Technical Feasibility Study

6 Feb 2012 07:00

RNS Number : 8046W
Oracle Coalfields PLC
06 February 2012
 



6 February 2012

Oracle Coalfields PLC

("Oracle" or the "Company")

 Technical Feasibility Study

Oracle Coalfields PLC (AIM:ORCP), the coal explorer and developer of a lignite mineral property located in the south-eastern desert of Sindh Province, Pakistan, today announces the results of the technical feasibility study ("FS") on Block VI of the Thar Coalfield.

 

The exploration licence for Block VI (NO.DMD/S/Ex-L-Coal (11)/10/2914) with an area of 66.1km2 ("Licence Area") is held by Oracle's 80 per cent owned subsidiary, Sindh Carbon Energy Limited ("Sindh Carbon"), a private company incorporated in Sindh Province, Pakistan. On 2November 2011 Sindh Carbon submitted an application for the conversion of the current exploration licence to a mining licence.

 

Highlights from the FS:

 

• Within the Licence Area there are Mineral Resources (reported in accordance with the terms and definitions of the JORC Code - defined below) in the mining area (approximately 20 square kilometres) of 529 millions of wet tonnes (Mwt) with gross calorific value (CV) of 3,182k calories per wet kilogramme (wkg), with ash content at 5.89 per cent and Sulphur at 0.91 per cent.

• Probable Coal Reserves (Phase 1 of Mining Area) of 113Mwt with gross CV 2,831kcal/wkg, Ash 11.50 per cent and Sulphur 0.79 per cent with a strip ratio of 8.54bcm waste (Bank Cubic Metre):1wt lignite.

• Total capital expenditure for open cast mine development is estimated at US$610m (including US$224m for mining equipment) for 5Mwt per annum of lignite production.

• Total cash cost of production of US$42.21 per wet tonne.

• Confirmed product quality suitable for power generation.

• 23 year mine life.

 

Shahrukh Khan, CEO of Oracle, said:

 

"This is another important step for Oracle as we look to provide a sustainable source of energy to Pakistan and bring its first large scale open-pit coal mine into production. The FS indicates the technical and economic viability of the mining project.

 

"Further work is continuing to refine the overall project economics, specifically in respect of off-take agreements with respect to the Power Plant (defined below); and the mining contractor opportunities, prior to making any definitive announcements on the overall economics. The Government of Sindh in recent published announcements recognises a Project IRR in excess of 20 per cent assuming completion of certain financing milestones.

 

"The Board looks forward to progressing the technical feasibility study to bankable standard ("BFS") in 2012, when we will also be seeking direct funding for the mining project."

 

The FS is targeting the development of a lignite mining operation (the "Lignite Mining Project", "LMP") to supply a mine-site power station with an annual mine production target of 5Mwt (47.80 per cent moisture) of lignite at an overall stripping ratio of 8.54bcm to one wet tonne lignite and a total mine-site production cost of US$42.21 per wet tonne of lignite (47.80per cent moisture) delivered over an expected mine life of 23 years.

 

The total mine site capital expenditure for construction and development to full production is US$610m with an expected construction period of 27 months. The current FS defines sufficient coal reserves to support a 23 year mine life, defined as Phase 1.

 

The FS was compiled by SRK Consulting (UK) Limited ("SRK") with certain of the underlying technical disciplines (Geology; Mineral Resources and Ore Reserves; Mining Engineering; Hydrogeology - mine site; Geochemistry; and Financial Modelling) authored by SRK directly and others, whilst reviewed by SRK, authored as follows: Environmental and Social Studies by Wardell Armstrong LLP and Hagler Bailey Pakistan (Pvt) Limited; Hydrogeology- semi regional ground water by RPS Aqua Terra (Pty) Limited; Infrastructure by WSP Group plc.

 

Where appropriate, local consultants were also employed to complete certain tasks, under the supervision of the above named consultancies. The specific scope of the FS was limited to the mine site and specifically excludes any consideration for the development, construction and operation of the Power Generation Plant Project ("Power Plant").

 

Further work is required to progress this Feasibility Study to a bankable standard ("BFS"). The environmental work completed to date has targeted compliance with both local regulatory requirements and international standards (specifically: Equator Principles, IFC Performance Standards, World Bank EHS Guidelines and ICMM guidelines).

 

Although further work is required, the economic viability of the LMP is dependent upon various assumptions in respect of the Power Plant which are not yet supported by a BFS.

 

The reporting standard adopted for the reporting of the Mineral Resource and Ore Reserve Statements for the LMP is that defined by the terms and definitions given in "The 2004 Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the "JORC Code") as published by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia". The JORC Code is an internationally recognised reporting code as defined by the Combined Reserves International Reporting Standards Committee.

 

For further information, please follow this link to view the mining area at:

http://www.oraclecoalfields.com/graphic.pdf

The total Mineral Resource of the mining area reported by SRK to Oracle is 529Mwt lignite which comprises total Measured and Indicated Mineral Resources of 459Mwt lignite and Inferred Mineral Resources of 70Mwt lignite. Individual qualities for each classification are included in the table below where the following also apply:

 

1. Measured and Indicated Mineral Resources are inclusive of those Mineral Resources modified to produce Coal Reserves, i.e. they are reported on an 'inclusive basis'; and

 

2. Mineral Resources are deemed to be potentially economic by open-pit methods and are constrained within an optimised shell corresponding to a long term price ("LTP") assumption of US$60 per wet tonne.

 

Mineral Resource Statement 03 January 2012

Mineral Resources

Tonnage

Moisture

RD

Gross CV

Ash

Sulphur

(M wt)

(%)

(wg/cm3)

(kcal/wkg)

(%)

(%)

Measured

151

48.00

1.15

3,025

5.10

0.60

Indicated

308

45.30

1.15

3,257

5.60

0.91

Subtotal

459

46.19

1.15

3,181

5.44

0.81

Inferred

70

45.40

1.15

3,193

8.90

1.58

Total

529

46.08

1.15

3,182

5.89

0.91

 

The total Coal Reserves reported as at 03 January 2012 within Phase 1 are 113Mwt, all of which are classified as Probable Coal Reserves. This comprises both Measured (80 per cent) and Indicated (20 per cent) Mineral Resources modified to Coal Reserves reporting within an engineered pit design based on a LTP assumption of US$37.50Mwt of lignite. The classification of all Coal Reserves as Probable is a direct consequence of assumptions regarding certain of the modifying factors and sales revenue. Furthermore, the declaration of Coal Reserves assumes the successful granting of a mining licence.

 

The assumed modifying factors include lignite weighted average (tonnage basis): mining losses of 7 per cent. (ranging from 3 per cent to 26 per cent); dilution of 6 per cent (ranging from 3 per cent to 29 per cent); and dilutant quality 100 per cent Ash.

 

Phase 1 Coal Reserve Statement 03 January 2012

Coal Reserves

Tonnage

Moisture

RD

Gross CV

Ash

Sulphur

(M wt)

(%)

(wg/cm3)

(kcal/wkg)

(%)

(%)

Proved

-

-

-

-

-

-

Probable

113

47.80

1.18

2,831

11.50

0.79

Total

113

47.80

1.18

2,831

11.50

0.79

 

The Competent Person who assumes responsibility for reporting of the mineral resources is Mr Paul Bright, CEng, MIMMM, and BSc, who is an employee of SRK. He is a Member of the Institute of Materials, Metals and Mining ("IMMM") which is a Recognised Overseas Professional Organisation ("ROPO") within the meaning of the JORC Code. Mr Paul Bright is a coal geologist with over 30 years' experience in the coal mining industry and has been involved in the reporting of mineral resources on various properties internationally during the past five years.

 

The Competent Person who assumes responsibility for reporting of the coal reserves is Mr Vince Osborne, RPEQ (Aus), MAuSIMM, BSc, who is an employee of SRK. He is a Member of the Australian Institute of Mining and Metallurgy ("AuSIMM") which is a ROPO. Mr Vince Osborne is a mining engineer with over 25 years' experience in the coal mining industry and has been involved in the reporting of coal reserves on various properties internationally during the past five years.

 

Both Mr Bright and Mr Osborne have reviewed this announcement and have consented to its publication.

 

Further work

 

·; Completion of negotiations with an international mining contractor.

·; Finalisation of BFS including further studies to refine the following areas: geochemistry; hydrogeology; operating expenditure and capital expenditure updates; and power generation off-take agreements.

·; Completion of Environmental and Social Impact Assessment ("ESIA") in accordance with international standards.

·; Securing financial support for the engineering, procurement, construction and completion of the Lignite Mining Project.

·; Assessment of opportunities for securing supplementary off-take agreements with the cement industry in Pakistan.

·; Finalisation of mine site construction timeline following Completion of BFS and ESIA for the Power Plant.

 

There will be additional information available on the company website. This can be found at:

http://www.oraclecoalfields.com

 

For further information contact:

Oracle Coalfields PLC

Shahrukh Khan, CEO

 

Telephone: +44 (0) 207 317 4050

E-mail:s.khan@oraclecoalfields.com

Website: www.oraclecoalfields.com

Novus Capital Markets

Nicholas Lee, Charles Goodfellow

 

Telephone: +44 (0) 207 107 1881

 

Blythe Weigh Communications

Tim Blythe

Matthew Neal

 

Telephone: 0207 138 3204

+44(0) 7816 924 626

+44 (0) 7917 800 011

Libertas Capital Corporate Finance Limited

Sandy Jamieson , Neil Pidgeon

 

Telephone: +44 (0) 207 569 9650

- Ends -

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFEEFAIVIIF
Date   Source Headline
8th Jun 20177:00 amRNSMarket Update
24th May 20171:35 pmRNSNotice of Annual General Meeting
10th May 201711:21 amRNSResults for the Year Ended 31 December 2016
9th Jan 20177:00 amRNSChina Pakistan Economic Corridor
5th Jan 20171:00 pmRNSHolding(s) in Company
21st Dec 20169:38 amRNSChange in registered office address
4th Oct 20167:00 amRNSBoard Changes
15th Sep 20169:39 amRNSHoldings in Company
14th Sep 20167:00 amRNSUNAUDITED INTERIM RESULTS FOR 6 MONTHS TO 30 JUNE
17th Jun 20167:00 amRNSDetermination of Feasibility Stage Coal Price
7th Jun 20166:08 pmRNSHolding(s) in Company
3rd Jun 20163:34 pmRNSStatement regarding Share Price Movement
22nd Apr 20162:58 pmRNSAppointment of Interim Chairman
20th Apr 20166:08 pmRNSResult of AGM
24th Mar 20169:26 amRNSHoldings in Company
21st Mar 20167:00 amRNSExtension of IRR arrangement
18th Mar 20167:00 amRNSResults for the Year Ended 31 December 2015
5th Nov 20157:00 amRNSLetter of No Objection on 600 MW Power Plant
16th Oct 20154:40 pmRNSSecond Price Monitoring Extn
16th Oct 20154:35 pmRNSPrice Monitoring Extension
12th Oct 20157:00 amRNSSigning of Consortium Agreement
24th Sep 20157:00 amRNSUnaudited Interim Results
11th Aug 20151:11 pmRNSAdmission of Coal Price Petition
4th Jun 20157:00 amRNSHolding(s) in Company
4th Jun 20157:00 amRNSHolding(s) in Company
20th May 20152:49 pmRNSResult of AGM
14th Apr 20157:00 amRNSFinal Results
17th Mar 20157:00 amRNSEXTENSION TO SEPCO EPC FRAMEWORK AGREEMENT
11th Mar 20157:00 amRNSChina-Pakistan Economic Corridor
25th Feb 20156:27 pmRNSCorrection: Result of General Meeting
25th Feb 201511:27 amRNSResult of General Meeting
23rd Feb 20157:00 amRNSMINING LEASE RESTORATION
9th Feb 20157:00 amRNSEquity Placing and Operational Update
6th Jan 20157:00 amRNSProgress Towards Reinstatement of Mining Lease
23rd Dec 20149:03 amRNSDiscussions with SEPCO continue
22nd Dec 20147:00 amRNSAppointment of Joint Broker
11th Dec 20147:00 amRNSMining Lease
25th Sep 20147:00 amRNSEPC Framework Agreement with SEPCO
23rd Sep 20147:00 amRNSInterim Results
16th Sep 20147:00 amRNSEquity Placing
21st May 20144:29 pmRNSResult of AGM
16th Apr 20147:00 amRNSResults for the Year ended 31 December 2013
17th Jan 201412:43 pmRNSMilestone development of Block VI, Thar Project
21st Nov 20137:00 amRNSOracle signs MOU with Chinese power group SEPCO
25th Oct 20137:00 amRNSCash Box Placing
30th Sep 20131:36 pmRNSUnaudited Interim Results
24th Sep 20137:00 amRNSJoint Development Agreement Signed
19th Aug 20133:47 pmRNSAdjournment of General Meeting
30th Jul 20137:00 amRNSNotice of General Meeting
23rd May 20137:00 amRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.