Less Ads, More Data, More Tools Register for FREE

Pin to quick picksORM.L Regulatory News (ORM)

  • There is currently no data for ORM

Drilling Report

6 Oct 2008 07:00

RNS Number : 1042F
Ormonde Mining PLC
06 October 2008
 



06 October 2008

Ormonde Mining plc

High Grade Results From Initial Infill Drilling of Thick Tungsten Zone at Barruecopardo

DUBLIN & LONDON: 06 October 2008 - Ormonde Mining plc ("Ormonde" or the "Company") is pleased to report very encouraging drilling results from its Barruecopardo Tungsten Project in Salamanca, Spain (the "Project").

Highlights

·; The first hole in the Company’s infill drilling programme (BAR-47) has returned an interval of 51 metres grading 0.3% WO3. This intersection has an estimated true thickness of 34 metres and includes a high-grade interval of 10 metres grading 0.7% WO3.

·; This result, from the Project’s main resource zone, the Filon Principal Zone, demonstrates that widths and grades intersected are in line with Ormonde’s previous widely spaced drilling. This zone could be amenable to either bulk mining or higher grade selective mining.
 
·; Further drilling in progress to infill the main resource blocks is aimed at providing the detail required to facilitate the initial design of a mining project, based upon the current resource of 3.0 million tonnes grading 0.6% WO3.
 
·; In addition, deeper drilling has intersected the depth extension of the deposit, including high grade tungsten intervals of 1 metre grading 1.1% and 3 metres grading 0.8% WO3, some 100 metres below the depth of previous drilling.

 

Kerr Anderson, Managing Director, said:

"We are very pleased with these great drilling results, both in terms of the infill assays and very encouragingly in starting to provide evidence of a depth extension of the deposit below the level of previous drilling. We look forward to reporting further results from the programme as assays are received."

New Drilling Results

Hole

From (m)

Width (m)

True Width (m)

WO3%

Zone

Infill drilling

BAR-47

168.0

51.0

33.8

0.27

FP

including

205.0

10.0

6.6

0.65

FP

including

205.0

2.0

1.6

1.08

FP

Deeper drilling

BAR-46

291.0

18.0

13.8

0.26

FP

including

291.0

1.0

0.8

1.08

FP

299.0

1.0

0.8

1.06

FP

304.0

3.0

2.3

0.79

FP

BAR-46B

287.0

1.0

0.8

0.71

FP

321.0

1.0

0.8

0.99

FP

369.0

8.0

6.1

0.30

FC

Zone codes:

FP = Filon Principal Zone

FC = Filon Central Zone

Drill hole BAR-47 was drilled under the main open pit to test the thick Filon Principal Zone, on a 50 metre infill section between previous holes BAR-26B and BAR-35, which had returned the following results:

Hole

From (m)

Width (m)

True Width (m)

WO3%

Zone

BAR-26B

138.0

67.0

49.0

0.30

FP

including

138.0

7.0

5.5

1.10

FP

185.0

4.0

2.9

0.93

FP

203.0

2.0

1.5

1.87

FP

BAR-35

124.0

82.0

62.6

0.25

FP

including

141.0

5.0

3.8

0.89

FP

160.0

2.0

1.5

4.48

FP

190.0

1.0

0.8

2.11

FP

The results of BAR-47 are therefore in line with expectations and support the view that this zone could be amenable to either bulk mining or higher grade selective mining methods.

Drill holes BAR-46 and 46B intersected the depth continuation of the tungsten mineralisation, and demonstrate that the Barruecopardo Deposit extends for at least 100 metres below the level of the current published resource. This is the first drilling at these depths of the deposit and serves to indicate further depth continuity along this 1.5 kilometre long, steeply-dipping deposit.

Drill hole BAR-46 was abandoned before reaching its target depth due to technical difficulties, and the hole was re-drilled and completed as BAR-46B.

Notes on assay method:

BAR-47 - Assays are reported using the fusion XRF method.

BAR-46 and 46B - Assays are reported using the ICP lithium metaborate fusion method. All values greater than 0.1% tungsten are subsequently analysed by the fusion XRF method.

Kerr Anderson PhD EurGeol PGeo, Managing Director of Ormonde Mining plc, and a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies, March 2006, of the London Stock Exchange, has reviewed and approved the technical information contained in this announcement.

A glossary explaining technical terms contained in this announcement can be found at www.ormondemining.com/invest/glossary.html.

Enquiries to:

Ormonde Mining plc

Kerr Anderson, Managing Director,

Fraser Gardiner, Director

Tel: +353 (0)46 9073623

Bankside Consultants

Simon Rothschild / Louise Mason Tel: +44 (0)20 7367 8888 Mob: +44 (0)7703 167065

Davy (Nomad / IEX Adviser)

Fergal Meegan Tel: +353 (0)1 6796363

Brewin Dolphin (UK Adviser)

Alexander Dewar Tel: +44 (0)131 529 0276

ENDS

About Tungsten

Tungsten is most frequently used as tungsten monocarbide, which has a hardness close to diamond, in cemented carbides. The principal tungsten applications include its use in cutting steels and in tungsten alloys, electronics, and chemical products.

Prices of tungsten concentrates are expected to remain buoyant for the long term, and are currently quoted by the Metal Bulletin in the range $160-$180 per metric tonne unit. A metric tonne unit is equal to 10kg of WO3, which equates to 1.0% contained WO3 in the rock. More information can be found on Ormonde's tungsten information page at http://www.ormondemining.com/about-tungsten/index.html. 

About Ormonde

Ormonde Mining plc is quoted on the AIM in London and the IEX in Dublin. Ormonde is a mineral development and exploration company focused on Spain, with the objective of developing mining projects and taking them into production.

For more information please visit www.ormondemining.com.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFSFFMDSASEFS
Date   Source Headline
4th Jun 20202:50 pmRNSHolding(s) in Company
15th May 20207:00 amRNSBusiness Update, Salary Reductions, Options Grant
8th Apr 20207:00 amRNSFinal Results
30th Mar 20204:41 pmRNSSecond Price Monitoring Extn
30th Mar 20204:37 pmRNSPrice Monitoring Extension
30th Mar 202011:00 amRNSPrice Monitoring Extension
13th Mar 202011:15 amRNSHolding(s) in Company
9th Mar 20207:55 amRNSDirector/PDMR Shareholding
17th Feb 20207:00 amRNSCompletion of Disposal
13th Feb 20201:53 pmRNSEGM Results
10th Feb 20207:00 amRNSDirectorate Change
27th Jan 20204:39 pmRNSPublishing of Circular and Proposed Board Changes
10th Jan 20203:58 pmRNSHolding(s) in Company
8th Jan 20204:41 pmRNSSecond Price Monitoring Extn
8th Jan 20204:36 pmRNSPrice Monitoring Extension
8th Jan 20202:05 pmRNSSecond Price Monitoring Extn
8th Jan 20202:00 pmRNSPrice Monitoring Extension
8th Jan 202012:58 pmRNSProposed Disposal
27th Dec 201911:05 amRNSSecond Price Monitoring Extn
27th Dec 201911:00 amRNSPrice Monitoring Extension
25th Nov 20197:00 amRNSOperational Update
24th Oct 20193:15 pmRNSHolding(s) in Company
24th Oct 20193:14 pmRNSHolding(s) in Company
17th Oct 20197:00 amRNSSaloro Financing Update
30th Sep 20197:00 amRNSInterim Results
23rd Sep 20193:31 pmRNSResult of AGM
20th Sep 20197:00 amRNSBarruecopardo Tungsten Mine Update
27th Jun 20192:49 pmRNSAnnual Financial Report
19th Jun 20197:00 amRNSFinal Results
23rd May 20197:00 amRNSBarruecopardo Update
26th Feb 20197:00 amRNSBarruecopardo Project Update
14th Dec 20187:00 amRNSBarruecopardo Tungsten Project Update
11th Oct 20183:14 pmRNSChange of Registered Office
27th Sep 20183:53 pmRNSResult of AGM
27th Sep 20187:00 amRNSInterim Results for six months ended 30 June 2018
12th Sep 20187:00 amRNSBarruecopardo Tungsten Project Update
27th Jun 201812:19 pmRNSAnnual Financial Report
19th Jun 20187:00 amRNSFinal Results
17th Jan 201811:58 amRNSGranting of Options
28th Nov 20177:00 amRNSBarruecopardo Tungsten Mine Construction Update
6th Oct 20174:07 pmRNSHolding(s) in Company
28th Sep 20177:00 amRNSInterim Results 2017
18th Sep 20172:09 pmRNSResult of AGM
5th Sep 20177:00 amRNSBarruecopardo Tungsten Project
28th Jun 20177:00 amRNSPublication of Annual Report
20th Jun 20177:00 amRNSFinal Results for the year ended 31 December 2016
2nd Jun 20177:00 amRNSBarruecopardo Project Update
22nd Dec 201612:36 pmRNSBarruecopardo Tungsten Project
6th Oct 20166:04 pmRNSGranting of Options
30th Sep 20167:00 amRNSInterim Results 2016

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.