Less Ads, More Data, More Tools Register for FREE

Pin to quick picksORM.L Regulatory News (ORM)

  • There is currently no data for ORM

Drilling Report

6 Oct 2008 07:00

RNS Number : 1042F
Ormonde Mining PLC
06 October 2008
 



06 October 2008

Ormonde Mining plc

High Grade Results From Initial Infill Drilling of Thick Tungsten Zone at Barruecopardo

DUBLIN & LONDON06 October 2008 Ormonde Mining plc ("Ormonde" or the "Company") is pleased to report very encouraging drilling results from its Barruecopardo Tungsten Project in SalamancaSpain (the "Project").

Highlights

·; The first hole in the Company’s infill drilling programme (BAR-47) has returned an interval of 51 metres grading 0.3% WO3. This intersection has an estimated true thickness of 34 metres and includes a high-grade interval of 10 metres grading 0.7% WO3.

·; This result, from the Project’s main resource zone, the Filon Principal Zone, demonstrates that widths and grades intersected are in line with Ormonde’s previous widely spaced drilling. This zone could be amenable to either bulk mining or higher grade selective mining.
 
·; Further drilling in progress to infill the main resource blocks is aimed at providing the detail required to facilitate the initial design of a mining project, based upon the current resource of 3.0 million tonnes grading 0.6% WO3.
 
·; In addition, deeper drilling has intersected the depth extension of the deposit, including high grade tungsten intervals of 1 metre grading 1.1% and 3 metres grading 0.8% WO3, some 100 metres below the depth of previous drilling.

 

Kerr Anderson, Managing Director, said:

"We are very pleased with these great drilling results, both in terms of the infill assays and very encouragingly in starting to provide evidence of a depth extension of the deposit below the level of previous drilling. We look forward to reporting further results from the programme as assays are received."

New Drilling Results

Hole

From (m)

Width (m)

True Width (m)

WO3%

Zone

Infill drilling

BAR-47

168.0

51.0

33.8

0.27

FP

including

205.0

10.0

6.6

0.65

FP

including

205.0

2.0

1.6

1.08

FP

Deeper drilling

BAR-46

291.0

18.0

13.8

0.26

FP

including

291.0

1.0

0.8

1.08

FP

299.0

1.0

0.8

1.06

FP

304.0

3.0

2.3

0.79

FP

BAR-46B

287.0

1.0

0.8

0.71

FP

321.0

1.0

0.8

0.99

FP

369.0

8.0

6.1

0.30

FC

Zone codes:

FP = Filon Principal Zone

FC = Filon Central Zone

Drill hole BAR-47 was drilled under the main open pit to test the thick Filon Principal Zone, on a 50 metre infill section between previous holes BAR-26B and BAR-35, which had returned the following results:

Hole

From (m)

Width (m)

True Width (m)

WO3%

Zone

BAR-26B

138.0

67.0

49.0

0.30

FP

including

138.0

7.0

5.5

1.10

FP

185.0

4.0

2.9

0.93

FP

203.0

2.0

1.5

1.87

FP

BAR-35

124.0

82.0

62.6

0.25

FP

including

141.0

5.0

3.8

0.89

FP

160.0

2.0

1.5

4.48

FP

190.0

1.0

0.8

2.11

FP

The results of BAR-47 are therefore in line with expectations and support the view that this zone could be amenable to either bulk mining or higher grade selective mining methods.

Drill holes BAR-46 and 46B intersected the depth continuation of the tungsten mineralisation, and demonstrate that the Barruecopardo Deposit extends for at least 100 metres below the level of the current published resource. This is the first drilling at these depths of the deposit and serves to indicate further depth continuity along this 1.5 kilometre long, steeply-dipping deposit.

Drill hole BAR-46 was abandoned before reaching its target depth due to technical difficulties, and the hole was re-drilled and completed as BAR-46B.

Notes on assay method:

BAR-47 - Assays are reported using the fusion XRF method.

BAR-46 and 46B - Assays are reported using the ICP lithium metaborate fusion method. All values greater than 0.1% tungsten are subsequently analysed by the fusion XRF method.

Kerr Anderson PhD EurGeol PGeo, Managing Director of Ormonde Mining plc, and a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies, March 2006, of the London Stock Exchange, has reviewed and approved the technical information contained in this announcement.

A glossary explaining technical terms contained in this announcement can be found at www.ormondemining.com/invest/glossary.html.

Enquiries to:

Ormonde Mining plc

Kerr Anderson, Managing Director,

Fraser Gardiner, Director

Tel: +353 (0)46 9073623

Bankside Consultants

Simon Rothschild / Louise Mason Tel: +44 (0)20 7367 8888 Mob: +44 (0)7703 167065

Davy (Nomad / IEX Adviser)

Fergal Meegan Tel: +353 (0)1 6796363

Brewin Dolphin (UK Adviser)

Alexander Dewar Tel: +44 (0)131 529 0276

ENDS

About Tungsten

Tungsten is most frequently used as tungsten monocarbide, which has a hardness close to diamond, in cemented carbides. The principal tungsten applications include its use in cutting steels and in tungsten alloys, electronics, and chemical products.

Prices of tungsten concentrates are expected to remain buoyant for the long term, and are currently quoted by the Metal Bulletin in the range $160-$180 per metric tonne unit. A metric tonne unit is equal to 10kg of WO3, which equates to 1.0% contained WO3 in the rock. More information can be found on Ormonde's tungsten information page at http://www.ormondemining.com/about-tungsten/index.html

About Ormonde

Ormonde Mining plc is quoted on the AIM in London and the IEX in Dublin. Ormonde is a mineral development and exploration company focused on Spain, with the objective of developing mining projects and taking them into production.

For more information please visit www.ormondemining.com.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFSFFMDSASEFS
Date   Source Headline
23rd Jun 20117:00 amRNSDrilling Update
20th Jun 20112:01 pmRNSAnnual Financial Report
24th May 20117:00 amRNSFinal Results
16th May 20117:00 amRNSNotification of Interest
12th May 20117:00 amRNSNotification of Interest
11th May 20112:44 pmRNSIssue of Equity
10th May 20117:00 amRNSEnterprise Securities Market Notice
9th May 201112:50 pmRNSNotification of Interest
9th May 20117:00 amRNSEngineering Firm Appointed
4th May 20117:00 amRNSPlacing
14th Apr 20117:00 amRNSBarruecopardo Drilling Results
4th Apr 20117:00 amRNSAcquisition
14th Mar 20117:00 amRNSSalamanca-Zamora Gold Exploration Update
14th Mar 20117:00 amRNSJoint Venture with Ormonde Mining plc
2nd Mar 20117:00 amRNSTungsten Update
13th Jan 20117:00 amRNSTungsten Permitting
13th Dec 20101:06 pmRNSHolding in Company
13th Dec 201010:36 amRNSHolding in Company
10th Dec 20102:34 pmRNSNotification of Interest
11th Nov 20107:00 amRNSTungsten Progress
13th Oct 20107:00 amRNSOrmonde Presentation
11th Oct 20109:53 amRNSHolding(s) in Company
6th Oct 20107:00 amRNSEnterprise Securities Market Notice
5th Oct 20102:09 pmRNSGranting of Options
30th Sep 20107:00 amRNSIssue of Equity
28th Sep 20107:00 amRNSHalf Yearly Report
27th Sep 20104:41 pmRNSSecond Price Monitoring Extn
27th Sep 20104:35 pmRNSPrice Monitoring Extension
16th Sep 20107:00 amRNSScott Wilson Study
9th Sep 20107:00 amRNSLa Zarza Update
7th Sep 20102:56 pmRNSShareholder Notification
27th Aug 201012:02 pmRNSNotification of Major Interest
26th Aug 20103:17 pmRNSNotification of Major Interest
3rd Aug 20107:01 amRNSSalamanca Gold Report
3rd Aug 20107:00 amRNSAppointment of Joint AIM Broker
28th Jul 20107:00 amRNSTungsten Review
19th Jul 201012:01 pmRNSNotification of Major Interest
16th Jul 20101:40 pmRNSEnterprise Securities Market Notice - Replacement
16th Jul 20101:20 pmRNSEnterprise Securities Market Notice
2nd Jul 20107:00 amRNSResignation of Director
30th Jun 20107:00 amRNSIssue of Equity
28th May 20102:56 pmRNSAGM Result
27th May 20107:00 amRNSMajor Tungsten Upgrade
6th May 201010:14 amRNSAnnual Financial Report
27th Apr 20107:00 amRNSFinal Results
12th Apr 20107:00 amRNSTharsis Option Agreement
19th Feb 20107:00 amRNSLa Zarza Update
27th Oct 20097:00 amRNSAntofagasta Joint Venture
28th Sep 20097:00 amRNSInterim Results
22nd Sep 200911:17 amRNSShareholder Notification

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.