Max Petroleum Plc, an oil and gas exploration and production company focused on Kazakhstan, is pleased to announce an update on production test results and development plans for its Uytas Field.

Β 

Highlights include:

Β 

Β·; Interpretation of 3D seismic data acquired in late 2011 has revealed a structure larger than previously identified;

Β·; Company estimates overall oil in place of 184 million barrels ("mmbo"), including:

o 58 mmbo in conventional Cretaceous Aptian ("Aptian") and Jurassic reservoirs;

o 126 mmbo in shallower, non-conventional Cretaceous Albian ("Albian") reservoirs;

Β·; Well tests have confirmed commercial productivity from the Aptian and Jurassic sandstone reservoirs with Phase One of an appraisal and development programme expected to include approximately 30 low-cost, shallow vertical wells;

Β·; Based on testing and core analysis, the Company is planning an enhanced oil recovery pilot project using steam injection to determine the commerciality of the Albian reservoirs.

Β 

Conventional Production

Β 

The Aptian Formation is generally present in the field as sandstone reservoirs from two to eight metres thick at depths ranging from 110 to 165 metres. The Company initially produced oil from this formation in the UTS-1 discovery well in January 2011. Recent extended production tests from the UTS-2 well have confirmed the commerciality of the formation. From perforations at depths between 132 to 136 metres and 144 to 148 metres, the UTS-2 well has produced 26 degree gravity oil with no water at an average rate of 45 barrels of oil per day ("bopd") for two months with no decline. Similar reservoirs are also present in the UTS-4 well, but have not yet been tested. The sandstone reservoirs in the Aptian Formation are of excellent quality with up to 37% porosity. Based on the production tests in the UTS-1 and UTS-2 wells, cores taken in the UTS-2 and UTS-4 wells, and the new 3D seismic data, the Company estimates oil in place of 42 mmbo in the Aptian Formation. The Company currently estimates the oil recovery factor will be about 20%, but additional drilling and testing will be needed before the recovery factor can be confirmed.

Β 

The Jurassic Formation produced 27 degree gravity oil in the UTS-1 well (as previously reported in January 2011). Testing of Jurassic reservoirs in the UTS-3 well began recently with perforations from 428 to 432 metres in depth, producing at an initial indicative rate of 47 bopd. The Company currently estimates overall oil in place of 16 mmbo in the Jurassic reservoirs, with potential recoveries of approximately 20%.

Β 

Structure map of Uytas Field at the top of the Cretaceous Aptian Formation. Estimated oil/water contact for the Aptian is indicated by the heavy green line: -

Β 

http://www.rns-pdf.londonstockexchange.com/rns/3504B_-2012-4-13.pdf Β 

Β 

Non-conventional Production

Β 

The Albian Formation, present across the field at depths ranging from 40 to 100 metres, was extensively cored in the UTS-2 and UTS-4 wells. Analysis of these cores confirms up to 67% oil saturation in sandstone reservoirs, but initial production tests in the UTS-1 and UTS-4 wells have only produced water, suggesting the oil is too viscous to flow into the wellbore under natural conditions. Further testing of the UTS-4 well, involving injecting light oil into the reservoir as a solvent, resulted in production of new oil from the reservoir. The results of the new seismic mapping, combined with the new core and logging data from the UTS-2 and UTS-4 wells was used to generate an estimate of 126 mmbo of oil in place in the Albian Formation. This oil does not appear to be recoverable using conventional production techniques, but an ongoing study is being conducted by a Houston-based reservoir consulting firm to identify appropriate enhanced oil recovery techniques and advise on further testing and design, including a steam injection pilot project.

Β 

Production Plans

Β 

On the basis of the recent test results, the Company is preparing a Phase One development plan for Uytas to drill approximately 30 additional shallow (180 to 500 metre depth) wells to appraise and produce the conventional reservoirs in the Aptian and the Jurassic. Drilling is expected to commence in late 2012 and be completed over a period of about 12 months. The majority of these wells will target the Aptian, but four will specifically target the Jurassic reservoirs.

Β 

In addition, an enhanced oil recovery pilot project for the shallower Albian reservoirs, involving steam injection and oil recovery from three to five shallow wells (less than 100 metres) is being planned.

Β 

3D Seismic Data

Β 

The new 3D data set over the Uytas field is of excellent quality, identifying a four-way anticlinal structure at the top of the Jurassic Formation that is slightly larger than previously mapped. The data suggests there are relatively few faults, which will make development of the field more straightforward.

Β 

Reserves report

Β 

The Company's Competent Person, Ryder Scott & Company, LLP, is preparing an independent report on the Uytas Field as part of the Company's reserves report for the fiscal year ended 31 March 2012.

Β 

Michael B. Young, President and CFO, commented:

Β 

"The results from the first four wells, including extensive cores, and the new 3D seismic survey, have confirmed that the field is larger than we had originally thought and is well suited for development across its large structure with limited faulting. Most importantly, we have confirmed a significant conventional discovery in both the Cretaceous and Jurassic sections that can add meaningful short-term production and cash flow."

Β 

"The value of Uytas will be enhanced further if we are able to confirm the commerciality of the shallower Albian reservoirs. The initial results of injection tests are encouraging and we look forward to getting a pilot project in place to confirm the upside potential of the non-conventional resources in the field."

Β 

Β 

Β 

Enquiries:

Β 

Max Petroleum Plc

Β 

Β 

Michael Young

President and Chief Financial Officer

Tel: +44 (0)207 355 9590

Β 

Tom Randell

Director of Investor Relations

Β 

Merlin PR

Β 

David Simonson/ Anca Spiridon

Tel: +44 (0)207 726 8400

WH Ireland Ltd

Β 

Daniel Bate / Robin Gwyn

Tel: +44 (0)161 832 2174

Β 

Macquarie Capital

Paul Connolly / Steve Baldwin

Tel: +44 (0)203Β 037 2000

Oriel Securities

Michael Shaw / Ashton Clanfield

Tel: +44 (0)207Β 710 7600

Β 

Β 

Richard Hook, Chief Operating Officer of Max Petroleum, is the qualified person that has reviewed and approved the technical information contained in this announcement. Mr. Hook is a member of the Houston Geological Society and holds both Masters and Bachelors of Science degrees in geology.

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
MSCFMGMDVFLGZZM
Date   Source Headline
5th Oct 20157:00 amRNSCorporate Update and Cancellation of AIM Listing
28th Sep 201511:17 amRNSAGM Results
11th Sep 20152:21 pmRNSCorporate Update
9th Sep 20157:00 amRNSCorporate Update
4th Sep 20157:00 amRNSNotice of AGM
1st Sep 201512:48 pmRNSEGM Statement
25th Aug 20151:56 pmRNSCorporate Update
14th Aug 20157:00 amRNSPosting of Circular
27th Jul 201510:33 amRNSInitiation of Rehabilitation Process
13th Jul 20158:14 amRNSAGR Energy Investment in Max Petroleum
3rd Jul 20159:13 amRNSFinancial and Operational Update
1st May 20157:00 amRNSFinancial and Operational Update
20th Mar 20153:57 pmRNSFinancial and Operational Update
2nd Mar 20158:28 amRNSChange of Nominated Adviser and Broker
2nd Mar 20157:30 amRNSSuspension - Max Petroleum plc
2nd Mar 20157:30 amRNSStatement re Suspension
19th Feb 201512:18 pmRNSPrice move
13th Feb 20154:40 pmRNSSecond Price Monitoring Extn
13th Feb 20154:35 pmRNSPrice Monitoring Extension
13th Feb 201511:57 amRNSHolding(s) in Company
11th Feb 201511:41 amRNSHolding(s) in Company
9th Feb 20154:40 pmRNSSecond Price Monitoring Extn
9th Feb 20154:35 pmRNSPrice Monitoring Extension
9th Feb 20157:00 amRNSCorporate Update
6th Feb 20154:40 pmRNSSecond Price Monitoring Extn
6th Feb 20154:35 pmRNSPrice Monitoring Extension
9th Jan 20157:00 amRNSReserves Update
6th Jan 20154:35 pmRNSPrice Monitoring Extension
3rd Dec 20147:00 amRNSInterim Results
2nd Dec 20145:35 pmRNSHolding in Company
1st Dec 20145:12 pmRNSForm 8.3 - Max Petroleum PLC_Replacement
1st Dec 20145:10 pmRNSForm 8.3 - Max Petroleum PLC
1st Dec 20143:23 pmRNSForm 8.3 - Max Petroleum PLC
1st Dec 201412:31 pmRNSConclusion of Formal Sale Process
1st Dec 201410:33 amRNSEGM Statement
25th Nov 20145:21 pmRNSForm 8.3 - Max Petroleum PLC
20th Nov 20145:05 pmRNSForm 8.3 - MAX PETROLEUM PLC
20th Nov 20142:38 pmRNSForm 8.3 - Max Petroleum PLC
20th Nov 20147:00 amRNSForm 8.5 (EPT/RI)
19th Nov 20142:04 pmRNSForm 8.3 - Max Petroleum plc
19th Nov 20147:00 amRNSForm 8.5 (EPT/RI)
19th Nov 20147:00 amRNSForm 8.3 - Max Petroleum PLC
18th Nov 201411:47 amRNSForm 8.3 - Max Petroleum plc
17th Nov 20141:31 pmRNSForm 8.3 - Max Petroleum plc
17th Nov 20147:00 amRNSForm 8.3 - Max Petroleum PLC
14th Nov 20142:37 pmRNSForm 8.3 - Max Petroleum PLC
14th Nov 20147:00 amRNSForm 8.5 (EPT/RI)
13th Nov 20144:07 pmRNSForm 8.3 - Max Petroleum PLC
13th Nov 20143:22 pmRNSForm 8.3 - Max Petroleum PLC
13th Nov 20147:00 amRNSForm 8.5 (EPT/RI)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.