Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNAUT.L Regulatory News (NAUT)

  • There is currently no data for NAUT

Operations Update

17 Oct 2005 07:00

Global Energy Development PLC17 October 2005 Immediate Release 17 October 2005 GLOBAL ENERGY DEVELOPMENT PLC COMMENCEMENT OF PILOT TEST PHASE OF TORCAZ FIELD CYCLIC CO2 PROJECT IMPROVED RECOVERY PROGRAMME Global Energy Development PLC ("Global" or the "Company"), the Latin Americafocused petroleum exploration and production company (LSE-AIM: "GED"), ispleased to announce the commencement of the Pilot Test Phase of its Torcaz FieldCyclic CO2 Project. The Torcaz Field currently has two producing wells and lies within Global'sapproximate 54,700 acre Bocachico Association Contract located in the MiddleMagdalena Valley of Central Colombia. The Torcaz field oil quality is 15 degreesAPI and as such is classified as heavy. The Pilot Test Phase of the Cyclic CO2 Injection Project represents theimplementation of an engineering feasibility study conducted by the Company'sindependent engineers which recommended CO2 should be injected on a cyclic basisinto the producing Torcaz wells to assess the effect on production and reserverecovery rates in the Torcaz Field. The effect of CO2 injection should be to swell the oil in place thereby reducingits density and viscosity, improving overall oil mobility in and around eachwellbore and potentially increase production and reserve recovery rates. Currently, proved and probable reserve recovery rates for the Torcaz Field areestimated by Global's independent engineers to be less than 3% of the originaloil in place. The management of Global believe, following analysis of theengineering feasibility study, that if the Project is successful there could bea four-fold improvement in recovery rates. Total Torcaz Field proved and probable original oil in place was estimated byindependent engineers to be approximately 144 million barrels as at 31 December2004 with recoverable proved and probable reserves net to Global estimated to bealmost 3 million barrels. The Company has commenced equipment specification and purchasing and in additionhas already located a nearby source of CO2 supply of sufficient quality andvolume to meet the requirements of the feasibility study. Presently, Global estimates injection of CO2 will begin in at least one of itsTorcaz wells by the end of the year. When the Pilot Test is completed theCompany will provide the operating data to its independent engineers for furtheranalysis to determine how Cyclic CO2 Injection could benefit field-widedevelopment and production. Commenting on the Torcaz CO2 Pilot Test, Stephen Voss, Global's ManagingDirector, said: "We are most excited about the hugely positive effect cyclic CO2 injection couldhave on our Torcaz Field which is currently characterized by low productivitybut significant reserves and we hope to see encouraging production results bythe end of the year. There is a substantial volume of proved and probable original oil in place thatcould be converted into recoverable reserves based on the results of the PilotTest. Should results be encouraging, the Company will proceed to prepare theengineering and geological plans necessary to develop the Torcaz Field, whichour independent engineers currently estimate will require at least 20 wells inthe Proved and Probable Reserve Recovery Phase." For further information: Global Energy Development PLCCatherine Miles, director of Investor Relations +44 (0) 20 7763 7177www.globalenergyplc.com +44 (0) 7909918034 Notes to Editors: Global currently holds approximately 5.1 million acres through six contracts inColombia and Peru, an exclusive Technical Evaluation Agreement ("TEA") inColombia and a concluded exclusive TEA in Panama which is in the process ofbeing converted into an exclusive contract. As at 31 December 2004, Global hadindependently reported proved and probable reserves totaling 16.5 million BOE. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th Mar 20117:00 amRNSReserve Report
4th Feb 20117:00 amRNSExtension Of Loan Agreement
31st Jan 20117:00 amRNSTotal Voting Rights
20th Jan 20117:00 amRNSStrategy Update and Nomination
17th Jan 20117:00 amRNSPurchase and Cancellation of Loan Notes
13th Dec 20107:00 amRNSFarm-Out Agreement
12th Oct 20101:01 pmRNSInterim Report
12th Oct 20107:00 amRNSOperating Update
16th Sep 20107:00 amRNSInterim Results
15th Sep 20107:00 amRNSLoan Agreement
30th Jul 20107:00 amRNSContract Relinquishment
15th Jul 20107:00 amRNSOperations Update
9th Jul 20107:00 amRNSDirector Shareholding
30th Jun 20107:00 amRNSDirector Shareholding
15th Jun 20107:00 amRNSWell Testing Result
28th May 20107:00 amRNSWell Testing Update
14th May 20104:26 pmRNSResult of AGM
19th Apr 201010:00 amRNSAdvisory Board
19th Apr 20109:30 amRNSPosting Of Annual Report And Accounts
6th Apr 20107:00 amRNSAppointment
29th Mar 20107:00 amRNSWell Spudded
11th Mar 20107:00 amRNSThree Year Plan
11th Mar 20107:00 amRNSFinal Results
10th Mar 20107:00 amRNSRig Mobilisation
12th Feb 20107:00 amRNSRig Contract
3rd Feb 20107:00 amRNSNew Reserve Report
24th Sep 20095:23 pmRNSPosting of Interim Report
3rd Sep 20097:00 amRNSInterim Results
27th Jul 20097:00 amRNSAcquisition of Seismic
30th Jun 20093:52 pmRNSUpdate to Total Voting Rights
19th May 200912:06 pmRNSAnnual Report & Accounts
20th Apr 20097:00 amRNSFinal Results
30th Mar 20097:00 amRNSChange of Adviser
17th Feb 20097:00 amRNSOperations Update
30th Jan 20097:00 amRNSDirectorate Change
19th Dec 20082:50 pmRNSShare Option Grant
7th Nov 20083:41 pmRNSDirector Shareholding
7th Nov 20083:38 pmRNSChange of Nomad
9th Oct 20082:10 pmRNSChange of Adviser Name
2nd Oct 20087:00 amRNSEnvironmental Approval
22nd Sep 20087:00 amRNSInterim Results
8th Sep 20087:00 amRNSWell Test Result
27th Aug 20087:00 amRNSWell Test Result
8th Aug 20087:00 amRNSWell Test Result
6th Aug 200812:01 pmRNSNotifiable Interest
4th Aug 20087:00 amRNSWell Test Result
16th Jul 20089:44 amRNSShare Option Grant
2nd Jul 20084:35 pmRNSResult of AGM
2nd Jul 20087:00 amRNSAGM Update
1st Jul 200812:03 pmRNSNotifiable Interest

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.