Less Ads, More Data, More Tools Register for FREE

Pin to quick picksManagement Resource Solutions Regulatory News (MRS)

  • There is currently no data for MRS

Drilling Update

19 Dec 2008 07:00

RNS Number : 4424K
Melrose Resources PLC
19 December 2008
 



FOR IMMEDIATE RELEASE

19 December 2008

Melrose Resources plc

Drilling Update

Melrose Resources plc (LSE: MRS) ("Melrose" or "the Company"), the oil and gas exploration, development and production company, today provides an update on its drilling operations.

 

Bulgaria

In late October 2008, Melrose announced the results of the successful Kavarna No.1 exploration well, which made a gas discovery in the Black Sea, offshore Bulgaria. The well encountered a well developedgas bearing Paleocene reservoir formation and the initial reserves estimate for the discovery was 24 BcfPrior to running open hole logs a strong gas influx occurred into the wellbore and for safety reasons it became necessary to plug and re-drill the well

The replacement well, Kavarna No.2, has now been drilled and encountered 125 feet of net gas pay with an average porosity of 27%. These new well data have confirmed the initial reserves estimate. 

The Kavarna discovery is located approximately 7 kilometers to the east of the Melrose operated Galata gas field and 8 kilometers to the west of the Kaliakra discovery announced in early 2008. Given Kavarna's close proximity to the Galata field, the Kavarna No.2 well is currently being completed with a sub-sea tree to enable the well to be tied back to the Galata field facilities for production in the third quarter 2009. The Kaliakra discovery, which contains estimated reserves of 47 Bcf, ischeduled to be tied back to the Galata facilities for first production in 2010. 

Egypt

In Egypt, the North Dikirnis No.1 exploration well has been successfully drilled by the EDC-54 rig a on a prospect located approximately kilometers north of the West Dikirnis field. The well reached a total depth of 9,000 feet and encountered 29 feeof net pay in the Qawasim formation with an average porosity of 23%. The well was flow tested at rate of 7.7 MMcfpd of gas with 244 bpd of condensate and the initial reserves estimate for the discovery is in the range 3 Bcfe to Bcfe. Similar to Melrose's other recent discoveries in the Nile Delta, North Dikirnis No.1 will be tied back to existing facilities for production and is expected to come on stream in 2009.

The EDC-54 rig has now moved to drill the East Dikirnis exploration prospect in the El Mansoura concession which has unrisked reserves potential of 49 Bcfe with an estimated chance of success of 48%

The EDC-9 rig has completed operations on the West Dikirnis No.7 well which is the first horizontal oil producer to be drilled in the West Dikirnis field. The well reached a total depth of 11392 feet and an 810 feet long horizontal section was successfully drilled within the oil rim reservoir. The well is currently being tied back for testing and long term production and the EDC-9 rig is moving location to drill West Dikirnis No.10 as the second horizontal development well in the field.

Commenting on the update, David Thomas, Chief Executive said:

"We are pleased with the results from the Kavarna No.2 well, which confirm that the discovery has excellent reservoir quality and a net pay interval over 50thicker than previously encountered in the area. This bodes well for the remaining exploration potential on the Galata-Kaliakra geologic trend. The North Dikirnis No.1 well results in Egypt are also positive and we look forward to bringing the well on stream next year to provide incremental production volumes."

For further information please contact

Melrose Resources plc

Robert Adair, Executive Chairman

David Thomas, Chief Executive Officer

Munro Sutherland, Finance Director

0131 221 3360

Buchanan Communications Limited

Ben Willey/Ben Romney

0207 466 5000

or visit www.melroseresources.com

Glossary:

Bcf - billion cubic feet of gas 

Bcfe - billion cubic feet of gas equivalent 

bpd - barrels of oil or condensate per day

boepd - barrels of oil equivalent per day 

Mbbls - thousand barrels of oil or condensate 

MMcfpd - million cubic feet of gas per day

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFKFKNOBDDOBD
Date   Source Headline
20th Dec 20174:48 pmRNSHolding(s) in Company
20th Dec 20171:29 pmRNSFinal Results & Trading Update
2nd Nov 201710:35 amRNSHolding(s) in Company
30th Oct 201711:41 amRNSPayment of Deferred Consideration
30th Oct 201711:00 amRNSExercise of Warrants & Share Purchase by Director
26th Oct 20175:39 pmRNSHolding(s) in Company
26th Oct 20175:36 pmRNSHolding(s) in Company
23rd Oct 20175:10 pmRNSHolding(s) in Company
20th Oct 20178:00 amRNSHolding(s) in Company
19th Oct 201712:09 pmRNSWithdrawal of claim
17th Oct 20175:25 pmRNSHolding(s) in Company
16th Oct 20174:12 pmRNSResponse to Market Rumours
5th Oct 20177:30 amRNSAIM Notice
21st Sep 20178:32 amRNSHolding(s) in Company
21st Aug 20179:49 amRNSBoard and Management Changes
17th Aug 20175:58 pmRNSHolding(s) in Company
15th Aug 20178:19 amRNSTrading Update
7th Aug 20173:10 pmRNSHolding(s) in Company
19th Jul 20177:00 amRNSUpdate on claim relating to MRS Guernsey Ltd
30th Jun 20172:38 pmRNSHolding(s) in Company
26th Jun 20177:00 amRNSClaim received relating to MRS Guernsey Limited
8th Jun 20173:28 pmRNSGrant of Warrants to Non-Executive Directors
12th May 20177:50 amRNSAlign Research MRS note release
9th May 20173:20 pmRNSBoard decision concerning possible open offer
9th May 201710:42 amRNSIssue of shares to Align Research
8th May 201712:02 pmRNSHolding(s) in Company
5th May 201712:12 pmRNSHolding(s) in Company
5th May 201712:08 pmRNSHolding(s) in Company
5th May 201712:06 pmRNSHolding(s) in Company
5th May 20178:26 amRNSHolding(s) in Company
5th May 20177:45 amRNSShare Subscription
5th May 20177:30 amRNSRestoration - Management Resource Solutions Plc
5th May 20177:30 amRNSLifting of Suspension
2nd May 20173:04 pmRNSNew Website
27th Apr 20171:44 pmRNSResult of General Meeting
27th Apr 20178:08 amRNSUpdate prior to General Meeting
19th Apr 20177:00 amRNSAdditional Placing
10th Apr 20175:40 pmRNSResults of Placing
10th Apr 20174:37 pmRNSPlanned Placing
7th Apr 20174:03 pmRNSHalf-year Report
4th Apr 20178:45 amRNSWithdrawal of requisition
30th Mar 20177:00 amRNSAnnual Financial Report
24th Mar 20179:09 amRNSUpdate on financing and suspension
17th Mar 20177:00 amRNSDirectorate Changes
13th Mar 20174:22 pmRNSRequisition of General Meeting
8th Mar 20172:17 pmRNSUpdate on release of financial results
1st Mar 20173:46 pmRNSHolding(s) in Company
1st Mar 20171:25 pmRNSHolding(s) in Company
24th Feb 201712:21 pmRNSResult of General Meeting
21st Feb 20178:30 amRNSNotice of General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.