Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNAUT.L Regulatory News (NAUT)

  • There is currently no data for NAUT

Operations Update

17 Oct 2005 07:00

Global Energy Development PLC17 October 2005 Immediate Release 17 October 2005 GLOBAL ENERGY DEVELOPMENT PLC COMMENCEMENT OF PILOT TEST PHASE OF TORCAZ FIELD CYCLIC CO2 PROJECT IMPROVED RECOVERY PROGRAMME Global Energy Development PLC ("Global" or the "Company"), the Latin Americafocused petroleum exploration and production company (LSE-AIM: "GED"), ispleased to announce the commencement of the Pilot Test Phase of its Torcaz FieldCyclic CO2 Project. The Torcaz Field currently has two producing wells and lies within Global'sapproximate 54,700 acre Bocachico Association Contract located in the MiddleMagdalena Valley of Central Colombia. The Torcaz field oil quality is 15 degreesAPI and as such is classified as heavy. The Pilot Test Phase of the Cyclic CO2 Injection Project represents theimplementation of an engineering feasibility study conducted by the Company'sindependent engineers which recommended CO2 should be injected on a cyclic basisinto the producing Torcaz wells to assess the effect on production and reserverecovery rates in the Torcaz Field. The effect of CO2 injection should be to swell the oil in place thereby reducingits density and viscosity, improving overall oil mobility in and around eachwellbore and potentially increase production and reserve recovery rates. Currently, proved and probable reserve recovery rates for the Torcaz Field areestimated by Global's independent engineers to be less than 3% of the originaloil in place. The management of Global believe, following analysis of theengineering feasibility study, that if the Project is successful there could bea four-fold improvement in recovery rates. Total Torcaz Field proved and probable original oil in place was estimated byindependent engineers to be approximately 144 million barrels as at 31 December2004 with recoverable proved and probable reserves net to Global estimated to bealmost 3 million barrels. The Company has commenced equipment specification and purchasing and in additionhas already located a nearby source of CO2 supply of sufficient quality andvolume to meet the requirements of the feasibility study. Presently, Global estimates injection of CO2 will begin in at least one of itsTorcaz wells by the end of the year. When the Pilot Test is completed theCompany will provide the operating data to its independent engineers for furtheranalysis to determine how Cyclic CO2 Injection could benefit field-widedevelopment and production. Commenting on the Torcaz CO2 Pilot Test, Stephen Voss, Global's ManagingDirector, said: "We are most excited about the hugely positive effect cyclic CO2 injection couldhave on our Torcaz Field which is currently characterized by low productivitybut significant reserves and we hope to see encouraging production results bythe end of the year. There is a substantial volume of proved and probable original oil in place thatcould be converted into recoverable reserves based on the results of the PilotTest. Should results be encouraging, the Company will proceed to prepare theengineering and geological plans necessary to develop the Torcaz Field, whichour independent engineers currently estimate will require at least 20 wells inthe Proved and Probable Reserve Recovery Phase." For further information: Global Energy Development PLCCatherine Miles, director of Investor Relations +44 (0) 20 7763 7177www.globalenergyplc.com +44 (0) 7909918034 Notes to Editors: Global currently holds approximately 5.1 million acres through six contracts inColombia and Peru, an exclusive Technical Evaluation Agreement ("TEA") inColombia and a concluded exclusive TEA in Panama which is in the process ofbeing converted into an exclusive contract. As at 31 December 2004, Global hadindependently reported proved and probable reserves totaling 16.5 million BOE. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
3rd Feb 20127:00 amRNSBOLIVAR PROJ-CATALINA #1 SIMITI FORMATION UPDATE
1st Feb 20127:00 amRNSLong Term Financing Update
30th Jan 20127:00 amRNSChops Technology
17th Jan 20127:00 amRNSTORCAZ 5 PROGRESSING
10th Jan 20127:00 amRNSAssignment Of Peru Block 95 Completed
30th Dec 20117:00 amRNSEXERCISE OF OPTIONS
15th Dec 20117:00 amRNSREDUCTION IN CONVERTIBLE DEBT OBLIGATIONS
7th Nov 20117:00 amRNSDevelopment Plans Update
19th Oct 20117:00 amRNSEarly Redemption Of Debt Obligation
18th Oct 20117:00 amRNSDIRECTOR SHAREHOLDING
17th Oct 20117:00 amRNSChange of Adviser
14th Oct 201110:28 amRNSDIRECTOR SHAREHOLDING
3rd Oct 20117:00 amRNSAnnouncement of Acceptance Levels&Closing of Offer
3rd Oct 20117:00 amRNSDevelopment Plans Update
29th Sep 20117:00 amBUSForm 8.3 - Global Energy Development Plc
26th Sep 20117:00 amBUSForm 8.3 - Global Energy Development Plc
14th Sep 20112:48 pmRNSForm 8.3 - [Global Energy Development Plc]
14th Sep 20117:00 amBUSForm 8.3 - Global Energy Development Plc
13th Sep 20112:47 pmRNSForm 8.3 - [Global Energy Development Plc]
13th Sep 20117:00 amBUSForm 8.3 - Global Energy Development Plc
9th Sep 20114:41 pmRNSInterim Report
9th Sep 20113:31 pmRNSPosting of Offer Document
6th Sep 20117:00 amRNSInterim Results
5th Sep 20117:00 amBUSForm 8.3 - Global Energy Development Plc
31st Aug 20112:44 pmRNSUpdate on Cash Offer
31st Aug 201110:36 amRNSForm 8 (DD) - Global Energy Development PLC
24th Aug 20112:52 pmRNSForm 8.3 - [Global Energy Devlopment Plc]
24th Aug 20117:00 amBUSForm 8.3 - Global Energy Development Plc
22nd Aug 20117:00 amBUSForm 8.3 - Global Energy Development Plc
15th Aug 20117:00 amBUSForm 8.3 - Global Energy Development Plc
11th Aug 20112:05 pmRNSForm 8.3 - [Global Energy Development Plc]
29th Jul 20117:00 amRNSPeru Block 95 Update
15th Jul 20117:00 amRNSPostponement of posting of Offer Document
1st Jul 20119:59 amRNSForm 8.3 - Global Energy Development PLC
30th Jun 201112:02 pmRNSPublic Opening Position Disclosure
28th Jun 20113:25 pmRNSResult of AGM
27th Jun 20112:49 pmRNSDIRECTOR SHAREHOLDING
20th Jun 20117:00 amRNSProduction rates increase
17th Jun 20114:15 pmRNSPOSTING OF OFFER ANNOUNCEMENT
17th Jun 20112:19 pmRNSForm 8.3 - [Global Energy Development Plc]
17th Jun 201110:23 amRNSPublic Opening Position Disclosure
16th Jun 20119:07 amRNSCash Offer
8th Jun 20117:00 amRNS100% Increase in Product Uplift
24th May 20117:00 amRNSAcquisition of New 3d Seismic - Bocachico
20th May 20117:00 amRNSPosting of Annual Report and Accounts
20th Apr 20117:00 amRNSAcquisition of New 3d Seismic - Bolivar
18th Apr 20117:00 amRNSAppt of Adviser and Change of Registered Office
12th Apr 20114:05 pmRNSExercise of Options and Director Shareholding
24th Mar 20117:00 amRNSAudited Final Results
14th Mar 20117:00 amRNSPERSONNEL CHANGE AND APPOINTMENTS

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.