Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMetals Exploration Regulatory News (MTL)

Share Price Information for Metals Exploration (MTL)

Share Price is delayed by 15 minutes
Get Live Data
13.15    0.00 (0.00%)
Bid:
13.00
Ask:
13.30
Spread: 0.30 (2.308%)
Market Cap: £393.37m
MTL Live PriceLast checked at - London Stock Exchange

Intraday Metals Exploration Share Chart

Drilling Report

9 May 2005 15:36

Metals Exploration PLC09 May 2005 IMMEDIATE RELEASE 9 MAY 2005 METALS EXPLORATION PLC RECONNAISSANCE MAPPING AND SAMPLING AT RUNRUNO PROJECT IDENTIFIES WIDE ZONE OF GOLD AND MOLYBDENUM MINERALISATION OVER 2.2 KILOMETRES Metals Exploration is pleased to announce the surface delineation of a 100 metrewide, continuous zone of gold+molybdenum+copper+silver mineralisation over astrike length of at least 2,200 metres and down-dip depth of up to 400 metres.Preliminary results from rock-chip sampling of the northern and southern limitsof the mineralised zone defined so far have just been received this morning.Gold assays results of 1.2 to 4.89 g/t Au have been obtained from the northernend and for the southern end gold assay results range up to 2.5 g/t Au. TheCompany is waiting for conformation of the gold analyses from the laboratory aswell as analytical results for molybdenum, silver and other elements. The zoneof mineralisation is believed to extend to depth, further to the north andpossibly to the south as well. Mapping is continuing to define the strike limitsto the structure. Results from recent rock-chip sampling in March and April of the 'high-grade'miners' tunnels located in the central part of the mineralised zone have justbeen received with results ranging up to 54 g/t Au and 4,300 ppm Mo The Companyis highly encouraged by these results. Surface sampling of the mineralised zoneis currently underway and the Company is anticipating receiving the firstresults in the next few days of the first batch of surface rock-chip samplingand trenching programs. The Runruno Project comprises one Exploration Permit (EP-II-13) and is locatedsome 210 kilometres to the north-northeast of Manila in Northern Luzon. Theproperty is adjacent to Climax Mining Ltd's Didipio project, which contains theDinkidi gold+copper deposit with a reported global resource of 121 milliontonnes, grading 0.97 g/t Au and 0.39% Cu, for contained 3.8 million ounces ofgold and 470,000 tonnes of copper. Gold was first discovered at Runruno during the early 1960s and itinerant'high-grade' miners have since been selectively mining the higher gold grademineralisation within the main mineralised zone. From 1969 to 1974, Fil-Am Resources Inc. ("Fil-Am") completed a total ofapproximately 8,670 metres of diamond drilling in the central part of themineralised zone, over a strike length of approximately 600 metres, opened 3adits and developed 800 metres of exploratory drives. Results of Fil-Am'schannel sampling of the exploratory drives returned significant results rangingup to 11.82 ounces/tonne gold (367 g/t Au) with the main area averaging 2.8ounces/tonne gold (87 g/t Au) over 40 metres by 20 metres. In 1978 and 1979 a feasibility study was completed by two Japanese companies,and a 1980 feasibility report gave an estimated resource, at 0.8 g/t Au cutoff,of 13.4 million tonnes with an average grade of 1.4 g/t Au and 3.29 g/t Ag for contained 600,000 ounces of gold to a depth of approximately 200 metres belowthe highest part of the deposit. Towards the end of 2000 and early 2001, Placer Dome Exploration Pty Ltd('Placer') completed 11 diamond drill holes for a total of 2,020 metres. Onlytwo holes were drilled through the mineralised zone with another two abandonedat the upper contact of the zone. The remaining holes targeted geophysicalanomalies elsewhere within the tenement. Best results from the two holes whichintersected the mineralised zone are 24m @ 1.74 g/t Au from 42 metres and 12m @2.06 g/t Au from 140 metres in hole RUD-0001, and 10m @ 3.91 g/t Au and 246ppmMo from 4 metres; 8m @ 4.45 g/t Au and 404 ppm Mo from 28 metres and 30m @ 2.07g/t Au and 749ppm Mo from 72 metres. At the present prices of gold and molybdenum, US$430/oz and US$35/lbrespectively, the Company believes that the Runrunogold+molybdenum+copper+silver deposit has good potential to be increased invalue through increasing the tonnage by further drilling of the strike and depthextensions and by analysing future drill samples for gold and molybdenum. Notes: 1. Analyses of element in parts per million ("ppm") is equivalent to grams per tonne ("g/t") 2. Chemical Symbols are given for gold (Au); silver (Ag); molybdenum (Mo). 3. Abbreviations are given for ounce (oz); pound (lb), US dollars (US $) Qualified Person Gary Powell has been involved in the mining and exploration industry for morethan 20 years. He has a Bachelor of Applied Science degree in geology, and is amember of the Australasian Institute of Mining and Metallurgy ("AusIMM") and theAustralasian Institute of Geoscientists ("AIG"). He has compiled, read andapproved the technical disclosure in this regulatory announcement. Contact: Steven Smith, Chairman 07797 721 858Jonathan Anderson, Investor Relations 07950 410 680 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
9th Oct 20182:08 pmRNSBanking and Operational Update
28th Sep 20187:16 amRNSInterim Results
17th Sep 20188:26 amRNSTyphoon Mangkhut
29th Aug 201810:37 amRNSBanking Update
31st Jul 20188:47 amRNSBanking Update
25th Jul 20187:00 amRNSWorking Capital Funding
23rd Jul 201810:15 amRNSQuarterly Update To 30 June 2018
5th Jul 20189:19 amRNSOperations Update
29th Jun 201811:05 amRNSBanking Update
19th Jun 20183:20 pmRNSResult of AGM
24th May 20187:00 amRNSFinal Results For The Year Ended 31 December 2017
18th May 20187:00 amRNSAnnual General Meeting Announcement
10th May 20181:15 pmRNSDirectorate Change
20th Apr 20187:00 amRNSQuarterly Update To 31 March 2018
16th Apr 20187:25 amRNSDIRECTOR/PDMR SHAREHOLDING
9th Apr 20186:10 pmRNSDIRECTOR/PDMR SHAREHOLDING
29th Mar 20187:00 amRNSStandby Funding
23rd Jan 20187:00 amRNSQuarterly Update To 31 December 2017
28th Dec 20177:00 amRNSRunruno Scheduled Capital & Interest Payment
13th Dec 20177:00 amRNSRunruno Project Update to 12 December
19th Oct 20177:00 amRNSQuarterly Update To 30 September 2017
2nd Oct 20178:33 amRNSUS$21m Mezzanine Facility Documentation Completed
29th Sep 201711:45 amRNSInterim Results
29th Sep 201711:45 amRNSMezzanine Debt Facility
19th Sep 20177:00 amRNSOperations and Mezzanine Debt Facility Update
26th Jul 20177:00 amRNSQuarterly Update To 30 June 2017
30th Jun 20177:00 amRNSShort Term Funding Secured
15th Jun 201712:36 pmRNSResults of AGM
31st May 20177:00 amRNSFunding Update
24th May 20178:40 amRNSFunding
22nd May 20177:00 amRNSFinal Results For The Year Ended 31 December 2016
18th May 20177:00 amRNSAnnual General Meeting Announcement
24th Apr 201710:15 amRNSQuarterly Update To 31 March 2017
10th Apr 20178:28 amRNSDirector Resignation
15th Mar 20177:00 amRNSRunruno Gold project Update
18th Jan 201710:00 amRNSAppointment of Nominated Adviser and Broker
13th Jan 201711:14 amRNSDirector's Share Dealing
12th Jan 20171:50 pmRNSHolding(s) in Company
10th Jan 20179:50 amRNSDirector/PDMR Shareholding
19th Dec 201610:48 amRNSRescheduled Facility Agreement
8th Dec 20168:12 amRNSHolding(s) in Company
29th Nov 20167:33 amRNSFirst Gold Sale, Debt Rescheduling, Ramp Up
14th Nov 20167:00 amRNSEquity Raising
4th Oct 20163:04 pmRNSResults of General Meeting of Shareholders
30th Sep 20169:03 amRNSInterim Results
15th Sep 20161:52 pmRNSHolding(s) in Company
14th Sep 201611:19 amRNSNotice of General Meeting
8th Sep 20169:54 amRNSEquity Raising
26th Aug 201611:38 amRNSRunruno Gold Project Update
25th Jul 20162:37 pmRNSEquity Raising

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.