked at Obonga

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.