REMINDER: Our user survey closes on Friday, please submit your responses here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Regulatory News (PAF)

Share Price Information for Pan African (PAF)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 23.90
Bid: 23.75
Ask: 23.90
Change: -0.10 (-0.42%)
Spread: 0.15 (0.632%)
Open: 23.30
High: 24.55
Low: 23.30
Prev. Close: 24.00
PAF Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update quarter ended 30/09/18

6 Nov 2018 07:00

Pan African Resources Plc - Operational Update quarter ended 30/09/18

Pan African Resources Plc - Operational Update quarter ended 30/09/18

PR Newswire

London, November 5

Pan African Resources PLC

("Pan African" or “the company" or “the group”)

(Incorporated and registered in England and Wales under Companies Act 1985 with registered number 3937466 on 25 February 2000)

Share code on AIM: PAF

Share code on JSE: PAN

ISIN: GB0004300496

OPERATIONAL UPDATE FOR THE QUARTER ENDED 30 SEPTEMBER 2018

Pan African is pleased to provide an operational update for the first quarter of the 2019 financial year (“this quarter” or “first quarter”), and further information on the performance of the Elikhulu Tailings Retreatment Plant (“Elikhulu”).

Pan African CEO Cobus Loots commented:

“Pan African recorded a commendable safety and production performance for the first quarter of the 2019 financial year. The group produced 37,729oz of gold during the quarter, and with Elikhulu now commissioned and running at design capacity, we are confident of achieving our production guidance of approximately 170,000oz for the 2019 financial year.

Elikhulu ramped-up to its design capacity of 1-million tonnes per month during October 2018, ahead of the original schedule and on budget. Average gold recoveries achieved were consistent with our forecasts, with further optimisation of recoveries expected in the short term. The incorporation of the Evander Tailings Retreatment Plant (“ETRP”) into Elikhulu, which will increase Elikhulu’s capacity to 1.2-million tonnes per month, is progressing on schedule, with full commissioning expected to be completed by January 2019.

Barberton Mines is on track to meet its full-year production guidance of 100,000oz, with the underground operations’ production benefitting from Fairview Mine’s high-grade 272 and 358 platforms, and the newly installed regrind mill at the Barberton Tailings Retreatment Plant (“BTRP”) performing as anticipated.

At Evander Mines, we have commenced mining and vamping of the remnant high-grade stopes as part of the phased closure of the underground mining operations as an initiative to supplement Evander Mines’ production, while commencing with the equipping and preparatory work to advance the mining of the 8 Shaft pillar and high-grade areas in proximity to the pillar. The first phase of the equipping and preparatory work is expected to be completed in the third quarter of the 2019 financial year.

The drilling programme on Barberton Mines’ Royal Sheba prospect has been completed, and we look forward to updating shareholders on the progress of this exciting growth project in the coming months with an updated resource statement to be released by the end of November 2018, and the feasibility study still on schedule for release in February 2019.”

Safety

The group has significantly improved its safety performance in the first quarter, and we remain committed and focussed to ensuring the safety of all our employees, while we continue to strive towards a zero harm environment.

Fairview Mine achieved its one-million fatality-free shift milestone during July 2018; The group had no fatalities in this quarter (2018 Q1: no fatalities); The group’s lost-time injury frequency rate improved significantly to 0.57 (2018 Q1:3.64); The reportable injury frequency rate improved significantly in this quarter to zero (2018 Q1: 0.91); and The group is implementing recommendations from independent safety experts, following reviews of the respective mining operations’ safety systems and controls.

Elikhulu

As previously communicated, Elikhulu was successfully commissioned during September 2018, ahead of the original project schedule and on budget; During October 2018, the plant attained steady-state production with a throughput of 1-million tonnes per month. The average gold recoveries achieved were consistent with our forecasts, with further optimisation of recoveries expected in the next months; and The incorporation of the existing ETRP throughput into Elikhulu’s processing capacity, which will result in an increased processing capacity of 1.2-million tonnes per month, is on track with full commissioning expected to be completed by January 2019. Barberton Mines Proprietary Limited (“Barberton Mines”) Barberton Mines produced 27,201oz for this quarter, with underground mining operations contributing 21,278oz, and the BTRP contributing 5,923oz. Barberton Mines remains on track to deliver its annual production guidance of approximately 100,000oz for the 2019 financial year. Barberton Mines’ underground operations are benefitting from increased underground mining flexibility due to, inter alia, both the high-grade 272 and 358 platforms being available at the Fairview Mine operation. The BTRP is also benefiting from the commissioning of the regrind mill during May 2018, which has improved throughput and recoveries. Barberton Mines has increased development rates to further improve Fairview Mine’s mining flexibility at the 11-block by developing towards an additional high-grade platform (256 platform), below the existing 272 and 358 platforms. This platform is expected to be in production by the end of the 2019 financial year.

Evander Gold Mines Proprietary Limited (“Evander Mines”)

Evander Mines has implemented the following initiatives to maximise Evander Mines’ underground gold production: Mining and vamping of the remnant high-grade stopes as part of the phased closure of the underground mining operations, which contributed 3,815oz during this quarter; and While the above operations are ongoing, the mine has commenced equipping and preparatory work to advance mining of the 8 Shaft pillar and high-grade areas in proximity to the pillar, following a comprehensive review on the technical merits thereof. The first phase of the equipping and development of the 8 Shaft pillar and surrounding areas is estimated to be completed in the third quarter of the 2019 financial year. The ETRP and surface-source operations produced 3,819oz for this quarter, and the operation is investigating new sources of feed for the Kinross plant, once the ETRP operation is integrated into Elikhulu.

The financial information contained in this announcement has neither been reviewed nor audited by the company’s auditors and is the responsibility of the directors of Pan African.

For further information on Pan African, please visit the company’s website at www.panafricanresources.com

6 November 2018

Contact information
Corporate OfficeThe Firs Office Building2nd Floor, Office 201Cnr. Cradock and Biermann AvenuesRosebank, JohannesburgSouth AfricaOffice: + 27 (0) 11 243 2900Facsimile: + 27 (0) 11 880 1240Registered OfficeSuite 31Second Floor107 CheapsideLondonEC2V 6DNUnited KingdomOffice: + 44 (0) 20 7796 8644Facsimile: + 44 (0) 20 7796 8645
Cobus LootsPan African Resources PLCChief Executive OfficerOffice: + 27 (0) 11 243 2900Deon LouwPan African Resources PLCFinancial DirectorOffice: + 27 (0) 11 243 2900
Phil DexterSt James's Corporate Services LimitedCompany SecretaryOffice: + 44 (0) 20 7796 8644John Prior / Paul GillamNumis Securities LimitedNominated Adviser and Joint BrokerOffice: +44 (0) 20 7260 1000
Sholto SimpsonOne CapitalJSE SponsorOffice: + 27 (0) 11 550 5009Ross Allister/James Bavister/David McKeownPeel Hunt LLPJoint BrokerOffice: +44 (0) 20 7418 8900
Julian GwillimAprio Strategic CommunicationsPublic & Investor Relations SAOffice: +27 (0)11 880 0037Jeffrey Couch/Thomas RiderBMO Capital Markets LimitedJoint BrokerOffice: +44 (0) 20 7236 1010
Bobby MorseBuchananPublic & Investor Relations UKOffice: +44 (0)20 7466 5000Email: PAF@buchanan.uk.com
Website: www.panafricanresources.com
Date   Source Headline
24th Mar 20204:43 pmRNSSecond Price Monitoring Extn
24th Mar 20204:38 pmRNSPrice Monitoring Extension
24th Mar 20207:35 amPRN21 Day Lockdown and Suspension of Production Guidance
23rd Mar 20204:38 pmRNSPrice Monitoring Extension
20th Mar 20207:00 amPRNStatement re Covid-19 Prevention Measures
19th Mar 20202:00 pmPRNDirector/PDMR Shareholding
18th Mar 20203:50 pmPRNHolding(s) in Company
12th Mar 202012:00 pmPRNHolding(s) in Company
10th Mar 20209:07 amPRNHolding(s) in Company
9th Mar 202010:30 amPRNDirector/PDMR Shareholding
24th Feb 20202:00 pmPRNDirector/PDMR Shareholding
24th Feb 20209:32 amPRNDirector/PDMR Shareholding
21st Feb 20209:00 amPRNDirector/PDMR Shareholding
21st Feb 20209:00 amPRNDirector/PDMR Shareholding
20th Feb 20208:08 amPRNDirector/PDMR Shareholding
18th Feb 20207:00 amPRNInterim Unaudited Results to 31 December 2019
31st Jan 20207:00 amPRNTrading Statement for the six months ended 31 Dec 2019
24th Jan 20207:00 amPRNOperational Update for the Six Months Ended 31 Dec 2019
21st Jan 202010:30 amPRNHolding(s) in Company
29th Nov 20197:00 amPRNResult of AGM & Salient Dividend Dates
28th Oct 20197:00 amPRNNotice of AGM & No Change Statement
25th Oct 20191:00 pmPRNHolding(s) in Company
25th Sep 20193:30 pmPRNDirector/PDMR Shareholding
20th Sep 20197:00 amPRNDirector/PDMR Shareholding
20th Sep 20197:00 amPRNDirector/PDMR Shareholding
18th Sep 20199:32 amPRNPublication of IAR FY2019
18th Sep 20197:00 amPRNProvisional Summarised Audited Results
11th Sep 20191:00 pmPRNTrading Statement & Notice of Results
29th Jul 20195:30 pmRNSSafecharge International Group
18th Jul 20191:30 pmPRNDirectorate Change
12th Jul 20197:00 amPRNOperational Update for the Year ended 30 June 2019
1st Jul 201910:00 amPRNHolding(s) in Company
5th Jun 201911:15 amPRNHolding(s) in Company
31st May 20194:40 pmRNSSecond Price Monitoring Extn
31st May 20194:35 pmRNSPrice Monitoring Extension
17th May 20197:00 amPRNOperational Update for 9 Months ended March 2019
7th May 20191:30 pmPRNHolding(s) in Company
3rd Apr 201912:06 pmPRNDirectorate Change
20th Feb 20197:00 amPRNInterim Results for six months to 31 Dec 2018
19th Feb 201910:00 amPRNHolding(s) in Company
13th Feb 20197:00 amPRNTrading Statement for six months ended 31 Dec 18
25th Jan 20197:00 amPRNOperational Update for the six months to 31.12.18
10th Jan 201912:07 pmRNSSecond Price Monitoring Extn
10th Jan 201912:02 pmRNSPrice Monitoring Extension
19th Dec 20182:30 pmPRNNotification of Change in Auditor
17th Dec 201812:07 pmRNSSecond Price Monitoring Extn
17th Dec 201812:02 pmRNSPrice Monitoring Extension
13th Dec 20184:40 pmRNSSecond Price Monitoring Extn
13th Dec 20184:35 pmRNSPrice Monitoring Extension
11th Dec 20184:40 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.