Technical Feasibility Study

6 Feb 2012 07:00

RNS Number : 8046W
Oracle Coalfields PLC
06 February 2012
 



6 February 2012

Oracle Coalfields PLC

("Oracle" or the "Company")

 Technical Feasibility Study

Oracle Coalfields PLC (AIM:ORCP), the coal explorer and developer of a lignite mineral property located in the south-eastern desert of Sindh Province, Pakistan, today announces the results of the technical feasibility study ("FS") on Block VI of the Thar Coalfield.

 

The exploration licence for Block VI (NO.DMD/S/Ex-L-Coal (11)/10/2914) with an area of 66.1km2 ("Licence Area") is held by Oracle's 80 per cent owned subsidiary, Sindh Carbon Energy Limited ("Sindh Carbon"), a private company incorporated in Sindh Province, Pakistan. On 2November 2011 Sindh Carbon submitted an application for the conversion of the current exploration licence to a mining licence.

 

Highlights from the FS:

 

• Within the Licence Area there are Mineral Resources (reported in accordance with the terms and definitions of the JORC Code - defined below) in the mining area (approximately 20 square kilometres) of 529 millions of wet tonnes (Mwt) with gross calorific value (CV) of 3,182k calories per wet kilogramme (wkg), with ash content at 5.89 per cent and Sulphur at 0.91 per cent.

• Probable Coal Reserves (Phase 1 of Mining Area) of 113Mwt with gross CV 2,831kcal/wkg, Ash 11.50 per cent and Sulphur 0.79 per cent with a strip ratio of 8.54bcm waste (Bank Cubic Metre):1wt lignite.

• Total capital expenditure for open cast mine development is estimated at US$610m (including US$224m for mining equipment) for 5Mwt per annum of lignite production.

• Total cash cost of production of US$42.21 per wet tonne.

• Confirmed product quality suitable for power generation.

• 23 year mine life.

 

Shahrukh Khan, CEO of Oracle, said:

 

"This is another important step for Oracle as we look to provide a sustainable source of energy to Pakistan and bring its first large scale open-pit coal mine into production. The FS indicates the technical and economic viability of the mining project.

 

"Further work is continuing to refine the overall project economics, specifically in respect of off-take agreements with respect to the Power Plant (defined below); and the mining contractor opportunities, prior to making any definitive announcements on the overall economics. The Government of Sindh in recent published announcements recognises a Project IRR in excess of 20 per cent assuming completion of certain financing milestones.

 

"The Board looks forward to progressing the technical feasibility study to bankable standard ("BFS") in 2012, when we will also be seeking direct funding for the mining project."

 

The FS is targeting the development of a lignite mining operation (the "Lignite Mining Project", "LMP") to supply a mine-site power station with an annual mine production target of 5Mwt (47.80 per cent moisture) of lignite at an overall stripping ratio of 8.54bcm to one wet tonne lignite and a total mine-site production cost of US$42.21 per wet tonne of lignite (47.80per cent moisture) delivered over an expected mine life of 23 years.

 

The total mine site capital expenditure for construction and development to full production is US$610m with an expected construction period of 27 months. The current FS defines sufficient coal reserves to support a 23 year mine life, defined as Phase 1.

 

The FS was compiled by SRK Consulting (UK) Limited ("SRK") with certain of the underlying technical disciplines (Geology; Mineral Resources and Ore Reserves; Mining Engineering; Hydrogeology - mine site; Geochemistry; and Financial Modelling) authored by SRK directly and others, whilst reviewed by SRK, authored as follows: Environmental and Social Studies by Wardell Armstrong LLP and Hagler Bailey Pakistan (Pvt) Limited; Hydrogeology- semi regional ground water by RPS Aqua Terra (Pty) Limited; Infrastructure by WSP Group plc.

 

Where appropriate, local consultants were also employed to complete certain tasks, under the supervision of the above named consultancies. The specific scope of the FS was limited to the mine site and specifically excludes any consideration for the development, construction and operation of the Power Generation Plant Project ("Power Plant").

 

Further work is required to progress this Feasibility Study to a bankable standard ("BFS"). The environmental work completed to date has targeted compliance with both local regulatory requirements and international standards (specifically: Equator Principles, IFC Performance Standards, World Bank EHS Guidelines and ICMM guidelines).

 

Although further work is required, the economic viability of the LMP is dependent upon various assumptions in respect of the Power Plant which are not yet supported by a BFS.

 

The reporting standard adopted for the reporting of the Mineral Resource and Ore Reserve Statements for the LMP is that defined by the terms and definitions given in "The 2004 Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the "JORC Code") as published by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia". The JORC Code is an internationally recognised reporting code as defined by the Combined Reserves International Reporting Standards Committee.

 

For further information, please follow this link to view the mining area at:

http://www.oraclecoalfields.com/graphic.pdf

The total Mineral Resource of the mining area reported by SRK to Oracle is 529Mwt lignite which comprises total Measured and Indicated Mineral Resources of 459Mwt lignite and Inferred Mineral Resources of 70Mwt lignite. Individual qualities for each classification are included in the table below where the following also apply:

 

1. Measured and Indicated Mineral Resources are inclusive of those Mineral Resources modified to produce Coal Reserves, i.e. they are reported on an 'inclusive basis'; and

 

2. Mineral Resources are deemed to be potentially economic by open-pit methods and are constrained within an optimised shell corresponding to a long term price ("LTP") assumption of US$60 per wet tonne.

 

Mineral Resource Statement 03 January 2012

Mineral Resources

Tonnage

Moisture

RD

Gross CV

Ash

Sulphur

(M wt)

(%)

(wg/cm3)

(kcal/wkg)

(%)

(%)

Measured

151

48.00

1.15

3,025

5.10

0.60

Indicated

308

45.30

1.15

3,257

5.60

0.91

Subtotal

459

46.19

1.15

3,181

5.44

0.81

Inferred

70

45.40

1.15

3,193

8.90

1.58

Total

529

46.08

1.15

3,182

5.89

0.91

 

The total Coal Reserves reported as at 03 January 2012 within Phase 1 are 113Mwt, all of which are classified as Probable Coal Reserves. This comprises both Measured (80 per cent) and Indicated (20 per cent) Mineral Resources modified to Coal Reserves reporting within an engineered pit design based on a LTP assumption of US$37.50Mwt of lignite. The classification of all Coal Reserves as Probable is a direct consequence of assumptions regarding certain of the modifying factors and sales revenue. Furthermore, the declaration of Coal Reserves assumes the successful granting of a mining licence.

 

The assumed modifying factors include lignite weighted average (tonnage basis): mining losses of 7 per cent. (ranging from 3 per cent to 26 per cent); dilution of 6 per cent (ranging from 3 per cent to 29 per cent); and dilutant quality 100 per cent Ash.

 

Phase 1 Coal Reserve Statement 03 January 2012

Coal Reserves

Tonnage

Moisture

RD

Gross CV

Ash

Sulphur

(M wt)

(%)

(wg/cm3)

(kcal/wkg)

(%)

(%)

Proved

-

-

-

-

-

-

Probable

113

47.80

1.18

2,831

11.50

0.79

Total

113

47.80

1.18

2,831

11.50

0.79

 

The Competent Person who assumes responsibility for reporting of the mineral resources is Mr Paul Bright, CEng, MIMMM, and BSc, who is an employee of SRK. He is a Member of the Institute of Materials, Metals and Mining ("IMMM") which is a Recognised Overseas Professional Organisation ("ROPO") within the meaning of the JORC Code. Mr Paul Bright is a coal geologist with over 30 years' experience in the coal mining industry and has been involved in the reporting of mineral resources on various properties internationally during the past five years.

 

The Competent Person who assumes responsibility for reporting of the coal reserves is Mr Vince Osborne, RPEQ (Aus), MAuSIMM, BSc, who is an employee of SRK. He is a Member of the Australian Institute of Mining and Metallurgy ("AuSIMM") which is a ROPO. Mr Vince Osborne is a mining engineer with over 25 years' experience in the coal mining industry and has been involved in the reporting of coal reserves on various properties internationally during the past five years.

 

Both Mr Bright and Mr Osborne have reviewed this announcement and have consented to its publication.

 

Further work

 

·; Completion of negotiations with an international mining contractor.

·; Finalisation of BFS including further studies to refine the following areas: geochemistry; hydrogeology; operating expenditure and capital expenditure updates; and power generation off-take agreements.

·; Completion of Environmental and Social Impact Assessment ("ESIA") in accordance with international standards.

·; Securing financial support for the engineering, procurement, construction and completion of the Lignite Mining Project.

·; Assessment of opportunities for securing supplementary off-take agreements with the cement industry in Pakistan.

·; Finalisation of mine site construction timeline following Completion of BFS and ESIA for the Power Plant.

 

There will be additional information available on the company website. This can be found at:

http://www.oraclecoalfields.com

 

For further information contact:

Oracle Coalfields PLC

Shahrukh Khan, CEO

 

Telephone: +44 (0) 207 317 4050

E-mail:s.khan@oraclecoalfields.com

Website: www.oraclecoalfields.com

Novus Capital Markets

Nicholas Lee, Charles Goodfellow

 

Telephone: +44 (0) 207 107 1881

 

Blythe Weigh Communications

Tim Blythe

Matthew Neal

 

Telephone: 0207 138 3204

+44(0) 7816 924 626

+44 (0) 7917 800 011

Libertas Capital Corporate Finance Limited

Sandy Jamieson , Neil Pidgeon

 

Telephone: +44 (0) 207 569 9650

- Ends -

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFEEFAIVIIF
Date   Source Headline
14th Sep 20207:00 amRNSPrivate Power and Infrastructure Board Meeting
9th Sep 202010:30 amRNSConversion Notice and Issue of Equity
8th Sep 20202:03 pmRNSPPIB Meeting with Consortium Scheduled
7th Sep 20204:08 pmRNSHolding(s) in Company
4th Sep 20206:27 pmRNSHolding(s) in Company
1st Sep 202011:18 amRNSConversion Notice and Issue of Equity
28th Aug 20202:06 pmRNSSecond Price Monitoring Extn
28th Aug 20202:00 pmRNSPrice Monitoring Extension
28th Aug 202012:30 pmRNSConsortium invited to meet with PPIB re LOI
17th Aug 20207:00 amRNSConversion Notice and Issue of Equity
29th Jul 20207:00 amRNSNon- Binding MoU signed with HH Private Office
21st Jul 20207:42 amRNSShareholder Q&A Recording
17th Jul 20204:15 pmRNSAGM 2020 Q&A
16th Jul 20204:15 pmRNSResult of AGM
14th Jul 20207:00 amRNSLOI Payment
13th Jul 20207:00 amRNSShareholder Q&A Session
9th Jul 20207:00 amRNSSubscription & Financing Facility
7th Jul 20204:45 pmRNSHolding(s) in Company
7th Jul 20201:15 pmRNSHolding(s) in Company
2nd Jul 20207:00 amRNSExercise of Warrants
29th Jun 20201:15 pmRNSExercise of Warrants
26th Jun 20203:00 pmRNSExercise of warrants and issue of equity
23rd Jun 20205:56 pmRNSNotice of AGM
23rd Jun 20207:00 amRNSFinal Results
22nd Jun 20209:06 amRNSSecond Price Monitoring Extn
22nd Jun 20209:00 amRNSPrice Monitoring Extension
4th Jun 20207:00 amRNSLOI Payment & Related Party Transaction
7th May 20204:45 pmRNSHolding(s) in Company
4th May 20204:00 pmRNSHolding(s) in Company
9th Apr 202012:30 pmRNSConference Call Highlights
7th Apr 202011:05 amRNSSecond Price Monitoring Extn
7th Apr 202011:00 amRNSPrice Monitoring Extension
3rd Apr 20209:00 amRNSQ1 2020 Update from the CEO
3rd Apr 20207:00 amRNSInvestor Engagement
27th Mar 20204:42 pmRNSSecond Price Monitoring Extn
27th Mar 20204:36 pmRNSPrice Monitoring Extension
18th Mar 20209:30 amRNSBoard Appointment
12th Mar 20203:15 pmRNSExercise of warrants and issue of equity
11th Mar 20207:00 amRNSSupport for Development of Thar Block VI
5th Mar 202012:15 pmRNSHolding(s) in Company
27th Feb 20204:09 pmRNSExercise of Warrants and Issue of Equity
26th Feb 20204:41 pmRNSSecond Price Monitoring Extn
26th Feb 20204:35 pmRNSPrice Monitoring Extension
25th Feb 20207:00 amRNSThar Block VI Developments
19th Feb 20204:41 pmRNSSecond Price Monitoring Extn
19th Feb 20204:35 pmRNSPrice Monitoring Extension
19th Feb 202011:15 amRNSConsortium Agreement
3rd Feb 20207:00 amRNSLock-In Agreement
31st Jan 202010:15 amRNSExercise of warrants and issue of equity
20th Jan 20202:15 pmRNSExercise of warrants and issue of equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.